V. WORKS NOT APPEARING IN ESTIMATES.

120. The costs of the works carried out under this head were charged against the respective Financial Messages and Funds.

121.

122.

ISLAND.

Infectious Diseases Hospital-A water supply was laid on to the disinfector.

Conversion of Sisters' Quarters, Old Government Hospital-The existing inside service piping was altered and separate meters fixed to each flat.

123. Conversion of P.W.D. Garages into Office-The inside service piping was laid and connected to the mains.

124. Temporary Teachers' Training Centre--The necessary alterations to the existing inside service were carried out.

125. Green Island Gunpowder Depot-42 feet of 4″ suction piping to the fire service pump were renewed.

126. New Medical Hut at Refugee Camp, North Point-The inside service piping was laid and connected to the mains.

MAINLAND.

127. Refugee Camp-Storage tanks at the King's Park and Ma Tau Chung Refugee Camps were connected up to the water main and involved the laying of 180 feet and 300 feet respectively of 1" wrought iron piping.

128. Interned Soldiers Camp, Argyle Street-A water supply was given to the camp for interned soldiers, Argyle Street. This involved the laying of 923 feet of 4″ wrought iron piping into the camp from opposite Kowloon Hospital Mortuary, Argyle Street. Two fire hydrants were installed.

D.N.A. ACCOUNT, STANLEY WATER SUPPLY.

129. An unclimbable galvanised iron wire mesh fence was erected round the Stanley Mound service reservoir and a new brick building was erected at the filtration house to provide more space for the storage of materials.

D.N.A. MILITARY CANTONMENT, KOWLOON CHAI.

130. 1,536 feet of 4″ wrought iron piping were laid Northwards from the end of Grampian Road for the Military Authorities.

WORK CARRIED OUT IN CONNECTION WITH MILITARY WORKS.

131. The 7" cast iron draw off main from Wong Nei Chong reservoir was extended for a distance of 128 feet in connection with the widening of the Tytam to Wong Nei Chong Gap Road and 350 feet of the 2" wrought iron pipe line serving Deep Water Bay were realigned clear of Military works above "Overbays", the costs being charged to the Military Authorities.

VI. LOAN WORKS.

HEAD (A) NEW MARKETS-CENTRAL MARKET,

132. The laying of the inside service was completed in April. The cost of this work was included in that of the building.

Edit History

2026-05-10 14:33:03 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 77 V. WORKS NOT APPEARING IN ESTIMATES. 120. The costs of the works carried out under this head were charged against the respective Financial Messages and Funds. 121. 122. ISLAND. Infectious Diseases Hospital-A water supply was laid on to the disinfector. Conversion of Sisters' Quarters, Old Government Hospital-The existing inside service piping was altered and separate meters fixed to each flat. 123. Conversion of P.W.D. Garages into Office-The inside service piping was laid and connected to the mains. 124. Temporary Teachers' Training Centre--The necessary alterations to the existing inside service were carried out. 125. Green Island Gunpowder Depot-42 feet of 4″ suction piping to the fire service pump were renewed. 126. New Medical Hut at Refugee Camp, North Point-The inside service piping was laid and connected to the mains. MAINLAND. 127. Refugee Camp-Storage tanks at the King's Park and Ma Tau Chung Refugee Camps were connected up to the water main and involved the laying of 180 feet and 300 feet respectively of 1" wrought iron piping. 128. Interned Soldiers Camp, Argyle Street-A water supply was given to the camp for interned soldiers, Argyle Street. This involved the laying of 923 feet of 4″ wrought iron piping into the camp from opposite Kowloon Hospital Mortuary, Argyle Street. Two fire hydrants were installed. D.N.A. ACCOUNT, STANLEY WATER SUPPLY. 129. An unclimbable galvanised iron wire mesh fence was erected round the Stanley Mound service reservoir and a new brick building was erected at the filtration house to provide more space for the storage of materials. D.N.A. MILITARY CANTONMENT, KOWLOON CHAI. 130. 1,536 feet of 4″ wrought iron piping were laid Northwards from the end of Grampian Road for the Military Authorities. WORK CARRIED OUT IN CONNECTION WITH MILITARY WORKS. 131. The 7" cast iron draw off main from Wong Nei Chong reservoir was extended for a distance of 128 feet in connection with the widening of the Tytam to Wong Nei Chong Gap Road and 350 feet of the 2" wrought iron pipe line serving Deep Water Bay were realigned clear of Military works above "Overbays", the costs being charged to the Military Authorities. VI. LOAN WORKS. HEAD (A) NEW MARKETS-CENTRAL MARKET, 132. The laying of the inside service was completed in April. The cost of this work was included in that of the building.
Baseline (Original)
Q 77 V. WORKS NOT APPEARING IN ESTIMATES. 120. The costs of the works carried out under this head were charged against the respective Financial Messages and Funds. 121. 122. ISLAND. Infectious Diseases Hospital-A water supply was laid on to the disinfector. Conversion of Sisters' Quarters, Old Government Hospital-The existing inside service piping was altered and separate meters fixed to each flat. 123. Conversion of P.W.D. Garages into Office-The inside service piping was laid and connected to the mains. 124. Temporary Teachers' Training Centre--The necessary alterations to the existing inside service were carried out. 125. Green Island Gunpowder Depot-42 feet of 4′′ suction piping to the fire. service pump were renewed. 126. New Medical Hut at Refugee Camp, North Point-The inside service piping was laid and connected to the mains. MAINLAND. 127. Refugee Camp-Storage tanks at the King's Park and Ma Tau Chung Refugee Camps were connected up to the water main and involved the laying of 180 feet and 300 feet respectively of 1" wrought iron piping. 128. Interned Soldiers Camp, Argyle Street-A water supply was given to the camp for interned soldiers, Argyle Street. This involved the laying of 923 feet of 4′′ wrought iron_piping into the camp from opposite Kowloon Hospital Mortuary, Argyle Street. Two fire hydrants were installed. D.N.A. ACCOUNT, STANLEY WATER SUPPLY. 129. An unclimbable galvanised iron wire mesh fence was erected round the Stanley Mound service reservoir and a new brick building was erected at the filtration house to provide more space for the storage of materials. D.N.A. MILITARY CANTONMENT, KOWLOON CHAI. 130. 1,536 feet of 4′′ wrought iron piping were laid Northwards from the end of Grampian Road for the Military Authorities. WORK CARRIED OUT IN CONNECTION WITH MILITARY WORKS. 131. The 7" cast iron draw off main from Wong Nei Chong reservoir was extended for a distance of 128 feet in connection with the widening of the Tytam to Wong Nei Chong Gap Road and 350 feet of the 2" wrought iron pipe line serving Deep Water Bay were realigned clear of Military works above "Overbays", the costs being charged to the Military Authorities. VI. LOAN WORKS. HEAD (A) NEW MARKETS-CENTRAL MARKET, 132. The laying of the inside service was completed in April. The cost of this work was included in that of the building.
2026-05-10 14:33:03 · Baseline
View content

Q 77

V. WORKS NOT APPEARING IN ESTIMATES.

120. The costs of the works carried out under this head were charged against the respective Financial Messages and Funds.

121.

122.

ISLAND.

Infectious Diseases Hospital-A water supply was laid on to the disinfector.

Conversion of Sisters' Quarters, Old Government Hospital-The existing inside service piping was altered and separate meters fixed to each flat.

123. Conversion of P.W.D. Garages into Office-The inside service piping was laid and connected to the mains.

124. Temporary Teachers' Training Centre--The necessary alterations to the existing inside service were carried out.

125. Green Island Gunpowder Depot-42 feet of 4′′ suction piping to the fire. service pump were renewed.

126. New Medical Hut at Refugee Camp, North Point-The inside service piping was laid and connected to the mains.

MAINLAND.

127. Refugee Camp-Storage tanks at the King's Park and Ma Tau Chung Refugee Camps were connected up to the water main and involved the laying of 180 feet and 300 feet respectively of 1" wrought iron piping.

128. Interned Soldiers Camp, Argyle Street-A water supply was given to the camp for interned soldiers, Argyle Street. This involved the laying of 923 feet of 4′′ wrought iron_piping into the camp from opposite Kowloon Hospital Mortuary, Argyle Street. Two fire hydrants were installed.

D.N.A. ACCOUNT, STANLEY WATER SUPPLY.

129. An unclimbable galvanised iron wire mesh fence was erected round the Stanley Mound service reservoir and a new brick building was erected at the filtration house to provide more space for the storage of materials.

D.N.A. MILITARY CANTONMENT, KOWLOON CHAI.

130. 1,536 feet of 4′′ wrought iron piping were laid Northwards from the end of Grampian Road for the Military Authorities.

WORK CARRIED OUT IN CONNECTION WITH MILITARY WORKS.

131. The 7" cast iron draw off main from Wong Nei Chong reservoir was extended for a distance of 128 feet in connection with the widening of the Tytam to Wong Nei Chong Gap Road and 350 feet of the 2" wrought iron pipe line serving Deep Water Bay were realigned clear of Military works above "Overbays", the costs being charged to the Military Authorities.

VI. LOAN WORKS.

HEAD (A) NEW MARKETS-CENTRAL MARKET,

132. The laying of the inside service was completed in April. The cost of this work was included in that of the building.