17
·
THURSDAY, NOVEMBER 11, 1976
RE-OPENING OF ELECTRIC AND JAVA ROADS
******
THE SECTIONS OF ELECTRIC AND JAVA ROADS THAT HAVE BEEN CLOSED TO FACILITATE CABLE-LAYING WORKS WILL BE OPENED TO TRAFFIC FROM 10 A.M. ON SATURDAY (NOVEMBER 13).
THE SECTIONS ARE THE WESTBOUND CARRIAGEWAY OF ELECTRIC ROAD BETWEEN JAVA ROAD AND WATSON ROAD, AND THE WESTBOUND CARRIAGEWAY OF JAVA ROAD BETWEEN KAM HONG STREET AND ELECTRIC ROAD.
CHINA MOTOR BUS ROUTE 23 (TO POKFIELD ROAD) AND ROUTE 80 (TO CENTRAL) WILL REVERT BACK TO OPERATE WESTBOUND ALONG JAVA AND ELECTRIC ROADS AND ROUTE 23B (NORTH POINT FERRY TO PARK ROAD) WILL RESUME OPERATION AT NORTH POINT FERRY INSTEAD OF CAUSEWAY BAY MAGISTRACY CAR PARK.
IN KOWLOON, THE SLIP ROAD LEADING FROM THE EASTBOUND CARRIAGEWAY OF LAI CHI KOK BAY BRIDGE TO LAI CHI KOK BEACH ROAD NEAR ME FOO SUN CHUEN WILL BE CLOSED TO VEHICULAR TRAFFIC BETWEEN 8 A.M. OR SUNDAY (NOVEMBER 14) AND 6 A.M. ON MONDAY (NOVEMBER 15).
THE TEMPORARY CLOSURE IS TO FACILITATE ROAD RE-SURFACING WORKS IN THE AREA.
APPROPRIATE TRAFFIC SIGNS WILL BE PUT UP TO GUIDE MOTORISTS.
WATER CUT ****
WATER SUPPLY TO A NUMBER OF PREMISES IN HUNG HOM WILL BE TURNED OFF FOR FIVE HOURS FROM 1 A.K. ON SATURDAY (NOVEMBER 13) TO ENABLE THE WATERWORKS OFFICE TO CARRY OUT A NIGHT LEAKAGE TEST.
THE AREA AFFECTED IS BOUNDED BY LOK SHAN ROAD, CHI KIANG STREET AND KOWLOON CITY ROAD, INCLUDING SZE CHUEN STREET, HA HEUNG ROAD AND TO KWA WAN ROAD.
No comments yet.
Private notes are available after approval.