Works not appearing in
Estimates, Hong Kong.
Q 108
224. New Workshop on Praya East Reclamation.—Wiring for fans, lights and radiators; total points eighty-two.
Telephones were transferred from old Workshop to new workshop.
Special Vote Expenditure $37,200.00 $36,684.58
225. Improvements to Garden Road at junction with Queen Road (East Corner).—This work, which was referred to in paragraph 137 of last year's Report, was completed in April.
Special Vote Expenditure $6,000.00 $3,501.55
226. Continuation of Reclamation at Shaukiwan.—This work was referred to in paragraph 259 of last year's Report.
The works under this Contract comprising the reclamation of about 2.2 acres of foreshore and the construction of a nullah wall 320 feet in length was completed at the end of the year. The amount of filling required for the reclamation amounted to 42,428 cubic yards, of which 35,307 cubic yards were dumped during the year.
Special Vote...... Expenditure $15,500.00 $14,481.16
227. Construction of Rubble mound at North Point to retain materials dumped.—To provide for the development of back areas, it was expedient to permit the dumping of the spoil on the North Point foreshore. The dumping of this spoil necessitated protective works to prevent silting in the Harbour.
A contract for the construction of the protective works was let to Messrs. Sang Lee & Co. Work under the Contract commenced in September.
The total length of the protective works to be constructed amounts to 1,600 lineal feet. About 250 lineal feet of this total had been completed at the end of the year.
Special Vote Expenditure $20,000.00 $19,918.03
228. De-humidifying Plant.—This machine was ordered from England and was installed at the Victoria Peak W/T Station.
Special Vote Expenditure $3,290.00 $3,278.97
Works not appearing in
Estimates, Hong Kong.
Q 108
224. New Workshop on Praya East Reclamation.-Wiring for fans, lights and radiators; total points eighty two.
Telephones were transferred from old Workshop to new workshop.
Special Vote
Expenditure
$37,200.00
$36,684.58
225. Improvements to Garden Road at junction with Queen
Road (East Corner).—This work, which was referred to in paragraph 137 of last year's Report, was completed in April.
Special Vote Expenditure
$6,000.00 $3,501.55
226. Continuation of Reclamation at Shaukiwan.—This work was referred to in paragraph 259 of last year's Report.
The works under this Contract comprising the reclamation of about 2.2 acres of foreshore and the construction of a nullah wall 320 feet in length was completed at the end of the year. The amount of filling required for the reclamation amounted to 42,428 cube yards, of which 35.307 cube yards were dumped during the year.
Special Vote...... Expenditure
$15,500.00 $14,481.16
227. Construction of Rubble mound at North Point to retain materials dumped.—To. provide for the development of back areas, it was expedient to permit the dumping of the spoil on the North Point foreshore. The dumping of this spoil necessitated protective works to prevent silting in the Harbour.
A contract for the construction of the protective works was let to Messrs. Sang Lee & Co. Work under the Contract commenced in September.
The total length of the protective works to be constructed amounts to 1,600 lineal feet. About 250 lineal feet of this total had been completed at the end of the year.
Special Vote Expenditure
$20,000.00 $19,918.03
228. De-humidifying Plant.-This machine was ordered from England and was installed at the
the Victoria Peak
W/T Station.
Special Vote Expenditure
$ 3,290.00
$ 3,278.97
No comments yet.
Private notes are available after approval.