(F 12)
| Description of Works and where situated | Whether Finished or under Construction | Estimated Expenses / Amount of Repairs (Dollars) | Authority under which it is executed | When Commenced | Amount of Expenditure (Dollars) |
|---|---|---|---|---|---|
| PUBLIC WORKS EXTRAORDINARY—Contd. | |||||
| GENERAL WORK—Contd. | |||||
| DRAINAGE: | |||||
| Training Nullahs, Construction | Finished | 1,500.00 | Colonial Estimates 1929 | Vote | 1,355.62 |
| Miscellaneous Drainage Works, Construction | Finished | 5,000.00 | Colonial Estimates 1929 | Vote | 3,249.41 |
| Miscellaneous, Construction | Finished | 7,500.00 | C.S.O. 6684 of '11 | 6,378.90 | |
| Water Works, Construction | Finished | 1,000.00 | 783.02 | ||
| COMMUNICATION: | |||||
| Patrol Path from Lit Ma Hang to Sha Tan Kok, Construction | Finished | 50,000.00 | Colonial Estimates 1929 | Jan., 1929 | 9,943.60 |
| Reconditioning Roads, Construction | Finished | 30,000.00 | Colonial Estimates 1929 | June, 1929 | 27,660.97 |
| Widening Patrol Path—Sheung Shui to Tu Ku Ling to 10 ft. (Bridge $2,500), Construction | Finished | 8,500.00 | Colonial Estimates 1929 | Mar., 1929 | 5,082.35 |
| Access and Patrol Path to Lo Wu Railway Station Block House, Construction | Finished | 4,500.00 | Colonial Estimates 1929 | 2,477.53 | |
| Widening existing Road between Fanling and Sha Tan Kok upon removal of Railway, Construction | Finished | 10,000.00 | Colonial Estimates 1929 | 7,078.84 | |
| Tai Po Road Improvement—Bridge at 134 Miles, Construction | Not Commenced | 30,000.00 | Colonial Estimates 1929 | ||
| MISCELLANEOUS: | |||||
| Levelling Strip of land now occupied by the Railway Sha Tau Kok, Construction | Finished | 5,000.00 | Colonial Estimates 1929 | June, 1929 | 1,195.18 |
| Forming and surfacing Street in front of D.D.C. Lot 827 C and D and 828 C, Construction | 2,000.00 | Colonial Estimates 1929 | 1929 | ||
| Magnetic Huts, Au Tau—Fencing, Construction | Unfinished | 1,600.00 | Colonial Estimates 1929 | June, 1929 | 1,432.88 |
| 948.93 | |||||
| PUBLIC HEALTH AND BUILDINGS ORDINANCE: | |||||
| Compensation and Resumptions, Construction | 5,000.00 | Annual Vote | 2,223.10 | ||
| PUBLIC WORKS HONG KONG BUILDINGS: | |||||
| New Porch & approach to C.S.O. Building, Construction | Finished | 1,000.00 | C.S.O. 298 of '21 | 1.12.28 | 998.14 |
| Wireless Broadcasting Studio to meet the cost of Furniture, Piano, Carpet etc., Construction | Finished | 5,000.00 | C.S.O. 556 of '23 | 17.4.29 | 4,948.41 |
| New Building and mast at Cape D'Aguilar for W/T traffic, Construction | Unfinished | 15,000.00 | C.S.O. 894 of '28 | 24.10.29 | 1,582.30 |
| New Latrine in Water Street, Construction | 10,000.00 | C.S.O. 3 in 4879/29 | 25.11.29 | ||
| COMMUNICATION: | |||||
| Forming two Forestry Tracks into Bridle Paths, Construction | Finished | 25,000.00 | C.S.O. 596 of '26 | April, 1929 | 24,756.93 |
| Proposed Road connecting Garden Road and Bowen Road with May Road, Construction | Not Commenced | 57,000.00 | C.S.O. 543 of '19 | Oct., 1929 | 9,006.70 |
86
(F 12 )
Return of all Public Works, Civil Roads, Canals, Bridges, Buildings, &g,—Continued.
Descript on of Works and where situated.
Whether Finished
Whether Estimated Construct-,
Ex
ing or under
x ponses
iu
Authority under which it is executed.
When
Coin. menced.
Amontit of
Repaire.
Dollars.
or Ug. finished.
Expenditure.
PUBLIC Works ExtraordINARY,—Contd.
GENERAL WORK,—Contd.
Colonial Estimates 1929.
DRAINAGE :—
Training Nullahs,
Con- struction.
1,500.00
138
Anuunt Finished.
1,355.62
vote.
Miscellaneous Drainage Worke,
Do.
5,000.00
139
3,249.41
*
"
Miscellaneous.......
До.
7,500.00
2,200.00 C.S.0. 6684 of '11
140
6,378,90
--
to
Water Works,
Do.
1,000,00
141
783.02
H
COMMUNICATION.
Patrol Path from Lit Ma Hang to Sha
Tan Kok,
Do.
50,000,00
142
Reconditioning Roads,
Do.
30,000,00
143
June, 1929
floished. Jan., 1929 Finished.
9,943.60
27,660.97
Widening Patrol Path-Sheung Shui to Tu
Ku Ling to 10 ft. (Bridge $2500),
Do.
8,500,00
111
Mar., 1929
Co- finished.
5.082.35
Access and Patrol Path to Lo Wu Rail-
way Station Block House,.....
Do.
4,500,00
145
2.477.53
44
**
Widening existing Road between Fanling
and Sha Tan Kok upon removal of Railway,....
Do.
10,000.00
146
Finished. 7,078.84
+
Tai Po Road Improvement-Bridge at 134
Miles,
Do.
30,000.00
147
Not
Ch. commenced Goishod.
***
MISCELLANEOUS.
Levelling Strip of land now occupied by
the Railway Sha Tau Kok,
Do.
5,000.00
148
June, 1929 Finished.
1,195.18
Forming and surfacing Street in front of D. D. C. Lot 827 C and D and 828 C......
Do.
2,000,00
149
1929
Magnetic Huts, Au Tau-Fencing,
Do.
1,600.00
150
Un. Buished. June, 1929 Finished.
1,432,88
948,93
PUBLIC HEALTH AND BUILDINGS ORDINANCE.
Compensation and Resumptions,
Do.
5,000.00
151
Annual Vote
2,223.10.
PUBLIC WORKs Hong Kong BuildingS.
New Porch & approach to C. S. O. Buil-
ding,
Do.
1,000.00 ̊C.S.0.298 of '21
1.12.28
Finishod.
998.14
Wireless Broadensting Studio to mest the
cost of Furniture, Piano, Carpet etc...........
Do.
5,000.00 C,S.0,556 of '23
17.4.29
+1
4,948.41
New Building and mast at Cape D'Aguilar
for W/T traffic,
Do.
15,000,00
00.00 c.s.o.
5.0, 894 of *28
24.10.29
Cn. Anished.
1,582.30
Now Latriue in Water Street,
Do.
10,000.00 C.3.0. 3 in 4879/29||| 25.11.29
**
COMMUNICATION.
Forming two Forestry Tracks into Bridle
Parlis,
Do.
25,000.00 C.S.0.596 of '26 April, 1929| Finished.]
24.756.93
Proposed Road connecting Garden Road
and Bowen Road with May Road,...
Do.
57,000.00 C.S.O. 543 of*19] Oct., 1929
Da. Aulabed.
9,006.7%