72
(F 12 )
Return of all Public Works, Civil Roads, Canals, Bridges, Buildings, &c.,--Continued.
Whether Finished
Describe the Work, and where situnted.
Whether Estimated Construct Expenses
ing or under Repairs.
Authority under
Whot
which it is
iti
excruteil.
Dollars.
Com- | meneed.
or Un- finished.
A mount of
Expenditure.
¿
PUBLIC Works ExtraorDINARY— – Contd.
Rouds :-
COMMUNICATIONS,
hilly
(.) Metalling and tar-painting
portion of Lai Chi Kok-Castle Peak and Tuipo Roads,
(6.) Taipo-Market, kerbing and chan-
nelling, &c.,........................
Colonial Estimates 1925.
I
Come struction.
30,000.00
114 (@)
1.2.25
Jo.
5,000,00
114 (4)
15.4,25
Finished.
Lin- finished.
16,876.74
289.63
(e.) Taipo Rond,— Widening and improv- {
ing from 5th milestone to Shatin,...
D. {
| 1,300.00 €,8.0, 3841 of 25
114(e) 10,000,00
16.7.24
Finished.
14,650,80
(d) Widening eleven bridges,
Do.
{
4,500.00 €.8,0. 22 in 63 of '25 20,000.00
6.9.21
1.
31,400.64
111 (d)
(e) Surfacing and strengthening those portions of main road running Through puddy,
Do.
26,000.00
11+ (
Jan., 1925
Cathaling
work.
16,197.15
(7) Extension of Roads in Kowloon
Tong Development Area, ...
I'm-
Do.
45,000.00
H4 (7)
10.6,22
finished.
8,828,81
(4.) Waterloo Road extension (100 feet wide) Section between Kowloon Boundary to foot of bills, S.E, of tummel (estimate for 150 foot width),
I
De. {
4,500.00 €.8.0. 22 in 63 of '25)
5,000 00
114 (9)
}
Do.
Do.
5,647.50
1
(4.) Pauling to Sha-tau-kok Rond,
Do.
{
40,000,00
75,000.00
4.8,0, 3811 of 25
114 (4)
Dee..
Do.
73,879.00
1923
(2) Path from Ta Ku Ling to Lin Ma
Houg for patrol purposes,
Do.
15,000,00
114 (7).
Not commenced,
(ƒ) Road to Shun Wang
Do
10,000,00
TH4 (7)
Do.
(4) Taipo Murket to Kam Shan,
Do.
2,000.00 | 0.8.0, 3841 of 25 5,000,00
||1 (4)
3.9.25
Finished.
4,567.23
(7.) Widening two bridges at Au Tau,
and Kam Tsin.
Do. |40,000.00
7.4.25
Un- finished.
16,430.94
(m.) Macadamizing Tripo Road between
5th and 9th Mile,
· Do.
25,000,00
114 (##)
1.5.25
Finished.
23,387.74
(7.) Macadamizing road from Fauling to
Sheung Shui Train Halt,
Do.
25,000,00
(6.) General Works,
Do. {
48,500.00 30,000,00
114 (7)
€.8,0, 3841 of 25
114 (6)
17.6.26
1.1.2.5
Dr. Continuing
16,857.87
work.
59,679,00
DRAINAGE.
Training Nullahıs :—
(4.) One side wall and invert of nullah on Eastern side of the Kaulungtoug Development Scherne,
tion.
Construc- 26,000.00 | U.S.D. 3841 of '25
20,000.00
115 (u)
10.6.25
L'it- finished.
38,032,03
(4.) Kaulungtong. Development
Area,
com.retion of stream North of this aren 10 main nullala,
Do.
1,000,00 C.8,0, 3841 of '25 45,000.00
115 (6)
}
Do.
Do.
9,948.49
(r.) Shamshmipo, extension of existing Nanchang Street Nullah to Taipo Rowd,
Do.
10,000,00
(d) General Works,
Do.
5,000,00
115 (4)
115 (d)
1922 Finished.]
1.1.25
48,999.22
'Continuing work.
1,664.00