GENERAL WORKS.

154. Roads:-Work completed under this head included the surfacing, kerbing and channelling of new roads, and where required to existing roads. Foot paths were paved with granolithic paving or slabs and the necessary improve- ments made in front of new buildings erected during the year.

Expenditure

$32,429.29

155. Drainage:-(a) Training Nullahs :-A concrete foundation for invert was laid in Argyle Street nullah to the west of Tung Choi Street, Mongkok (portion only).

Expenditure

$999.44

(b) Miscellaneous Drainage Works-New sewers and storm water drains were constructed to a length of 6,738 feet, varying in diameter from 30" to 6". The number of drain connections made was eighty-seven. Many new gullies with flat gully gratings were constructed and connected to the storm water drainage system.

156.

Expenditure

$31,136.88

Miscellaneous-The following works were carried out:-Kowloon Hospital-filling of channels and fencing to tennis courts, Kowloon Magistracy-sound proofing and padding to cells, Green Island Depot-forming new path and construction of inspection boxes, Central British School- fitting of flagmast. Improvements and additions to the electrical installations were carried out in seven buildings.

Expenditure

$3,331.83

157. Water Works:-(a) Miscellaneous:---Works carried out under this head were:-380 feet of 6" cast iron main were laid in Bute Street between Tung Choi Street and Nathan Road, 164 feet of 6" cast iron main were laid in Maple Street south westwards from Lai Chi Kok Road, 80 feet of 2" wrought iron piping were laid in Woosung

Edit History

2026-05-10 03:44:01 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 45 to incorporate these buildings in a scheme for Central Govern- ment Stores either at Arsenal Street or on the Yacht Club Reclamation at North Point. Expenditure $ Nil Expenditure to 31st Dec., 1936 $ Nil GENERAL WORKS. 154. Roads:-Work completed under this head included the surfacing, kerbing and channelling of new roads, and where required to existing roads. Foot paths were paved with granolithic paving or slabs and the necessary improve- ments made in front of new buildings erected during the year. Expenditure $32,429.29 155. Drainage:-(a) Training Nullahs :-A concrete foundation for invert was laid in Argyle Street nullah to the west of Tung Choi Street, Mongkok (portion only). Expenditure $999.44 (b) Miscellaneous Drainage Works-New sewers and storm water drains were constructed to a length of 6,738 feet, varying in diameter from 30" to 6". The number of drain connections made was eighty-seven. Many new gullies with flat gully gratings were constructed and connected to the storm water drainage system. 156. Expenditure $31,136.88 Miscellaneous-The following works were carried out:-Kowloon Hospital-filling of channels and fencing to tennis courts, Kowloon Magistracy-sound proofing and padding to cells, Green Island Depot-forming new path and construction of inspection boxes, Central British School- fitting of flagmast. Improvements and additions to the electrical installations were carried out in seven buildings. Expenditure $3,331.83 157. Water Works:-(a) Miscellaneous:---Works carried out under this head were:-380 feet of 6" cast iron main were laid in Bute Street between Tung Choi Street and Nathan Road, 164 feet of 6" cast iron main were laid in Maple Street south westwards from Lai Chi Kok Road, 80 feet of 2" wrought iron piping were laid in Woosung
Baseline (Original)
Q 45 to incorporate these buildings in a scheme for Central Govern- ment Stores either at Arsenal Street or on the Yacht Club Reclamation at North Point. Expenditure $ Nil Expenditure to 31st Dec., 1936 $ Nil GENERAL WORKS. 154. Roads:-Work completed under this head included the surfacing, kerbing and channelling of new roads, and where required to existing roads. Foot paths were paved with granolithic paving or slabs and the necessary improve- ments made in front of new buildings erected during the year. Expenditure $32,429.29 cement 155. Drainage:-(a) Training Nullahs :-A concrete foundation for invert was laid in Argyle Street nullah to the west of Tung Choi Street, Mongkok (portion only). Expenditure $ 999.44 (b) Miscellaneous Drainage Works-New sewers and storm water drains were constructed to a length of 6,738 feet, varying in diameter from 30" to 6". The number of drain connections made was eighty-seven. Many new gullies with flat gully gratings were constructed and connected to the storm water drainage system. 156. Expenditure $31,136.88 Miscellaneous-The following works were carried out:-Kowloon Hospital-filling of channels and fencing to tennis courts, Kowloon Magistracy-sound proofing and padding to cells, Green Island Depot-forming new path and construction of inspection boxes, Central British School- fitting of flagmast. Improvements and additions to the electrical installations were carried out in seven buildings. Expenditure ,,་ $3,331.83 157. Water Works:-(a) Miscellaneous:---Works carried out under this head were:-380 feet of 6" cast iron main were laid in Bute Street between Tung Choi Street and Nathan Road, 164 feet of 6" cast iron main were laid in Maple Street south westwards from Lai Chi Kok Road, 80 feet of 2" wrought iron piping were laid in Woosung
2026-05-10 03:44:01 · Baseline
View content

Q 45

to incorporate these buildings in a scheme for Central Govern- ment Stores either at Arsenal Street or on the Yacht Club Reclamation at North Point.

Expenditure

$ Nil

Expenditure to 31st Dec., 1936

$ Nil

GENERAL WORKS.

154. Roads:-Work completed under this head included the surfacing, kerbing and channelling of new roads, and where required to existing roads. Foot paths were paved with granolithic paving or slabs and the necessary improve- ments made in front of new buildings erected during the

year.

Expenditure

$32,429.29

cement

155. Drainage:-(a) Training Nullahs :-A concrete foundation for invert was laid in Argyle Street nullah to the west of Tung Choi Street, Mongkok (portion only).

Expenditure

$ 999.44

(b) Miscellaneous Drainage Works-New sewers and storm water drains were constructed to a length of 6,738 feet, varying in diameter from 30" to 6". The number of drain connections made was eighty-seven. Many new gullies with flat gully gratings were constructed and connected to the storm water drainage system.

156.

Expenditure

$31,136.88

Miscellaneous-The following works were carried out:-Kowloon Hospital-filling of channels and fencing to tennis courts, Kowloon Magistracy-sound proofing and padding to cells, Green Island Depot-forming new path and construction of inspection boxes, Central British School- fitting of flagmast. Improvements and additions to the electrical installations were carried out in seven buildings.

Expenditure

,,་

$3,331.83

157. Water Works:-(a) Miscellaneous:---Works carried out under this head were:-380 feet of 6" cast iron main were laid in Bute Street between Tung Choi Street and Nathan Road, 164 feet of 6" cast iron main were laid in Maple Street south westwards from Lai Chi Kok Road, 80 feet of 2" wrought iron piping were laid in Woosung