XN000022-1972-11-05 — Page 1

Daily Information Bulletin 新聞公報 All

PRH 7 4000091

K

|香港政府

GIS

新聞處

DAILY INFORMATION BULLETIN

Sunday, November 5, 1972

LASER LIGHT SYSTEM BEING USED IN CONSTRUCTION OF HIGH ISLAND TUNNELS

The construction of the $300 million tunnel system of the High

Island Reservoir, situated south-east of the Sai Kung Peninsula, is now well

underway.

Since the start of the project in January, more than 12 miles of

access road have been built and two miles of tunnels driven.

The 800-strong labour force is working on 11 portals and 8 shafts,

An unusual aspect of the tunnel construction is the use of the Laser

Beam system for survey work inside the tunnels.

The Laser forms a concentrated beam of light which is being used to

pinpoint the tunnel alignment. The device is suspended from the ceiling of

the tunnel and the thin red beam shines onto the face of the rock indicating

the line for tunnelling.

The particular Lager used in the High Island Tunnels has a range of

about 1,200 feet.

The Resident Engineer of the Eastern Tunnels, Mr. I.R.$. Robertson,

said that with the use of the Laser, the speed of the tunnel work will be

increased and a lot of manpower saved.

/He explained:

Issued by Government Information Services, Beaconsfield House, Hong Kong. Tel: 5-233191

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.