(f) The plotting of the catchwater, adjoining stream courses and footpaths from Kowloon main reservoir to the North of Statue Rock was completed; length plotted 9,900 feet.
(g) Surveys were carried out for the preparation of transfer plans in connection with the following War Department areas :-
War Department Lot No. 44 2.22 acres. 45 3.58 acres. 25 Reserve adjoining W.D.L. No. 45 7.50 acres. War Department Lot No. 48 1.76 acres. Reserve adjoining W.D.L. No. 48 9.36 acres.18. Portions of the following roads were surveyed and plotted to a scale of 1/600.
Castle Peak Road Length Surveyed. 11,300 Length Plotted. 6,500 Anderson Road 4,700 4,700 Pineapple Pass Road 2,100 2,100 New road leading to Sun Wan 1,500 1,500 Permanent Cemetery, Tsun Wan19. Surveys were made in detail for plans to be attached to Crown Leases of 564 lots. These surveys entailed very accurate measurements of all boundaries, dimensions in every case being given to the nearest inch. Co-ordinate values of each angle of a lot were obtained and areas computed by double departures. Particulars of tenure etc. were prepared in each case and forwarded to the Land Officer.
20. Surveys were made of twelve lots for plans to be attached to deeds of surrender.
21. The boundaries of 414 areas (building lots, permit area, quarries etc.) were set out and the frontage lines to streets of 231 lots were checked.
22. 2,323 stones were fixed to define the boundaries of 580 lots and forty-nine concrete boundary posts to define cemeteries and quarries.
23. Seventy-five picket boxes were fixed during the year.
24. Boundaries of numerous lots and street alignments were set out for the Roads and Drainage sub-departments.
25. Nineteen surveys were made and plans prepared for the Police Department in connection with criminal cases.
26. The annual perambulation of the Anglo-Chinese boundary and inspection of boundary marks was carried out.
Page 690
Page 691
Q 55
(f) The plotting of the catchwater, adjoining stream courses and footpaths from Kowloon main reservoir to the North of Statue Rock was completed; length plotted 9,900 feet.
(9) Surveys were carried out for the preparation of transfer plans in connection
with the following War Department areas :-
War Department Lot No. 44
2.22 acres.
45
3.58 acres.
25
>>
J
Reserve adjoining W.D.L. No. 45
7.50 acres.
War Department Lot No. 48
1.76 acres.
Reserve adjoining W.D.L. No. 48
9.36 acres.
18. Portions of the following roads were surveyed and plotted to a scale of
1/600.
Castle Peak Road
Anderson Road
Pineapple Pass Road
New road leading to Sun Wan
Length
Length
Surveyed.
Plotted.
11,300
6,500
4,700
4,700
2,100
2,100
1,500
1,500
Permanent Cemetery, Tsun Wanj
19. Surveys were made in detail for plans to be attached to Crown Leases of 564 lots. These surveys entailed very accurate measurements of all boundaries, dimensions in every case being given to the nearest inch. Co-ordinate values of each angle of a lot were obtained and areas computed by double departures. Particulars of tenure etc. were prepared in each case and forwarded to the Land Officer.
20. Surveys were made of twelve lots for plans to be attached to deeds of surrender.
21. The boundaries of 414 areas (building lots, permit area, quarries etc.) were set out and the frontage lines to streets of 231 lots were checked.
22. 2,323 stones were fixed to define the boundaries of 580 lots and forty-nine concrete boundary posts to define cemeteries and quarries.
23. Seventy-five picket boxes were fixed during the year.
24. Boundaries of numerous lots and street alignments were set out for the Roads and Drainage sub-departments.
25. Nineteen surveys were made and plans prepared for the Police Department in connection with criminal cases.
26. The annual perambulation of the Anglo-Chinese boundary and inspection of boundary marks was carried out.