7. Works completed were:- Cutting and filling of the section of road adjoining Inland Lots Nos. 3685 & 3686, Blue Pool Road; widening of that portion of Garden Road between the Lower Peak Tram Station and the Helena May Institute; raising the first section of Electric Road to new Town Planning levels; Magazine Gap Road was widened and a Car Park constructed at the junction of this road with Bowen Road; surfacing of Sai Kung Road from Sam Tack Road to Field Cottage site; improvements to Sha Tin Pass Road; road to Smuggler's Pass and road from Au Tau to Shek Kong.

8. Works under construction were: widening and surfacing of Customs Pass Road; surfacing of Sai Kung Road from Field Cottage site to Customs Pass Road; strengthening of bridges at Tsun Wan, Tsing Lung Tau, Tai Lam Chung (small bridge); rebuilding of a large bridge at Tai Lam Chung, surfacing of road to Smuggler's Pass and approach road to Tsun Wan Cemetery.

DRAINAGE.

9. In Hong Kong, new main sewers and storm water drains to a length of 5,361 feet and new open channels of varying sections to a length of 717 feet were laid. In addition, 188 feet of existing nullah was decked over and 142 feet of main storm water drain previously inverted was completed. In Kowloon, New Kowloon and New Territories, new main sewers and storm water drains to a length of 6,414 feet, and new open channels of varying sections to a length of 528 feet were laid. Nullah walling was constructed to proper height and parapet walling built for a length of 500 feet.

10. Anti-Malarial work was continued in Hong Kong by the letting of two new contracts, one for an area between the two reservoirs at Aberdeen, the other in the vicinity of Pokfulam between the Queen Mary Hospital and Sandy Bay. Although these contracts were not let until late in the year good progress was made on preliminary work and excavation, and at Aberdeen area 300 feet of main channel was constructed. A 3,000 gallon reservoir with a "De Villiers" automatic syphon sluice was erected near Mount Cameron Road, and minor channelling was laid near Inland Lot No. 2441, Victoria Road. In Kowloon, several short lengths of channelling were laid as requested by the Government Malariologist. In New Kowloon, working on training the stream-course west of New Kowloon Inland Lot No. 1969 at Ngau Shi Wan was commenced in November. A length of 150 feet of 36" diameter channel was completed. Filling to the amount of 1,200 cubic yards was also completed and an area of 300 square yards was turfed.

Edit History

2026-05-10 07:06:31 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
COMMUNICATIONS. 7. Works completed were:- Cutting and filling of the section of road adjoining Inland Lots Nos. 3685 & 3686, Blue Pool Road; widening of that portion of Garden Road between the Lower Peak Tram Station and the Helena May Institute; raising the first section of Electric Road to new Town Planning levels; Magazine Gap Road was widened and a Car Park constructed at the junction of this road with Bowen Road; surfacing of Sai Kung Road from Sam Tack Road to Field Cottage site; improvements to Sha Tin Pass Road; road to Smuggler's Pass and road from Au Tau to Shek Kong. 8. Works under construction were: widening and surfacing of Customs Pass Road; surfacing of Sai Kung Road from Field Cottage site to Customs Pass Road; strengthening of bridges at Tsun Wan, Tsing Lung Tau, Tai Lam Chung (small bridge); rebuilding of a large bridge at Tai Lam Chung, surfacing of road to Smuggler's Pass and approach road to Tsun Wan Cemetery. DRAINAGE. 9. In Hong Kong, new main sewers and storm water drains to a length of 5,361 feet and new open channels of varying sections to a length of 717 feet were laid. In addition, 188 feet of existing nullah was decked over and 142 feet of main storm water drain previously inverted was completed. In Kowloon, New Kowloon and New Territories, new main sewers and storm water drains to a length of 6,414 feet, and new open channels of varying sections to a length of 528 feet were laid. Nullah walling was constructed to proper height and parapet walling built for a length of 500 feet. 10. Anti-Malarial work was continued in Hong Kong by the letting of two new contracts, one for an area between the two reservoirs at Aberdeen, the other in the vicinity of Pokfulam between the Queen Mary Hospital and Sandy Bay. Although these contracts were not let until late in the year good progress was made on preliminary work and excavation, and at Aberdeen area 300 feet of main channel was constructed. A 3,000 gallon reservoir with a "De Villiers" automatic syphon sluice was erected near Mount Cameron Road, and minor channelling was laid near Inland Lot No. 2441, Victoria Road. In Kowloon, several short lengths of channelling were laid as requested by the Government Malariologist. In New Kowloon, working on training the stream-course west of New Kowloon Inland Lot No. 1969 at Ngau Shi Wan was commenced in November. A length of 150 feet of 36" diameter channel was completed. Filling to the amount of 1,200 cubic yards was also completed and an area of 300 square yards was turfed.
Baseline (Original)
- Q 2 COMMUNICATIONS. 7. Works completed were:-Cutting and filling of the section. of road adjoining Inland Lots Nos. 3685 & 3686, Blue Pool Road; widening of that portion of Garden Road between the Lower Peak Tram Station and the Helena May Institute; raising the first section of Electric Road to new Town Planning levels; Magazine Gap Road was widened and a Car Park constructed at the junction of this road with Bowen Road; surfacing of Sai Kung Road from Sam Tack Road to Field Cottage site; improvements to Sha Tin Pass Road; road to Sinuggler's Pass and road from Au Tau to Shek Kong. 8. Works under construction were:widening and surfacing of Customs Pass Road; surfacing of Sai Kung Road from Field Cottage site to Customs Pass Road; strengthening of bridges at Tsun Wan, Tsing Lung Tau, Tai Lam Chung (small bridge); rebuilding of a large bridge at Tai Lam Chung, surfacing of road to Smuggler's Pass and approach road to Tsun Wan Cemetery. DRAINAGE. 9. In Hong Kong, new main sewers and storm water druins to a length of 5,361 feet and new open channels of varying sections to a length of 717 feet were laid. In addition, 188 feet of existing nullah was decked over and 142 feet of main storm water drain previously inverted was completed. In Kowloon, New Kowloon and New Territories, new main sewers and storm water drains to a length of 6,414 feet, and new open channels of varying sections to a length of 528 feet were laid. Nullah walling was constructed to proper height and parapet walling built for a length of 500 feet. 10. Anti-Malarial work was continued in Hong Kong by the letting of two new contracts, one for an area between the two reservoirs at Aberdeen, the other in the vicinity of Pokfulam between the Queen Mary Hospital and Sandy Bay. Although these contracts were not let until late in the year good progress was made on preliminary work and excavation, and at Aberdeen area 300 feet of main channel was constructed. A 3,000 gallon reservoir with a "De Villiers" automatic syphon sluice was erected near Mount Cameron Road, and minor channelling was laid near Inland Lot No. 2441, Victoria Road. In Kowloon. several short lengths of channelling were laid as requested by the Government Malariologist. In New Kowloon, working on training the stream-course west of New Kowloon Inland Lot No. 1969 ui Ngau Shi Wan was commenced in November. A length of 150 feet of 36" diameter channel was completed. Filling to the amount of 1,200 cubic yards was also completed and an area of 300 super yards was turfed.
2026-05-10 07:06:31 · Baseline
View content

- Q 2

COMMUNICATIONS.

7. Works completed were:-Cutting and filling of the section. of road adjoining Inland Lots Nos. 3685 & 3686, Blue Pool Road; widening of that portion of Garden Road between the Lower Peak Tram Station and the Helena May Institute; raising the first section of Electric Road to new Town Planning levels; Magazine Gap Road was widened and a Car Park constructed at the junction of this road with Bowen Road; surfacing of Sai Kung Road from Sam Tack Road to Field Cottage site; improvements to Sha Tin Pass Road; road to Sinuggler's Pass and road from Au Tau to Shek Kong.

8. Works under construction were:widening and surfacing of Customs Pass Road; surfacing of Sai Kung Road from Field Cottage site to Customs Pass Road; strengthening of bridges at Tsun Wan, Tsing Lung Tau, Tai Lam Chung (small bridge); rebuilding of a large bridge at Tai Lam Chung, surfacing of road to Smuggler's Pass and approach road to Tsun Wan Cemetery.

DRAINAGE.

9. In Hong Kong, new main sewers and storm water druins to a length of 5,361 feet and new open channels of varying sections to a length of 717 feet were laid. In addition, 188 feet of existing nullah was decked over and 142 feet of main storm water drain previously inverted was completed. In Kowloon, New Kowloon and New Territories, new main sewers and storm water drains to a length of 6,414 feet, and new open channels of varying sections to a length of 528 feet were laid. Nullah walling was constructed to proper height and parapet walling built for a length of 500 feet.

10. Anti-Malarial work was continued in Hong Kong by the letting of two new contracts, one for an area between the two reservoirs at Aberdeen, the other in the vicinity of Pokfulam between the Queen Mary Hospital and Sandy Bay. Although these contracts were not let until late in the year good progress was made on preliminary work and excavation, and at Aberdeen area 300 feet of main channel was constructed. A 3,000 gallon reservoir with a "De Villiers" automatic syphon sluice was erected near Mount Cameron Road, and minor channelling was laid near Inland Lot No. 2441, Victoria Road. In Kowloon. several short lengths of channelling were laid as requested by the Government Malariologist. In New Kowloon, working on training the stream-course west of New Kowloon Inland Lot No. 1969 ui Ngau Shi Wan was commenced in November. A length of 150 feet of 36" diameter channel was completed. Filling to the amount of 1,200 cubic yards was also completed and an area of 300 super yards was turfed.