31
In addition the following works were under construction during the year: - Site formation for the New Government Civil Hospital at Pokfulam; new Residence for the Director, Royal Observatory; Government Bungalow at Fanling; Block of Quarters for Nurses at Kowloon Hospital; site preparation for the New Gaol at Stanley; Sextons Quarters at Chai Wan Cemetery; additional Wing containing Laboratory and Class Rooms at the Junior Technical School; Dormitory Block at Lai Chi Kok Gaol.
In addition to general maintenance, numerous minor alterations and improvements to Government Buildings were also executed during the year.
3. Communications.-The following works were completed: The Concourse Area at Jubilee Street Vehicular Ferry Pier was surfaced; completed portions of Jaffe & Thomson Roads were kerbed, channelled and surfaced; a new area for burial purposes was formed in the Colonial Cemetery; a further section of Connaught Road West from Eastern Street to Ping On Wharf was strengthened, sand-carpeting and surfacing on a 6" cement concrete foundation being laid; Kennedy Road - a further section of this road adjoining the Magazine was widened to 30 feet; a retaining wall adjoining I.L. 59 section A, Caine Road, was taken down and rebuilt to the new road alignment; dangerous bends on Tai Hang Road were improved; Stubbs Road was regraded between the Peak Hotel and Jardine's Corner; a portion of Prince Edward Road between the Railway Bridge and Leven Road surfaced with 7" reinforced concrete; Chatham Road between Middle Road and Austin Road laid with bottoming and surfacing; the Concourse Area at Jordan Road Vehicular Ferry Pier laid with bottoming and surfacing; Tai Po Road diverted at its junction with Castle Peak Road and laid with bottoming and surfacing; Children's Playground complete with shelter, lavatories and equipment erected at Kowloon Tong; area for Children's Playground formed at Tong Mi Road; area for Children's Playground formed at Shantung Street; the bend on Castle Peak Road opposite the Warders' Quarters widened and improved; the bend at top of Lai Chi Kok Hill on Castle Peak Road widened and improved. The strengthening and improvement of road surfaces in the New Territories was continued between 20th and 21st milestones - Castle Peak; between 30th and 35th milestones - Mei Po - Fanling; between Kwun Ti Race Course and 2nd milestone, Sha Tau Kok Road and at Tsun Wan Hill; also between Tai Wai Level Crossing (8 mile-stone) and 12½ mile-stone, Tai Po Road. The hilly portions of the Lin Ma Hang-Sha Tau Kok Patrol Path was surfaced.
The following works were under construction:-The 1st section of new road between Causeway Bay and Ming Yuen Gardens; a new road to Bathing Beaches (S.E. of Repulse Bay); widening of Robinson Road between Peak Road and Glenealy.
31
In addition the following works were under construction during the year: -Site formation for the New Government Civil Hospital at Pokfulam; new Residence for the Director, Royal Observatory: Government Bungalow at Fanling; Block of Quarters for Nurses at Kowloon Hospital; site preparation for the New Gaol at Stanley; Sextons Quarters at Chai Wan Cemetery; additional Wing containing Laboratory and Class Rooms at the Junior Technical School; Dormitory Block at Lai Chi Kok Goal.
In addition to general maintenance, numerous minor alterations and improvements to Government Buildings were also executed during the year.
3. Communications.-The following works were com pleted: The Concourse Area at Jubilee Street Vehicular Ferry Pier was surfaced; completed portions of Jaffe & Thomson Roads were kerbed, channelled and surfaced; a new area for burial purposes was formed in the Colonial Cemetery; a further section of Connaught Road West from Eastern Street to Ping On Wharf was strengthened, sandcarpeting and surfacing on a 6" cement concrete foundation being laid; Kennedy Road-a further section of this road adjoining the Magazine was widened to 30 feet; a retaining wall adjoining I.L. 59 section A, Caine Road, was taken down and rebuilt to the new road alignment; dangerous bends on Tai Hang Road were improved; Stubbs Road was regraded between the Peak Hotel and Jardine's Corner; a portion of Prince Edward Road between the Railway Bridge and Leven Road surfaced with 7" reinforced concrete; Chatham Road between Middle Road and Austin Road laid with bottoming and surfacing; the Concourse Area at Jordan Road Vehicular Ferry Pier laid with bottoming and surfacing; Taipo Road diverted at its junction with Castle Peak Road and laid with bottoming and surfacing; Children's Playground complete with shelter, lavatories and equipment erected at Kowloon Tong; area for Children's Playground formed at Tong Mi Road; area for Children's Playground formed at Shantung Street; the bend on Castle Peak Road opposite the Warders' Quarters widened and improved; the bend at top of Laichikok Hill on Castle Peak Road widened and improved. The strengthening and improvement of road surfaces in the New Territories was continued between 20th and 21st milestones- Castle Peak; between 30th and 35th milestones-Mei Po- Fanling; between Kwanti Race Course and 2nd milestone, Sha Tau Kok Road and at Tsun Wan Hill; also between Tai Wai Level Crossing (8 mile-stone) and 121⁄2 mile-stone, Taipo Road. The hilly portions of the Lin Ma Hang-Sha Tau Kok Patrol Path was surfaced.
The following works were under construction:-The 1st section of new 75 road between Causeway Bay and Ming Yuen Gardens; a new road to Bathing Beaches (S.E. of Repulse Bay); widening of Robinson Road between Peak Road and Glenealy