Q 41
GENERAL WORKS.
159. Roads.-The undermentioned roads were kerbed and channelled, the footpaths being paved with granolithic paving or slabs, and the necessary improvements made in front of new buildings erected during the year:-Argyle Street, Arran Street, Ashley Road, Austin Road, Baker Street, Battery Street, Boundary Street, Bute Street, Canton Road, Chatham Road, Ching Lung Street, Cooke Street, Dock Street, Duke Street, Ema Avenue, Fa Yuen Street, Fife Street, Ha Heung Road, Hack Po Street, Hong Lok Street, Jordan Road, Julia Avenue, Kansu Street, Kau Pui Shek Road, Ki Lung Street, Kimberley Road, Knight Street, Lai Chi Kok Road, Lok Shan Road, Ma Tau Chung Road, Ma Tau Wai, Middle Road, Mong Kok Road, Nathan Road, Nelson Street, New Street, Observatory Road, Pak Tai Street, Parkes Street, Peking Road, Ping Street, Pitt Street, Playing Field Road, Portland Street, Prince Edward Road, Sai Yee Street, Sai Yeung Choi Street, Shanghai Street, Shantung Street, Soy Street, Sung Street, Sung Wong Toi Road, Tai Street, Tack Hing Street, Tam Kung Road, To Kwa Wan Road, Tong Mi Road, Tung Choi Street, Waterloo Road, Wu-hu Street, Yim Po Fong Street, Yu Chau Street.
Expenditure
$100,038.18
160. Drainage:—(a) Training Nullahs.-Small improvements with extensions were effected to existing nullahs.
Expenditure
$219.99
(b) Miscellaneous Drainage Works. New sewers and storm water drains varying in diameter from 84” to 6″ were constructed to a length of 13,081 feet, principally at To Kwa Wan, Ma Tau Wai, Kau Pui Shek, Sung Wong Toi, Ho Mun Tin and Kowloon Point. The existing large outfall sewers were extended at Kowloon City. A nullah at Sung Wong Toi was extended seawards. Numerous additions and extensions to the existing storm water drainage in the several districts were completed. The number of drain connections made was 191. Many new gullies with flat gully gratings were constructed and connected to the storm water drainage system.
Expenditure
$98,209.06
161. Miscellaneous.-The following works were carried out under this head:-The Building of a rubble wall to N.W. of the Tsim Tsa Tsui Police Station and turfing of the slope, the provision of gymnastic apparatus at the Police Training School, and a few other minor works.
Expenditure
$4,117.56
- Q 41
GENERAL WORKS.
159. Roads.-The undermentioned roads were kerbed and channelled, the footpaths being paved with granolithic paving or slabs, and the necessary improvements made in front of new buildings erected during the year:-Argyle Street, Arran Street, Ashley Road, Austin Road, Baker Street, Battery Street, Bound- ary Street, Bute Street, Canton Road, Chatham Road, Ching Lung Street, Cooke Street, Dock Street, Duke Street, Ema Avenue, Fa Yuen Street, Fife Street, Ha Heung Road, Hack Po Street, Hong Lok Street, Jordan Road, Julia Avenue, Kansu Street, Kau Pui Shek Road, Ki Lung Street, Kimberley Road, Knight Street, Lai Chi Kok Road, Lok Shan Road, Ma Tau Chung Road, Ma Tau Wai, Middle Road, Mong Kok Road, Nathan Road, Nelson Street, New Street, Observatory Road, Pak Tai Street, Parkes Street, Peking Road, Ping Street, Pitt Street, Playing Field Road, Portland Street, Prince Edward Road, Sai Yee Street, Sai Yeung Choi Street, Shanghai Street, Shan-tung Street, Soy Street, Sung Street, Sung Wong Toi Road, Tai Street, Tack Hing Street, Tam Kung Road, To Kwa Wan Road, Tong Mi Road, Tung Choi Street, Waterloo Road, Wu-hu Street, Yim Po Fong Street, Yu Chau Street.
Expenditure
$100,038.18
160. Drainage:—(a) Training Nullahs.-Small improvements with extensions were effected to existing nullahs.
Expenditure
$219.99
(b) Miscellaneous Drainage Works. New sewers and storm water drains varying in diameter froin 84” to 6′′ were constructed to a length of 13,081 feet, principally at To Kwa Wan, Ma Tau Wai, Kau Pui Shek, Sung Wong Toi, Ho Mun Tin and Kowloon Point. The existing large outfall sewers were extended at Kow- loon City. A nullah at Sung Wong Toi was extended seawards. Numerous additions and extensions to the existing storm water drainage in the several districts were completed. The number of drain connections made was 191. Many new gullies with flat gully gratings were constructed and connected to the storm water drainage system.
Expenditure
$98,209.06
161. Miscellaneous.-The following works were carried out under this head:-The Building of a rubble wall to N.W. of the Tsim Tsa Tsui Police Station and turfing of the slope, the pro- vision of gymnastic apparatus at the Police Training School, and
few other minor works.
Expenditure
...
$4,117.56