1948-07-28 — Page 2

China Mail 德臣西報 中國郵報 All

JULY 24, 1048

Rail ends clamped together in jig and a ratchet operat- ed milling outter being used to face up the rail ends prior to the Thermit Welding operation,

CHINA MAIL Wİ

Mould In position over rail joint; same being pre heated and the crucible being filled with Welding-

Liquid steel runni

Thermit

cooled aff; the two rạ

--Photos-above and below, show_new_tramcar bodies in early and advanced state

of contruction,

background tramcar

Tramcar truck being re-assembled

and in

body shown elevated on hoist and truck stripped for overhaul,

axis-

Tramose truck-being re-assembled.. New - ly tyred wheels, osar wheels and boxes also shown.

Part

view (eight) of

Electrical Shop

showing rewinding, of trambar motor arma»,

tures in progress. (

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.