FRIDAY, NOVEMBER 16, 1984
12
ACCESS ROAD PLANNED FOR NORTH POINT
*****
THE GOVERNMENT PROPOSES CONSTRUCTING AN ACCESS ROAD FROM FORTRESS HILL ROAD TO SERVE THE FUTURE DEVELOPMENT ABOVE THE MASS TRANSIT RAILWAY CORPORATION'S FORTRESS HILL STATION IN NORTH POINT.
THE 150-METRE-LONG, DUAL SINGLE-LANE CARRIAGEWAY IS PART OF A PROPOSAL THAT INCLUDES THE FORMATION AND CONSTRUCTION OF A BUS BAY ON KING'S ROAD IN FRONT OF THE STATION, A WATERWORKS AND DRAINAGE RESERVE AND A PEDESTRIAN FOOTWAY AND STAIRCASE TO LINK KING'S ROAD AND FORTRESS HILL ROAD.
IN ADDITION, A PORTION ON THE EASTERN SIDE OF FORTRESS HILL ROAD FRONTING THE PROPOSED ACCESS ROAD IS TO BE WIDENED TO PROVIDE A PASSING BAY FOR TRAFFIC AND A NEW FOOTPATH.
A NOTICE CONCERNING THE PROPOSED WORKS IS PUBLISHED IN TODAY'S (FRIDAY'S) GOVERNMENT GAZETTE.
A PLAN SHOWING THE PROPOSED WORKS CAN BE SEEN AT THE CENTRAL AND WESTERN DISTRICT ENQUIRY SUB-OFFICE, CENTRAL GOVERNMENT OFFICES, WEST WING, MAIN ENTRANCE LOBBY; AT THE DISTRICT LANDS OFFICE, HONG KONG ISLAND (NORTH), 25 HARBOUR ROAD, HARBOUR CENTRE, 12TH FLOOR, HONG KONG; AND AT THE EASTERN DISTRICT OFFICE, 884-886 KING'S ROAD, HONG KONG.
OBJECTIONS TO THE PROPOSAL MUST BE SUBMITTED IN WRITING TO THE SECRETARY FOR LANDS AND WORKS NOT LATER THAN JANUARY 15, 1985.
14-KILOMETRE AQUEDUCT BREAK THROUGH
****
A MAJOR PHASE IN THE ENGINEERING WORKS PROJECT FOR RECEIVING ADDITIONAL WATER SUPPLY FROM CHINA WAS COMPLETED TODAY (FRIDAY).
AT A CEREMONY TO MARK THE COMPLETION OF TUNNEL-DRIVING IN FUNG KAT HEUNG NEAR YUEN LONG, THE SECRETARY FOR LANDS AND WORKS MR NICKY CHAN, PRESSED A BUTTON TO BLAST OPEN THE REMAINING PORTION OF A 14-KILOMÈTRE LONG TUNNEL BETWEEN MUK WU AND TAI LAM CHUNG.
ALSO PRESENT AT THE BREAK-THROUGH CEREMONY WERE THE DIRECTOR OF XINHUA NEWS AGENCY (HONG KONG BRANCH), MR XU JIATUN; THE MANAGING DIRECTOR OF CHINA CONSTRUCTION ENGINEERING CORPORATION'S (CCEC) HEAD OFFICE IN PEKING, MR ZHANG ENSHU; THE MANAGING DIRECTOR OF CCEC IN HONG KONG, MR GU TIANXUN, AND THE DIRECTOR OF WATER SUPPLIES, MR TOM TOMLINSON.
THE CONSTRUCTION
No comments yet.
Private notes are available after approval.