P.W.E. New Territories.

Q 104

The resumption referred to in Schedule A on page 25 of this report and the payments made by the Government in connection with the conversions and exchanges referred to at page were debited to this vote.

Estimates, $100,000.00

Expenditure (approved), $62,749.83

Less Amounts refunded, etc., $11,183.76

Net Expenditure, $51,566.07

P.W.E. NEW TERRITORIES.

General Works:-

209. Roads.—T. P. M. Ls. 828, 827, 777 and 814 Taipo Market Square to Bridge.—The streets fronting these lots were filled in to approved levels, kerbed, channelled, macadamized and tar painted.

Estimates Expenditure

Drainage: $2,000.00 $1,904.42

210. Training Nullahs.—145 feet of stream course was trained and a portion of the swamp was filled in between the Road and the Railway at Taipo (about 530 yards north-west of Taipo Railway Station) to combat mosquito breeding.

Estimates, Expenditure, $2,000.00 $1,989.38

211. Miscellaneous Drainage Works.—A 6" sewer was extended in scavenging lane behind T.M.L's. 847, 839 and 840 Taipo Market.

12″ and 15" cement concrete channels were laid at Un Long on the north side of Castle Peak Road.

The number of drain connection given was 20.

Estimates, Expenditure, $5,000.00 $3,538.29

212. Miscellaneous:-Under this head, the following minor works were carried out during the year.

Improvements to Path leading from well to Tsun Wan Police Station. Preliminary survey work for proposed Reservoir above Tai Tong, Shap Pat Heung District. Extending fresh water supply piping and provision of access to North East of Castle Peak Bathing Beach. Erection of mountings for Lewis Gun at Ta Ku Ling and Lin Tong Block House. Making good Path to Nam She Po from the Taip.

Edit History

2026-05-09 06:06:49 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P.W.E. New Territories. Q 104 The resumption referred to in Schedule A on page 25 of this report and the payments made by the Government in connection with the conversions and exchanges referred to at page were debited to this vote. Estimates, $100,000.00 Expenditure (approved), $62,749.83 Less Amounts refunded, etc., $11,183.76 Net Expenditure, $51,566.07 P.W.E. NEW TERRITORIES. General Works:- 209. Roads.—T. P. M. Ls. 828, 827, 777 and 814 Taipo Market Square to Bridge.—The streets fronting these lots were filled in to approved levels, kerbed, channelled, macadamized and tar painted. Estimates Expenditure Drainage: $2,000.00 $1,904.42 210. Training Nullahs.—145 feet of stream course was trained and a portion of the swamp was filled in between the Road and the Railway at Taipo (about 530 yards north-west of Taipo Railway Station) to combat mosquito breeding. Estimates, Expenditure, $2,000.00 $1,989.38 211. Miscellaneous Drainage Works.—A 6" sewer was extended in scavenging lane behind T.M.L's. 847, 839 and 840 Taipo Market. 12″ and 15" cement concrete channels were laid at Un Long on the north side of Castle Peak Road. The number of drain connection given was 20. Estimates, Expenditure, $5,000.00 $3,538.29 212. Miscellaneous:-Under this head, the following minor works were carried out during the year. Improvements to Path leading from well to Tsun Wan Police Station. Preliminary survey work for proposed Reservoir above Tai Tong, Shap Pat Heung District. Extending fresh water supply piping and provision of access to North East of Castle Peak Bathing Beach. Erection of mountings for Lewis Gun at Ta Ku Ling and Lin Tong Block House. Making good Path to Nam She Po from the Taip.
Baseline (Original)
P.W.E. New Territories. Q 104 The resumption referred to in Schedule A on page 25 of this report and the payments made by the Government in connection with the conversions and exchanges referred to at page debited to this vote. Estimates, $100,000.00 were Expenditure (approved), $ 62,749.83 Less Amounts refunded, etc., $ 11,183.76 Net Expenditure, $ 51,566.07 P.W.E. NEW TERRITORIES. General Works:- 209. Roads.-T. P. M. Ls. 828, 827, 777 and 814 Taipo Market Square to Bridge.—The streets fronting these lots were filled in to approved levels, kerbed, channelled, macadamized und tar painted. Estimates Expenditure Drainage: $2,000.00 $1,904.42 210. Training Nullahs.--145 feet of stream course was trained and a portion of the swamp was filled in between the Road and the Railway at Taipo (about 530 yards north-west of Taipo Railway Station) to combat mosquito breeding. Estimates, Expenditure, $2,000.00 $1,989.38 211. Miscellaneous Drainage Works.-A 6" sewer was ex- tended in scavenging lane behind T.M.L's. 847, 839 and 840 Taipo Market. 12′′ and 15" cement concrete channels were laid at Un Long on the north side of Castle Peak Road, The number of drain connection given was 20. Estimates, Expenditure, $5,000.00 $3,538.29 212. Miscellaneous:-Under this head, the following minor works were carried out during the year. Improvements to Path leading from well to Tsun Wan Police Station. Preliminary survey work for pro- posed Reservoir above Tai Tong, Shap Pat Heung District. Extending fresh water supply piping and provision of access to North East of Castle Peak Bathing Beach. Erection of mountings for Lewis Gun at Ta Ku Ling and Lin Tong Block House Making good Path to Nam She Po from the Taip.
2026-05-09 06:06:49 · Baseline
View content

P.W.E. New Territories.

Q 104

The resumption referred to in Schedule A on page 25 of this report and the payments made by the Government in connection with the conversions and exchanges referred to at page

debited to this vote.

Estimates,

$100,000.00

were

Expenditure (approved),

$ 62,749.83

Less Amounts refunded, etc.,

$ 11,183.76

Net Expenditure,

$ 51,566.07

P.W.E. NEW TERRITORIES.

General Works:-

209. Roads.-T. P. M. Ls. 828, 827, 777 and 814 Taipo Market Square to Bridge.—The streets fronting these lots were filled in to approved levels, kerbed, channelled, macadamized und tar painted.

Estimates Expenditure

Drainage:

$2,000.00 $1,904.42

210. Training Nullahs.--145 feet of stream course was trained and a portion of the swamp was filled in between the Road and the Railway at Taipo (about 530 yards north-west of Taipo Railway Station) to combat mosquito breeding.

Estimates, Expenditure,

$2,000.00 $1,989.38

211. Miscellaneous Drainage Works.-A 6" sewer was ex- tended in scavenging lane behind T.M.L's. 847, 839 and 840 Taipo Market.

12′′ and 15" cement concrete channels were laid at Un Long

on the north side of Castle Peak Road,

The number of drain connection given was 20.

Estimates, Expenditure,

$5,000.00

$3,538.29

212. Miscellaneous:-Under this head, the following minor works were carried out during the year.

Improvements to Path leading from well to Tsun Wan Police Station. Preliminary survey work for pro- posed Reservoir above Tai Tong, Shap Pat Heung District. Extending fresh water supply piping and provision of access to North East of Castle Peak Bathing Beach. Erection of mountings for Lewis Gun at Ta Ku Ling and Lin Tong Block House Making good Path to Nam She Po from the Taip.