HORNSEY ROAD SECTION CLOSED FOR SIX WEEKS

****

A SECTION OF HORNSEY ROAD, BETWEEN OLD PEAK ROAD AND GLENEALY JUNIOR SCHOOL IN MID-LEVELS, WILL BE CLOSED TO VEHICULAR TRAFFIC FOR ABOUT SIX WEEKS FROM 7 AM TOMORROW (JULY 1).

THE TEMPORARY CLOSURE WILL FACILITATE THE LAYING OF GAS AND WATER MAINS.

A TRANSPORT DEPARTMENT SPOKESMAN SAID TODAY THAT THE REMAINING SECTION OF HORNSEY ROAD, BETWEEN CONDUIT ROAD AND GLENEALY JUNIOR SCHOOL, WOULD BE ROUTED AS A TWO-WAY CUL-DE-SAC CONTROLLED BY TEMPORARY TRAFFIC LIGHTS, AND WOULD BE RESTRICTED TO VEHICLES REQUIRING ACCESS TO GLENEALY JUNIOR SCHOOL,

VEHICLES ALSO WOULD NOT BE ALLOWED TO TURN LEFT FROM GLENEALY INTO HORNSEY ROAD AT THE CONDUIT ROAD - GLENE ALY HORNSEY ROAD JUNCTION.

VEHICLES REQUIRING ACCESS TO GLENEALY JUNIOR SCHOOL VIA HORNSEY ROAD SHOULD TRAVEL ALONG CONDUIT ROAD FROM THE WEST.

PARTIAL CLOSURE OF ROADS

*****

A TEMPORARY PARTIAL CLOSURE OF PARTS OF HENNESSY ROAD AND LUARD ROAD ADJACENT TO SOUTHORN PLAYGROUND WILL BE EFFECTED AS FROM JULY 7 TO FACILITATE THE CONSTRUCTION OF THE MTR WAN CHAI STATION, THE PUBLIC WORKS DEPARTMENT ANNOUNCED TODAY.

HENNESSY ROAD WILL BE REDUCED TO TWO TRAFFIC LANES IN EACH DIRECTION AND ITS SOUTHERN FOOTPATH REDUCED TO TWO-METRE WIDTH. LUARD ROAD WILL BE REDUCED TO SIX-AND-A-HALF-METRE WIDTH AND THE FOOTPATH ON THE EASTERN SIDE WILL BE CLOSED.

THE AREAS AFFECTED BY THE PARTIAL CLOSURE ARE SHOWN ON PLAN NO. MT/G/153/A, A COPY OF WHICH CAN BE EXAMINED AT THE MASS TRANS IT OFFICE, ROOM 416 MURRAY BUILDING, GARDEN ROAD, HONG KONG.