XN000022-1972-09-13 — Page 2

Daily Information Bulletin 新聞公報 All

04

Wednesday, September 13, 1972

The docks will also enable arriving passengers to ascend to the

arrival level in the terminal building.

A spokesman for the Civil Aviation Department said today: "With

the implementation of these more efficiently designed bus docks, it is

hoped to reduce or eliminate delays to passengers which would otherwise have been inevitable as a result of constantly increasing air traffic during the

course of the next few

#1 years.

It is also proposed that a second airbridge be installed at aircraft

parking bays Nos. 3, 4 and 5, in addition to the ones already approved for

each bay.

At present, bays 6 and 7 have three airbridges, and bay 8 two.

As a further step to aid in the docking of aircraft at these

airbridges, automatic guidance equipment will be fitted in bays 3, 4, 5, 6 and 7. "This guidance equipment has been tried in bay 8 and was found to

be successful," the spokesman added.

The overall Stage IV project includes expansion of all public and passenger waiting areas, additional office accommodation, a multi-storey car park, an enlarged arrivals hall, a new mechanised outgoing baggage handling system and an enlarged incoming baggage handling system.

The estimated cost of Phase I of this project will now be $35 million

with the addition of the new bus docks and extra airbridges.

"The whole of Stage IV will eventually allow the terminal building

to provide a capability of handling passengers at the rate of 3,200 per hour," the spokesman concluded.

13

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.