P.W.E. Kowloon.
Q 88
The number of drain connections made was 448.
Many new gullies with flat gully gratings were constructed and connected to the stormwater drainage system.
Estimates, Expenditure,
$180,000.00 $118,179.91
160. Miscellaneous.-The following is a brief description of the works executed under this head:
Repairs after fire at P.W.D. Drainage Depot, Blinds to verandahs at Kowloon British School, Extinguishers for Kowloon Disinfecting Station, New bridge between houses at Police Training School. facing portion of Market Area at Waterloo Road and Shek Lung Street for Vegetable Stalls.
Sur-
Filling in water holes at Hau Pui Loong and in Valley West side of Argyle Street and south side of Waterloo Road in connection with the prevention of mosquito breeding.
Improvements and additions were carried out in six buildings; total points-thirty two.
Traffic control lights were installed at Junction of Nathan and Salisbury Roads, and at Prince Edward and Nathan Roads.
Ten telephones and one sub-exchange were installed in various places.
Estimates Expenditure
$10,000.00 $ 7,459.38
161. Water Works.-The following mains were laid under this heading.
535 lin. feet of 6" C.I. main in Salisbury Road between Ashley and Canton Roads owing to new road surfacing. This main replaced some old 4″ main.
390 lin. feet of 4″ C.I. main in Sai Yeung Choi Street, northwards from Mong Kok Road.
266 lin. feet of 6″ C.I. main in Portland Street southwards from Lai Chi Kok Road. This main terminates near Nathan Road but is not connected to the Nathan Road main.
335 lin. feet of 6" C.I. main in Peking Road between Nathan and Hankow Roads. This main replaces an old 3″ main.
180 lin. feet of 4″ C.I main in Middle Road westwards from Hankow Road to new Police Quarters.
P.W.E. Kowloon.
Q 88
The number of drain connections made was 448.
Many new gullies with flat gully gratings were constructed
and connected to the stormwater drainage system.
Estimates,
Expenditure,
$180,000.00
$118,179.91
160. Miscellaneous.-The following is a brief description of the works executed under this head:
Repairs after fire at P.W.D. Drainage Depot, Blinds to verandahs at Kowloon British School, Extinguishers for Kowloon Disinfecting Station, New bridge between houses at Police Training School. facing portion of Market Area at Waterloo Road and Shek Lung Street for Vegetable Stalls.
Sur-
Filling in water holes at Hau Pui Loong and in Valley West side of Argyle Street and south side of Water- loo Road in connection with the prevention of mosquito breeding.
Improvements and additions were carried out in six build- ings; total points-thirty two.
Traffic control lights were installed at Junction of Nathan and Salisbury Roads, and at Prince Edward and Nathan Roads.
Ten telephones and one sub-exchange were installed in various places.
Estimates
Expenditure
$10,000.00
$ 7,459.38
161. Water Works.-The following mains were laid under this heading. 535 lin, feet of 6" C.I. main in Salisbury Road between Ashley and Canton Roads owing to new road surfacing. This main replaced some old 4′′ main. 390 lin. feet of 4′′ C.I. main in Sai Yeung Choi Street, northwards from Mong Kok Road.
266 lin. feet of 6′′ C.I. main in Portland Street southwards from Lai Chi Kok Road. This main terminates near Nathan Road but is not connected to the Nathan Road main.
335 lin. feet of 6" C.I. Nathan and Hankow Roads.
main in Peking Road between This main replaces an old 3′′ main.
180 lin. feet of 4′′ C.I main in Middle Road westwards from Hankow Road to new Police Quarters.
No comments yet.
Private notes are available after approval.