MONDAY, JULY 11, 1977
9
TEMPORARY CLOSURE OF ACCESS FLYOVER TO THE CROSS HARBOUR TUNNEL ******
THE TRANSPORT DEPARTMENT HAS ANNOUNCED THAT THE ACCESS FLYOVER LEADING TO THE CROSS HARBOUR TUNNEL FROM THE CANAL ROAD FLYOVER WILL BE CLOSED TO TRAFFIC FOR THREE DAYS BETWEEN 1 A.M. AND 6 A.M. BEGINNING ON WEDNESDAY (JULY 13).
THE TEMPORARY CLOSURE IS TO ENABLE ROAD RESURFACING TO BE CARRIED OUT.
DURING THE CLOSURE PERIODS, TRAFFIC PROCEEDING TO THE TUNNEL WILL BE DIVERTED VIA THE CAUSEWAY BAY FLYOVER AND THE SLIP ROAD FLYOVER ON WATERFRONT ROAD.
APPROPRIATE TRAFFIC SIGNS WILL BE PUT UP TO GUIDE MOTORISTS.
о
NIGHT CLOSURE OF CHING CHEUNG ROAD
*****
THE TRANSPORT DEPARTMENT ANNOUNCED THAT CHING CHEUNG ROAD WILL BE CLOSED TO ALL TRAFFIC BETWEEN 1.15 A.M. AND 5.45 A.M. ON FRIDAY (JULY 15).
THE CLOSURE IS TO ENABLE WORK ON THE CONSTRUCTION OF
A FOOT-BRIDGE ACROSS THE ROAD.
BOTH WESTBOUND VEHICLES FROM LUNG CHEUNG ROAD OR TAI PC ROAD AND EASTBOUND VEHICLES FROM KWAI CHUNG ROAD OR CASTLE PEAK ROAD WILL BE RE-ROUTED TO CHEUNG SHA WAN ROAD OR LAI CHI KOK ROAD.
APPROPRIATE TRAFFIC SIGNS WILL BE POSTED TO GUIDE MOTORISTS.
No comments yet.
Private notes are available after approval.