SHAM SHUI PO:
بيا
3
SUNDAY, JANUARY 13, 1985
HARD-SURFACE FOOTBALL PITCH AT
PO ON ROAD PLAYGROUND
BASKETBALL COURT AND VOLLEYBALL COURT AT
SHEK KIP ME CENTRAL PLAYGROUND MINI-SOCCER PITCHES AT FA HUI PARK MAPLE STREET PLAYGROUND
UN CHAU STREET ESTATE PLAYGROUND NO. 2 CHEUNG SHA WAN PLAYGROUND
WONG TAI SIN:
TSZ WAN SHAN ESTATE CENTRAL PLAYGROUND TUNG TAU ESTATE PLAYGROUND NO. 2
YAU MA TEI:
HARD-SURFACE MINI-SOCCER PITCH AT KING GEORGE V
MEMORIAL PARK
URBAN COUNCIL CENTENARY GARDEN (SITE 10)
HARD-SURFACE MINI-SOCCER PITCH AT KOWLOON PARK
INTERCHANGE FOR NT CIRCULAR ROAD SYSTEM PROPOSED ****
THE ENGINEERING DEVELOPMENT DEPARTMENT PROPOSES TO PROVIDE A GRADE-SEPARATED INTERCHANGE AT THE EXISTING JUNCTION OF LOK MA CHAU ROAD AND CASTLE PEAK ROAD.
THE INTERCHANGE IS TO CONNECT TWO TRUNK ROADS WHICH HAVE BEEN PROPOSED AS PART OF THE NEW TERRITORIES CIRCULAR ROAD SYSTEM.
ONE OF THE PROPOSED TRUNK ROADS WILL FORM A SECTION OF THE NEW TERRITORIES CIRCULAR ROAD, IT WILL STRETCH FOR ABOUT
12 KILOMETRES FROM AU TAU TO FAN KAM ROAD AND PASS THROUGH MAI PO, SAN TIN AND KHU TUNG.
INITIALLY, THIS WILL BE A DUAL TWO-LANE CARRIAGEWAY WITH SERVICE ROADS. ADDITIONAL LANES WILL BE CONSTRUCTED ON THE CENTRAL RESERVATION IF THERE IS A NEED AT A LATER DATE TO WIDEN THE CARRIAGEWAY TO DUAL THREE LANES.
WITH THE RECENT PROPOSAL FOR A VEHICULAR BORDER LINK AT LOK MA CHAU, THE SOUTHERN END OF WHICH WILL JOIN THE NEW TERRITORIES CIRCULAR ROAD AT THE JUNCTION OF LOK MA CHAU ROAD AND CASTLE PEAK ROAD, IT IS NECESSARY TO AMEND THE AUTHORISED PLAN AND SCHEME FOR THE FIRST PROJECT TO INCLUDE A GRADE-SEPARATED INTERCHANGE FOR CONNECTING THE TWO TRUNK ROADS.
/THE PROPOSED
No comments yet.
Private notes are available after approval.