1930 — Page 52

Blue Books 香港計冊 All

50

(A 50 )

SPECIFICATION OF TAXES, DUTIES, &o.

Act of Colonial Legislature or other Authority under which levied.

SURVEY OF STeamships,—Continued,

(e) For every additional boiler made to the same design by the same makers three-fourths of the fee is to be charged.

(d) For the survey of any other marine boiler intended for a ship, or of ench boiler on board a ship when the examination of the boilers is not included in or covered by any other survey, one-half the fee is to be charged.

(e) The survey fee covers the issue of a certificate of survey if such is re- quired.

Miscellaneous Surveys and Inspections.

18. (a) The following fees are to be charged for surveys and inspections, other than those included in and covered by the survey for a passenger certificate, if made at the request, and for the convenience of, ship-owners, ship-builders, engine-builders, boiler-makers and others.

(b) For a certificate of inspection of any particular item, if required, an additional feo of $15 is to be charged and $5 for a duplicate copy or for an amend- ed certificate when incorrect information has been supplied.

(c) These certificates are issued by the Government and not by the Surveyors who make the surveys or inspections.

(d) Scule of fees :-

Item:.

Fer.

Hull (Designs and Details) and Equipments.

Preliminary examination of a proposed design of a passenger ship Survey of double bottoms or other tanks forming part of the ship's

structure and intended for storage of oil fuel

.

60

30

ཆཙ

Survey of one or two watertight bulkhead doors if tested at the same

time at the makers works

10

for every additional visit for doors included in the same order Survey in connection with coal-trimmers escape-holes, for not more

than two visits

for each additional visit

29 89

10

10

Ordinance 10 of 1899,

Table C.

20

10

Inspection of underwater side-scuttles (Circ: 1485) for ship not under survey for passenger certificate or load-line,-for each 15 side- scuttles or part thereof including tests of materials Inspections of drawings of standard design of a side-scuttles, discharge valve, watertight door, fire-resisting door or any other fittings for closing openings in the ship's sides, watertight and fire-resist- ing bulkheads, for each design Inspection of fittings and equipments under the Piracy Prevention

Ordinance, when first fitted

-

for each subsequent inspection

Inspection of explosives magazine

***

***

101

Testing composition intended for sheathing ship's decks in place of

wood, each test

Testing sample deck flares and lifebuoy lights submitted by makers-

each set of samples

...

...

Inspecting and testing chemical fire extinguishers either when first

submitted or after alteration,—for first visit

for each subsequent visit....

...

20

20

25

2 399

10

10

40

92

20

20

10

Boilers, Machinery, etc.

Survey of a marine engine:-

Cylinder Area not above 100 circular inches

For every additional 1,000 circular inches or 750 shaft h.p. or

part thereof

Cylinder Area above 100 and not above 250 circular inches Cylinder Area above 250 and not abovo 500 circular inches Cylinder Aren above 500 and not above 1,000 circular in. or of

tarbines of 1,000 shaft h.p. or ander...

30

898

20

50

90

60

Survey of one superheater for a signal-ended boiler

30

for every additional superheater for single-ended boilers in the

same ship

25

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.