Return of all Public Works, Civil Roads, Canals, Bridges, Buildings, &c.,--Continued.

Whether Finished

Describe the Work, and where situnted.

Whether Estimated Construct Expenses

ing or under Repairs.

Authority under

Whot

which it is

iti

excruteil.

Dollars.

Com- | meneed.

or Un- finished.

A mount of

Expenditure.

¿

PUBLIC Works ExtraorDINARY— – Contd.

Rouds :-

COMMUNICATIONS,

hilly

(.) Metalling and tar-painting

portion of Lai Chi Kok-Castle Peak and Tuipo Roads,

(6.) Taipo-Market, kerbing and chan-

nelling, &c.,........................

Colonial Estimates 1925.

I

Come struction.

30,000.00

114 (@)

1.2.25

Jo.

5,000,00

114 (4)

15.4,25

Finished.

Lin- finished.

16,876.74

289.63

(e.) Taipo Rond,— Widening and improv- {

ing from 5th milestone to Shatin,...

D. {

| 1,300.00 €,8.0, 3841 of 25

114(e) 10,000,00

16.7.24

Finished.

14,650,80

(d) Widening eleven bridges,

Do.

{

4,500.00 €.8,0. 22 in 63 of '25 20,000.00

6.9.21

1.

31,400.64

111 (d)

(e) Surfacing and strengthening those portions of main road running Through puddy,

Do.

26,000.00

11+ (

Jan., 1925

Cathaling

work.

16,197.15

(7) Extension of Roads in Kowloon

Tong Development Area, ...

I'm-

Do.

45,000.00

H4 (7)

10.6,22

finished.

8,828,81

(4.) Waterloo Road extension (100 feet wide) Section between Kowloon Boundary to foot of bills, S.E, of tummel (estimate for 150 foot width),

I

De. {

4,500.00 €.8.0. 22 in 63 of '25)

5,000 00

114 (9)

}

Do.

Do.

5,647.50

1

(4.) Pauling to Sha-tau-kok Rond,

Do.

{

40,000,00

75,000.00

4.8,0, 3811 of 25

114 (4)

Dee..

Do.

73,879.00

1923

(2) Path from Ta Ku Ling to Lin Ma

Houg for patrol purposes,

Do.

15,000,00

114 (7).

Not commenced,

(ƒ) Road to Shun Wang

Do

10,000,00

TH4 (7)

Do.

(4) Taipo Murket to Kam Shan,

Do.

2,000.00 | 0.8.0, 3841 of 25 5,000,00

||1 (4)

3.9.25

Finished.

4,567.23

(7.) Widening two bridges at Au Tau,

and Kam Tsin.

Do. |40,000.00

7.4.25

Un- finished.

16,430.94

(m.) Macadamizing Tripo Road between

5th and 9th Mile,

· Do.

25,000,00

114 (##)

1.5.25

Finished.

23,387.74

(7.) Macadamizing road from Fauling to

Sheung Shui Train Halt,

Do.

25,000,00

(6.) General Works,

Do. {

48,500.00 30,000,00

114 (7)

€.8,0, 3841 of 25

114 (6)

17.6.26

1.1.2.5

Dr. Continuing

16,857.87

work.

59,679,00

DRAINAGE.

Training Nullahıs :—

(4.) One side wall and invert of nullah on Eastern side of the Kaulungtoug Development Scherne,

tion.

Construc- 26,000.00 | U.S.D. 3841 of '25

20,000.00

115 (u)

10.6.25

L'it- finished.

38,032,03

(4.) Kaulungtong. Development

Area,

com.retion of stream North of this aren 10 main nullala,

Do.

1,000,00 C.8,0, 3841 of '25 45,000.00

115 (6)

}

Do.

Do.

9,948.49

(r.) Shamshmipo, extension of existing Nanchang Street Nullah to Taipo Rowd,

Do.

10,000,00

(d) General Works,

Do.

5,000,00

115 (4)

115 (d)

1922 Finished.]

1.1.25

48,999.22

'Continuing work.

1,664.00