FRIDAY, AUGUST 18, 1978
IMPROVEMENTS TO KWAI CHUNG INTERSECTION
*****
THE PUBLIC WORKS DEPARTMENT HAVE INVITED TENDERS FOR THE FIRST STAGE OF IMPROVEMENTS TO THE INTERSECTION OF CASTLE PEAK AND KWAT CHUNG ROADS AS PART OF THE DEVELOPMENT OF TSUEN WAN NEW TOWN.
THE IMPROVEMENTS INCLUDE A FURTHER EXPANSION OF THE ROAD SYSTEM AND ARE EXPECTED TO BE CARRIED OUT IN OCTOBER THIS YEAR FOR COMPLETION IN ABOUT 18 MONTHS.
A DIRECT LINK WILL BE CONSTRUCTED FROM CASTLE PEAK ROAD TO CHEUNG WING ROAD AND A ROUND-ABOUT SYSTEM INTRODUCED TO IMPROVE THE FLOW OF TRAFFIC THROUGH THE SIGNAL CONTROLLED INTERSECTION.
THE WORK HAS BEEN DESIGNED AND CONSTRUCTION WILL BE SUPERVISED BY THE NEW TERRITORIES DIVISION OF THE HIGHWAYS OFFICE ON BEHALF OF THE TSUEN WAN NEW TOWN DEVELOPMENT, PUBLIC WORKS DEPARTMENT.
0
RE-ROUTING OF KWOK SHUI ROAD
***
THE TRANSPORT DEPARTMENT ANNOUNCED TODAY THAT FROM 10 A.M. TOMORROW (SATURDAY) A NUMBER OF TRAFFIC ARRANGEMENTS WILL BE IMPLEMENTED IN KWAI CHUNG, THE NEW TERRITORIES TO IMPROVE THE TRAFFIC FLOW IN THE AREA.
UNDER THE ARRANGEMENTS, THE SECTION OF KWOK SHUI ROAD BETWEEN CHEUNG WING ROAD AND LEI MUK ROAD WILL BE RE-ROUTED FROM TWO WAY TRAFFIC TO ONE-WAY WESTBOUND.
SOUTHBOUND TRAFFIC FROM TAI YUEN STREET WILL BE PROHIBITED FROM TURNING LEFT ONTO KWOK SHUI ROAD,
FURTHERMORE, EASTBOUND TRAFFIC ALONG KWOK SHUI ROAD WISHING TO GO TO LEI MUK ROAD SHOULD TURN LEFT ONTO CHEUNG WING ROAD AND THEN TURN RIGHT ONTO WO YI HOP ROAD WHICH CONNECTS WITH LEI MUK ROAD.
APPROPRIATE TRAFFIC SIGNS WILL BE SET UP TO ASSIST MOTORISTS.
17
***
No comments yet.
Private notes are available after approval.