XN000022-1983-01-12 — Page 15

Daily Information Bulletin 新聞公報 All

14

WEDNESDAY, JANUARY 12, 1983

TSUEN WAN TRAFFIC ARRANGEME TS

****

SPECIAL TRAFFIC ARRANGEMENTS WILL BE INTRODUCED IN TSUEN WAN FOR ABOUT SIX MONTHS, FROM 10 AM ON FRIDAY (JANUARY 14), TO ALLOW FOR CONSTRUCTION OF THE TAI HO ROAD FLYOVER.

WESTBOUND VEHICLES ALONG CASTLE PEAK ROAD WILL NOT BE PERMITTED TO TURN LEFT INTO TAI HO ROAD SOUTHBOUND. TRAFFIC WILL BE DIVERTED VIA CHUNG ON STREET AND TSUEN WAN MARKET STREET.

VEHICLES TRAVELLING ALONG TSUEN WAN MARI.ET STREET WESTBOUND WILL NOT BE PERMITTED TO TURN RIGHT INTO TAI HO ROAD NORTHBOUND. HOWEVER, THEY WILL BE ALLOWED TO TURN LEFT TO TAI HO ROAD SOUTHBOUND AND MAKE U-TURNS AT THE SHA TSUI OAD ROUNDABOUT.

ON THE IR JOURNEYS TO TSUEN WAN FERRY, KB ROUTES 40 AND 48 WILL BE DIVERTED VIA TEXACO ROAD AND SHA TSU ROAD, NO. 52 VIA SHA TSUI ROAD AND NO. 39M VIA CASTLE PEAK ROD, KWOK SHUI ROAD, TEXACO ROAD AND SHA TSUI ROAD.

NO. 30 ON KOWLOON-BOUND JOURNEYS WILL BE DIVERTED VIA TSUEN KING CIRCUIT, CASTLE PEAK ROAD AND SHA TSUI POAD.

MAXICAB ROUTE NO. 80 WILL NOT CALL AT THE STOP OUTSIDE THE TSUEN WAN MTR STATION.

TEMPORARY ROAD CLOSURE IN A. PO

****

IN TAI PO, PO HEUNG STREET NEAR THE ACCES. ROAD TO PAN CHUNG WILL BE CLOSED TO TRAFFIC ON FRIDAY AND SATURDAY (JANUARY 14 AND 15) BETWEEN 12.01 AM AND 6 AN FOR ROAD WORKS.

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.