SPECIFICATION OF TAXES, DUTIES, &c.
Act of Colonial Legislature or other Authority under which levied.
FEES OF COLrt or ÖfficE, &c.,—Continuad,
SURVEY OF STEAMSHUPS:—
Item.
Fee.
(A double-ended boiler is to be counted as two single-ended boilers).
Survey of marinė boilers
Survey of mountings for one marine boiler
for every additional similar set
Survey of one evaporator
Survey of one food heater
Survey of one food filter...
Survey of one distiller...
Survey of one water cirenlator
for each additional evaporator, food heater, food filter, distiller
or water circulator
Survey of an installation for burning oil fuel $40 plus 820 for first
Boiler, minimum
for every additional boiler
(A double-ended boiler is to be counted as two single-ended boilers).
Survey during construction of heaters and filters for use in connection
with oil fuel installations, for each item inspected.
Survey of one or two safety valves
for every additional similar safety valve included in the same
order
Inspection of finished manhole doors and compensating rings.-for
the first 15, or portion of 15, inspected at the same time.....
For each additional 15, or portion of 15, included in the
same order and inspected at the same time
Test and Inspection of Sted and Other Materials when Certificates of Tests are not Produced,
See Regula-
tion 17.
$ 30
15
25
15
15
15
15
15
85
60
20
Ea
5
10
1.
2220
10
Ordinance 10 of 1899.
...j
20
Table C.
Witnessing tests of steel or iron plates of bars.-15 plates or bars, or
portion thereof, tested Witnessing tests of steel or iron plates and bars included in one and
the same order and made at the same works,-15 plates and bars' in the aggreate, or portion thereof, tested ... Witnessing special bending tests of a set of plates, etc. (ie., teste additional to those usually required by the Board of Trade),—for 15 plates, or portion thereol, tested Witnessing tests of steel forgings for an engine when all the forgings
...
are made by the same maker, and not more than two visits by the Surveyor are required,—for 15 forgings, or portion thereof, tested
-
A door with its own ring is counted as one article, separate doors) and rings as one each.
For each additional visit beyond two made by the Surveyor in con-'
nection with the tests of forgings, plates, bars, etc.
Inspection and tests of one or two steel furnaces
for each additional furnace included in the same order
Inspection and tests of one or two steel forgings, or steel castings for
stem stern-post, rudder, etc., if made by the same maker
for ench additional forging, or casting as the case may be, by
the same makor, included in the same order Witnessing tests of solid drawn steel steam pipes,—for each 15, or
portion of 15, tests of the material made
for each 30, or portion of 30, pipes tested by hydraulic pressure Inspection of wrought iron steam pipes, including hydraulic test,- for
cach 15, or portion of 15, pipes inspected...
Inspection and tests of boiler tubes subject to external pressure:-
Lapwelded iron tubes and lupwelded or solid drawn steel tubes for which a stross greater than that allowed for iron is not required, for the first 100, or part of 100, tubes for each succeeding 100, or part of 100, tubes
20
20
20
10
20
10
Į
N NNE 20 525
10
20
20
20
20
15