AnnualReport-1939 — Page 801

Administrative Reports 行政報告書 All AI Reviewed

S 36

PART II.-Statistical Tables.

Table A.-Analysis of operated mileage.

Particulars Main line Second track Sidings loops Total Lines owned :-- Miles Miles Miles Miles Kowloon to Lowu (Gauge 4′8′′) 21.76 2.13 10.96 34.85

Table B.-Permanent Way renewals.

Particulars Previous year Current year 1. Sleepers. Wood (Kempas) 3,289 3,945 pieces Concrete (new) 728 Concrete (2nd hand) 1,380 pieces Total 5,325 pieces Percentage renewal 7.92% 4,017 5.97% 2. Ballast. 24′′ Granite 2,041 3. Rails. 85 lb. B.S.S. 36 ft. (new) 4 24 85 lb. B.S.S. 36 ft. (2nd hand) 4. Points and Crossings. Crossings LO 5 Switches 4 1,488 cubic yards 71 lengths 35 5 sets 7 pairs

Edit History

2026-05-10 15:02:14 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
S 36 PART II.-Statistical Tables. Table A.-Analysis of operated mileage. Particulars Main line Second track Sidings loops Total Lines owned :-- Miles Miles Miles Miles Kowloon to Lowu (Gauge 4′8′′) 21.76 2.13 10.96 34.85 Table B.-Permanent Way renewals. Particulars Previous year Current year 1. Sleepers. Wood (Kempas) 3,289 3,945 pieces Concrete (new) 728 Concrete (2nd hand) 1,380 pieces Total 5,325 pieces Percentage renewal 7.92% 4,017 5.97% 2. Ballast. 24′′ Granite 2,041 3. Rails. 85 lb. B.S.S. 36 ft. (new) 4 24 85 lb. B.S.S. 36 ft. (2nd hand) 4. Points and Crossings. Crossings LO 5 Switches 4 1,488 cubic yards 71 lengths 35 5 sets 7 pairs
Baseline (Original)
S 36 PART II.-Statistical Tables. Table A.-Analysis of operated mileage. Second Main Particulars line track Sidings loops Total Lines owned :-- Miles Miles Miles Miles Kowloon to Lowu (Gauge 4′8′′) 21.76 2.13 10.96 34.85 Table B.-Permanent Way renewals. Previous year Particulars Current year 1. Sleepers. 3,289 Wood (Kempas) 3,945 pieces Concrete (new) 728 Concrete (2nd hand) 1,380 pieces Total 5,325 pieces 7.92% 4,017 5.97% Percentage renewal 2. Ballast. 2,041 24′′ Granite 3. Rails. 4 24 85 lb. B.S.S. 36 ft. (new) 85 lb. B.S.S. 36 ft. (2nd hand) 4. Points and Crossings. LO 5 Crossings 4 Switches 1,488 cubic yards 71 lengths 35 5 sets 7 pairs
2026-05-10 15:02:14 · Baseline
View content

S 36

PART II.-Statistical Tables.

Table A.-Analysis of operated mileage.

Second

Main

Particulars

line

track Sidings loops

Total

Lines owned :--

Miles

Miles Miles Miles

Kowloon to Lowu (Gauge 4′8′′)

21.76

2.13

10.96 34.85

Table B.-Permanent Way renewals.

Previous year

Particulars

Current year

1. Sleepers.

3,289

Wood (Kempas)

3,945 pieces

Concrete (new)

728

Concrete (2nd hand)

1,380 pieces

Total

5,325 pieces

7.92%

4,017

5.97%

Percentage renewal

2. Ballast.

2,041

24′′ Granite

3.

Rails.

4

24

85 lb. B.S.S. 36 ft. (new)

85 lb. B.S.S. 36 ft. (2nd hand)

4. Points and Crossings.

LO

5

Crossings

4

Switches

1,488 cubic yards

71 lengths

35

5 sets

7 pairs

Comments