THURSDAY, DECEMBER 31, 1981
7
TEMPORARY CLOSURE OF GASCOIGNE ROAD FLYOVER
* * * *
THE EAST-BOUND CARRIAGEWAY OF GASCOIGNE ROAD FLYOVER WILL BE CLOSED TO TRAFFIC FOR SIX CONSECUTIVE NIGHTS BETWEEN THE HOURS OF 9 PM AND 5 AM FROM MONDAY TO SUNDAY (JANUARY 10) FOR MAINTENANCE WORK.
NORMAL TRAFFIC WILL BE MAINTAINED OUTSIDE THESE HOURS.
DURING THE CLOSURE. THE TRAFFIC WILL BE DIVERTED VIA FERRY STREET, JORDAN AND GASCOIGNE ROADS.
STUBBS ROAD TRAFFIC CHANGE
***
BOTH THE DOWNHILL AND UPHILL LANES IN STUBBS ROAD IN HAPPY VALLEY, NEAR TUNG SHAN TERRACE, WILL BE CLOSED TO TRAFFIC FROM 2 PM ON SATURDAY TO 7 AM ON MONDAY (JANUARY 4).
THESE LANES WILL ALSO BE CLOSED THE FOLLOWING SATURDAY (JANUARY 9) FROM 2 PM UNTIL 7 AM ON MONDAY (JANUARY 11) FOR ROAD WORKS.
DURING THE CLOSURE, ONE LANE TWO-WAY TRAFFIC WILL BE INTRODUCED.
/8
No comments yet.
Private notes are available after approval.