+
FRIDAY, SEPTEMBER 20, 190*
19
CROSS-HARBOUR TUNNEL APPROACH ROADS TO BE CLOSED
*****
THE APPROACH ROADS OF THE CROSS-HARBOUR TUNNEL WILL BE CLOSED TO TRAFFIC DURING THE FOLLOWING PERIODS FOR THE CONSTRUCTION OF THE HUNG HING ROAD FLYOVER:
MONDAY (SEPTEMBER 23) 1 AM TO 6 AM
* THE APPROACH ROAD LINKING THE CROSS-HARBOUR TUNNEL AND
THE CANAL ROAD FLYOVER WILL BE CLOSED TO TRAFFIC. VEHICLES FROM THE CROSS-HARBOUR TUNNEL WILL BE DIVERTED TO THE CAUSEWAY BAY SLIP ROAD, VICTORIA PARK ROAD EASTBOUND, GLOUCESTER ROAD FLYOVER AND GLOUCESTER ROAD WESTBOUND TO REJOIN CANAL ROAD FLYOVER. VEHICLES ON CANAL ROAD FLYOVER WILL BE DIVERTED TO THE
*
DOWN RAMP TO VICTORIA PARK ROAD EASTBOUND, GLOUCESTER ROAD FLYOVER, GLOUCESTER ROAD WESTBOUND AND THE FLYOVER LEADING TO CROSS-HARBOUR TUNNEL.
THE SLIP ROADS LEADING FROM THE CROSS-HARBOUR TUNNEL TO NORTH POINT AND CENTRAL WILL BE CLOSED TO TRAFFIC. VEHICLES WILL BE DIVERTED TO THE CAUSEWAY BAY SLIP ROAD, VICTORIA PARK ROAD EASTBOUND AND GLOUCESTER ROAD FLYOVER. TRAFFIC HEADING FOR CENTRAL WILL HAVE TO PROCEED TO GLOUCESTER ROAD WESTBOUND WHILE TRAFFIC HEADING FOR NORTH POINT WILL BE DIVERTED TO GLOUCESTER ROAD SOUTHBOUND AND CAUSEWAY ROAD.
TUESDAY (SEPTEMBER 24) 1 AM TO 6 AM
THE APPROACH ROAD LEADING FROM GLOUCESTER ROAD TO CROSS- HARBOUR TUNNEL WILL BE CLOSED TO TRAFFIC. VEHICLES ON GLOUCESTER ROAD WILL BE DIVERTED TO THE CANAL ROAD FLYOVER INTERCHANGE, CANAL ROAD EAST, CANAL ROAD WEST AND CANAL ROAD FLYOVER TO CROSS-HARBOUR TUNNEL.
WEDNESDAY (SEPTEMBER 25) 1 AM TO 6 AM
THE SLIP ROAD LEADING FROM THE CROSS-HARBOUR TUNNEL TO CAUSEWAY BAY WILL BE CLOSED TO TRAFFIC. VEHICLES FROM THE CROSS-HARBOUR TUNNEL WILL BE DIVERTED TO THE SLIP ROAD TO HAPPY VALLEY, CANAL ROAD FLYOVER, CANAL ROAD EAST, MORRISON HILL ROAD, TIN LOK LANE AND HENNESSY ROAD TO CAUSEWAY BAY.
120
Page 20Page 21
No comments yet.
Private notes are available after approval.