( A 65 )
SPECIFICATION OF TAXES, DUTIES, &c.
Act of Colonial Legislature or other Authority under which levieil.
FEES OF COURT OR OFFICE, &c.,—Continued.
SURVEY OF STEAMSHIPS; -
Item.
Fee.
for each subsequent inspection
—
Testing composition intended for sheathing ship's decks in place of
wood, each test
T
Inspection of underwater side-scuttles (Circ: 1485) for ship not under survey for passenger certificate or load-line,-for each 15 side- scuttles or part thereof including tests of materials In-pections of drawings of standard design of a side-scuttles, disebarge valve, watertight door, fire-resisting door or any other fittings for closing openings in the ship's sides, watertight and fire-resist- ing bulkheads,-for each design ...
Inspection of fittings and equipients under the Piracy Prevention
Ordinance,—when first fiited
Inspection of explosives magazine
...
30.00
30.00
37.50
15.00
15.00
**
*
60.00
Testing sample deck flares and lifelinoy lights submitted by makers-
each set of samples
30.00
+
Inspecting and testing chemical fire extinguishers either when first
submitted or after alteration,—for first visit
30.00
for each subsequent visi..........
15.00
Boilers, Machinery, etc.
Survey of a marine eugine:-
Cylinder Area not above 100 circular inches
30.00
Cylinder Area above 100 anıl not above 250 circular inches Cylinder Area above 250 and not above 500 circular inches Cylinder Area above 500 and not above 1,000 circular inches,
45.00
75.00
or of turbines of 1,000 shaft h.p. or under
For every additional 1,000 circular inches or 750 shaft h.p. or
part thereof
135.00
Ordinance 10 of 1899
90.00
+
*
for every additional superheater for single-ended boilers in the
saine ship
Survey of one superheater for a single-ended boiler
(A double-ended boiler is to be counted as two single-ended boilers). Sarvey of tharine boilers
Sarvey of mountings for one marine boiler
for every additional similar set
Survey of one evaporator
601
*
•
See Regula- tion 17. |
and Regulations, Table
C.
45.00
37.50
45.00
22.50
37,50
Sarvey of one feed heater
22.50
10
Survey of one food filter...
22.50
Survey of one distiller.....
22.50
Survey of one water circulator
22.50
for each additional evaporator, feed heater, feed filter, distiller
or water cirenlaton
22.50
Survey of an installation for burning oil fuel $60 plus $30 for first
boiler, minimum
90.00
for every additional boiler
30.00
(A double-ended boiler is to be counted as two single-ended boilers).
Survey during construction of heaters and filters for use in connection
with oil-fuel installations, for each item inspected.
Sersey of one or two safety valves
for every additional similar safety valve included in the same
order
144
Inspection of finished manhole doors and compensating rings,—for
the first 15, or portion of 15, inspected at the same time...
for each additional 15, or portion of 15, included in the
same order and inspected at the same time
7.50 15.00
7.50
*
30.00
15.00
C5
No comments yet.
Private notes are available after approval.