146
portions of Sia-waii, but in eonœquine
忄
PUBLIC RECORD OFFICE!
C.O./133
Reference :--
COPYRIGHT PHOTOGRAPH-NOT TO | BE REPRODUCED PHOTOGRAPHIC-
9ALLY WITHOUT PERMISSION OF THE
PUBLIC RECORD OFFICE,
LONDON]
the neighbouring tenants niglicting. to build at the same time, !'have
been obliged to postpone the work
mind close the neemut...
[17
The Jukunpu Eauriway partially repaired, rendering it. avricable for pedestrians, for this Summ
35.19.6.0
The
повер
othin
expenditure for
repairs to a Road during the your was for that intending from
the Albany Gotoww to quarry Bay, a distance of 2%/1⁄2 mites, which included the portions lately finished and only partially consolidated; £51.9-10.-
Bridge and three stme
A new
-10
Grains were made on a portion of the Road to Worth, Print, in lieu of
wooden platform Bridges; there
complited for
the
sim £65.0
tverc
A Stone arch of pienliar construction,
having splayel abutments and
askeur n
the
face, was
built
ML
for
the
1.
f
the Aberdeen Road
£15.16.8-
The whole of the platform
Bridges on the road round the Aland, with the exception of three; riz:- one at Tytam, and one at. Aldrich Bay of Considerable length, and the other a sliding Bridge for
the convenienc
in Aberdeen,
a Bont-builder
fa
were rebuilt in
No comments yet.
Private notes are available after approval.