9
WEDNESDAY, SEPTEMBER 15, 1982
PLAN TO EASE TRAFFIC CONGESTION IN WONG TAI SIN
***
NEW TRAFFIC ARRANGEMENTS AIMED AT EASING CONGESTION IN WONG TAI SIN WILL BE INTRODUCED FROM 10 AM ON FRIDAY (SEPTEMBER 17).
UNDER THE SCHEME, SHA TIN PASS ROAD WILL BE CLOSED TO TRAFFIC AT ITS JUNCTIONS WITH LUNG CHEUNG ROAD, THEREBY REMOVING CONFLICTING TURNING MOVEMENTS AND IMPROVING TRAFFIC FLOW ALONG LUNG CHEUNG ROAD,
AFTER THE CLOSURE, TRAFFIC BETWEEN TSZ WAN SHAN AND WONG
TAI SIN WILL BE MAINTAINED VIA PO KONG VILLAGE ROAD.
KMB ROUTES NOS. 2F AND 3C, ON THEIR JOURNEYS TO TSZ WAN SHAN, WILL TURN FROM LUNG CHEUNG ROAD INTO PO KONG VILLAGE ROAD, WHILE
5C WILL TURN FROM CHOI HUNG ROAD INTO PO KONG VILLAGE ROAD. ROUTES 3A, 3B, AND 15A WILL TRAVEL ALONG CHOI HUNG ROAD AND PO KONG VILLAGE ROAD BEFORE TURNING INTO FUNG TAK ROAD.
KMB ROUTES NOS. 3A, 3B, 50 AND 15A ON SOUTHBOUND JOURNEYS FROM TSZ WAN SHAN, WILL REACH WONG TAI SIN VIA FUNG TAK ROAD, PO KONG VILLAGE ROAD AND CHOI HUNG ROAD,
THE FOLLOWING ROAD SECTIONS WILL BE DESIGNATED AS URBAN CLEARWAYS FROM 7 AM TO 10 AM AND FROM 4 PM TO 7 PM DAILY:
* FUNG TAK ROAD BETWEEN PO KONG VILLAGE ROAD AND A POINT
60 METRES WEST OF ITS JUNCTION WITH SHEUNG FUNG STREET;
* SHEUNG FUNG STREET BETWEEN FUNG TAK ROAD AND SHUNG WAH
STREET; AND
* TUNG TAU TSUEN ROAD BETWEEN SHA TIN PASS ROAD AND
MING TAK STREET.
CLEARWAY RESTRICTION WILL ALSO BE IMPOSED ON PO KONG VILLAGE ROAD BETWEEN ITS JUNCTION WITH FUNG TAK ROAD AND A POINT 85 METRES NORTH OF THAT JUNCTION EVERY DAY FROM 7 AM TO 7 PM,
AT THE SAME TIME, SOUTHBOUND VEHICLES ALONG SHEUNG FUNG STREET WILL BE BANNED FROM TURNING RIGHT INTO FUNG TAK ROAD, WHILE EASTBOUND VEHICLES ALONG FUNG TAK ROAD WILL BE BANNED FROM TURNING LEFT INTO SHEUNG FUNG STREET.
/10
Page 10Page 11
No comments yet.
Private notes are available after approval.