# PART II.—STATISTICAL TABLES.
## Table A.-Analysis of Operated Mileage.
Particulars Main Line Second Track Sidings Loops Total Lines owned: - Miles Miles Miles Miles Miles Kowloon to Lowü (Gauge 4'8½″). 21.76 2.15 9.83 33.74 Lines operated: - Lowu to Shum Chun Previous Year 0.30 0.08 0.38 Total 22.06 2.23 9.83 34.12## Table B.-Sleeper Renewals.
Type Wood 3,009 1,309 Concrete (new). 334 Concrete (2nd hand). ....... Total 4,652 Current Year 4,114 Total 4,114 Percentage renewal 7.12 6.29S 57
-
S 57
PART II.—STATISTICAL TABLES.
Table A.-Analysis of Operated Mileage.
Particulars
Second
Main
Track
Line
Sidings
Total
Loops
Lines owned: -
Miles
Miles
Miles
Miles
Kowloon to Lowü (Gauge 4'81′′).
21.76
2.15
9.83
33.74
Lines operated:
-
Lowu to Shum Chun
Previous Year
.30
.08
.38
Total
22.06
2.23
9.83
34.12
Table B.-Sleeper Renewals.
Type
3.009
Wood
⚫1,309
Concrete (new).
334
Concrete (2nd hand).
.......
4,652
Total
Current Year
4,114
4,114
7.12
Percentage renewal
6.29
No comments yet.
Private notes are available after approval.