SPECIFICATION OF TAXES, DUTIES, &c.
Act of Colonial Legislature or other Authority under which levied.
FRES OF COUrt or Office, &c.,—Continued,
SURVRT OF STEAMSHIPS :—
Item.
Fre.
10
20
20
20
Ordinance 10 of 1899,
Table C.
Test and Inspection of Steel and Other Materials when Certificates of Tests are not Produced.
Witnessing tests of steel or iron plates or bars,-15 plates or bars, or
portion thereof, tested
Witnessing tests of steel or iron plates and bars included in one and the same order and made at the same works,—15 plates and bars in the aggregate, or portion thereof, tested Witnessing special bending tests of a set of plates, etc. (i.e., tests additional to those usually required by the Board of Trade),—for 15 plates, or purtion thereof, tested Witnessing tests of steel forgings for an engine when all the forgings
are made by the same maker, and not more than two visits by the Surveyor are required, for 15 forgings, or portion thereof, tested
...
A door with its own ring is counted as one article, separate doors and rings as one euch.
For each additional visit beyond two made by the Surveyor in con-
nection with the tests of forgings, plates, bars, etc.
Inspection and tests of one or two steel furnaces
J
for each additional furnace included in the same order
Inspection and tests of one or two steel forgings, or steel castings for
stem stern-post, rudder, etc., if made by the same maker
for each additional forging, or casting as the case may be, by
the same maker, included in the same order
Witnessing tests of solid drawn steel steam pipes,-for ench 15, or
portion of 15, tests of the material made
for each 30, or portion of 30, pipes tested by hydraulic pressure Inspection of wrought iron steam pipes, including hydraulic test,- for
each 15, or portion of 15, pipes inspected........
...
Inspection and tests of boiler tubes subject to external pressure:-
Lapwelded iron tubes and lapwelded or solid drawn steel tubes for which a stress greater than that allowed for iron is not required, for the first 100, or part of 100, tubes for each succeeding 100, or part of 100, tubes
Lapwelded or solid drawn steel tubes for which a stress greater than
that allowed for iron is required,—
for the first 100, or part of 100 tubes
for each succeeding 100, or part of 100 tubes
Inspection and tests of boiler tubes subject to internal pressure,
for each 15 or portion of 15 tested for tensile strength and
ductility
for each 90 or portion of 90 tubes tested by hydraulic
pressure
+
Inspection test and stamping of superheater headers for stock,-for each 15 or portion of 15 tubes tested for tensile strength and by bending, in one order
for ench 50 tubes or portion of 50 tubes stamped in one ordur for each visit beyond two made in connection with the order Inspection of plates after flanging or working,-for each 15, or
portion of 15, inspected at the same time
*
(The fees for witnessing tests of plates, bars, forgings, eto. cover one order only, and separate fees must be puid for each order, although the plates, bars, etc., for different orders may be tested at one time).
Testing bronze propeller blades for ships not under survey for passen- ger certificate when all the castings are made by the same maker for the same ship and not more than two visits by the Surveyor are required, for 4 or fewer castings tested
for each additional visit beyond two made by the Surveyor..
$ 20
20
20
20
10
20
10
20
98 8 9 9 8
1
201
15
30
20
20
==
15
AZ
20
20
10
20
225
20
10
61