[ 66 ]
RETURN of all PUBLIC WORKS, CIVIL ROADS, CANALS, BRIDGES,
+
BUILDINGS, &c., &c., not of a Military Nature, which have been undertaken during the Year.
Whether constructing
Estimated Expense
Authority under which it in executed.
Describe the Work, and where situated.
ar under Repair.
in Pound Sterling.
Rep. and Est. Disp. of appl. sd. No Dils.] N. | ØL.
Fand from
which the Expeass
When
Whether finlabod
is defrayed.
commenced.
or medisinhed
If finished, actună ¡If undwished, Amount
of Exproditure up to Expenditure in Pounds Sterling.
Remarks.
present Date ia Pounds Sterling.
-Buildings-
S Completion of Worth at Hunt. _
$] Gorlat Itali Cittrés Poland..
s New Antial Police Statine..
Thint Buildings (finalistine).
5 More shop for the tmnt.
5 Repairing = Wing Contra Schol.
I
Repons to Buildings..
Huw Deal Office.
$ Cuaid-Renuti, hist
S. Barrantes Officer Dra. Mint. -
$ Malim Haughdä Haven,
Grammont Bungalow Mewolem.
S Refrain to Buildings.
Muut of Houghtong..
Repain to Building
•Laundry Workko,
5 Reclaiming hand at Cavanway Bay..
Jouw Formulent Horus & Impli
li Garden.
Maintenance of Public Garden!
-L. Mantar
Planting Fren
Misallon Watts.
Services
Watu Jug Wala Worst. Extension
to the mint
Clock Power
Aumilive 12 for Government Asman.
Mate: Deepply from Exoticard.
Extension of Reservoir at Bottefolum
Maurentner Dublic Garden. Shulension of Water Works!
- Roads
Repairing Wall of bary Fictoria.
Districts intictoria.
Road and Sheet Coulorgmeis... Soraya tutumien Victoria.
Header Struts in Vidéia víubik..
Reads in Kawłem).
5 Reclaiming & Adobo at Alerelom
Completing Praya at Plaza
S Reclaiming Lt. 19. 20. 2 14 36 at Harlem.
Waling Meads and Street.
Drains
Surface drains.
Culiati in Kowloons.
Alling repairing Grains in Victoria.
Repairs to surfan Drain.
Repairs to train in Victoria.
Bridges..
Refraining Bridges ent of Victoria..
Solado.
Constructing 10078|19|| 1
222760
12.866 109
ď
1866. 1882
•
1.494|11| 14 28
6201 416|13| 4
G
[11.3194
Finished
January 18t Johnagy 1863 Unfinished
March
Arrishud
490
| 14.699|14||
1.922 19
142 13 1.469 18 612 41238 1.4
•
• *
May
Jammary 1865
Jandary 1866
August Hy
1366 Unfinished
Frishud
4.192214
+
416|13|34| 35:628
•
Telemacy Unfiscated
apit septemba
Septento tinished
Joummary WA4F
176 Unfinished
Repair
1.929
14868
+886
-Constructing
4.341 182 6.2231382
28
1864
4.166|13|| 4.
•
Repair
37
Conducting 31.260
·
Repair
1.45-81 6
8
1869
___Repair_
9.893! 10 રા
184
May
1864 Finished
4
/ $866
Jandary 186
9.897
J
416 13
4
4
41591 991
-Constructing --
104 3
4
31510
Calituation. Esituate
23912
1869
April 1865 Unfinished
2.063 6
Repair
thay
Finished
186
2.083 6
118
416134
Unfinished
Construsting.
2.370 • 20.833 2.570
*
.
1868
Refrain
Constricting-
1.041 13
jjj »
4
1869
33
Repair.
41613
"
--Coustundling-
-Constunding-
Repair
12. • #
208 € 41615 3.1298 1.641 13 1.200.
1. Ces
2.063
1.892 19 31210
$ «» Je-* * * * *
1.041|13| 4 1.04113
104 9 625
8-+-- RE38 | cat??
•
·
•
Marmfer
Dicembor.
Fivvalued
January 1866 Finished
1865 Unfinished
Anished Unfinished
414
829 16 4 208 61 413 部
7
380 11 1.3992
1.42 10
2000 19 +4
•
410
394
1.295
·
ነዚ
1766
June March 1866
July
1360
1763- Anarch, 186 Aplintu
•
Farished
3/210
620 12974
145
1966
1818
- Repair.
208 68 13
1866
169.1364
1
1
January 1866 Finished
Ms Unfinished 1866 Kinished
Jainiary
December Heferianed
January 1866 Pinished
Nos. The Services marked & in the Margin are authorized under Supplementary Reperti and Estimatu.
8
*
287 18
2071094
|92500|15| 6 | 35:210|18|3
Cancelled 31. Jummary 1866.
B2
35