XN000022-1984-12-21 — Page 16

Daily Information Bulletin 新聞公報 All

15

FRIDAY, DECEFER 21, 1984

EXISTING

REVISED

(HK$)

(HK$)

(A) PRIVATE CAR OR TAXI

4.00

5.00

(B) MOTOR CYCLE

2.00

2.50

(C) LIGHT BUS

7.00

9.00

(D) BUS

7.00

9.00

(E) GOODS VEHICLE NOT EXCEEDING

5.31 TONNES

7.00

9.00

(F) GOODS VEHICLE EXCEEDING

5.31 TONNES

11.00

13.00

G) GOODS VEHICLE EXCEEDING

12.73 TONNES

16.00

18.00

THE OPPORTUNITY IS ALSO TAKEN TO ROUND UP THE METRIC UNITS USE IN THE FARE ORDER.

EM ISS ION-CONTROL EQUIPMENT FOR INCINERATORS

****

LAI CHI KOK'S TWO INCINERATION PLANTS WILL BE FITTED WITH EQUIPMENT TO REDUCE CHIMNEY EMISSIONS,

THE WORK WILL INCLUDE THE DESIGN, SUPPLY AND INSTALLATION OF EIGHT ELECTROSTATIC PRECIPITATORS, FOUR WASTE HEAT BOILERS AND ONE TURBO-ALTERNATOR AT BOTH ITS A' AND 'B' PLANTS.

BESIDES PROVIDING THE EQUIPMENT, THE SUCCESSFUL CONTRACTOR MUST DEMOLISH THE EXISTING GAS CLEANING PLANTS, RELOCATE EIGHT INDUCED-DRAUGHT FANS, AND MODIFY THE EXISTING EQUIPMENT TO SUIT THE REQUIREMENTS OF THE FUTURE INSTALLATION.

A NOTICE INVITING APPLICATIONS FROM SUPPLIERS AND CONTRACTORS FOR INCLUSION IN THE PREQUALIFICATION LIST IS PUBLISHED IN TODAY'S GAZETTE.

FORMAL TENDERS FOR THIS PROJECT MAY BE INVITED IN MID-1985.

DEMOLITION OF EXISTING GAS CLEANING EQUIPMENT, CONSTRUCTION AND ERECTION OF NEW EQUIPMENT WILL BE CARRIED OUT IN TWO PHASES.

PHASE I IS FOR MODIFICATION WORK TO THE 'B' PLANT AND IS SCHEDULED TO COMMENCE IN MID-1986. PHASE II FOR THE 'A' PLANT WILL START TWO YEARS LATER.

THE WORK WILL BE SUPERVISED BY THE ELECTRICAL AND MECHANICAL SERVICES DEPARTMENT.

..

/16

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.