11
FRIDAY, MARCH 9, 1984
JOINT OPERATION ****
A JOINT OPERATION ON FACTORY BUILDINGS WILL BE CARRIED OUT BY THE WEST DIVISION OF THE HONG KONG FIRE COMMAND AND THE HONG KONG REGIONAL OFFICE OF THE FIRE PROTECTION BUREAU IN THE ABERDEEN AREA ON MONDAY (MARCH 12).
PRESS REPRESENTATIVES WISHING TO COVER THE OPERATION SHOULD BE AT ABERDEEN FIRE STATION BEFORE 9.15 AM ON MONDAY (MARCH 12). A FIRE SERVICES INFORMATION OFFICER WILL BE ON HAND TO ASSIST.
D'AGUILAR STREET SECTION TO BE WIDENED
****
A SHORT UPPER SECTION OF D'AGUILAR STREET, CENTRAL, IS TO BE WIDENED TO ALLOW EMERGENCY VEHICLES TO ENTER.
TENDERS ARE BEING INVITED BY THE ENGINEERING DEVELOPMENT DEPARTMENT TO UNDERTAKE THE WORK, WHICH WILL START IN MAY AND TAKE NINE MONTHS TO COMPLETE.
AS PART OF THE PROJECT, THE LEVEL OF THE REST OF D'AQUILAR STREET IS TO BE RAISED SO THAT IT WILL BE THE SAME AS THAT OF LAN KWAI FONG AND WING WAH LANE, BOTH OF WHICH CONNECT WITH D'AGUILAR STREET.
BENCHES AND FLOWER BEDS WILL BE PROVIDED IN BOTH THOSE STREETS TO HELP BEAUTIFY THE AREA.
TENDER FORMS AND FURTHER PARTICULARS ARE AVAILABLE AT THE OFFICE OF THE CHIEF ENGINEER, HIGHWAYS (HK) DIVISION, ENGINEERING DEVELOPMENT DEPARTMENT, 9TH FLOOR, HENNESSY CENTRE, 500, HENNESSY ROAD, HONG KONG,
TRAM TRACK WORK AT SHAU KEI WAN ROAD
*****
TRAM SERVICES IN SHAU KEI WAN WILL START LATER THAN USUAL ON SUNDAY (MARCH 11) MORNING TO ALLOW FOR TRAM TRACK WORK AT SHAU KEI WAN ROAD.
THE FIRST TRAMS FROM SHAU KEI WAN WILL DEPART FOR WESTERN MARKET AND HAPPY VALLEY AT ABOUT 8.14 AM, WHILE THOSE FROM WESTERN MARKET AND HAPPY VALLEY WILL DEPART FOR SHAU KEI WAN AT ABOUT 7.40 AM.
BEFORE 7.40 AM, TRAM SERVICES FROM WESTERN MARKET WILL OPERATE UP TO QUARRY BAY ONLY.
0
/12
No comments yet.
Private notes are available after approval.