69
P.W.E. Hong Kong.
(d) 216 feet of the supply main from Elliot Filters to Kennedy Town Tank were relaid in 6" C.I. Pipe.
(e) 386 feet of 3″ main were laid in Caine Road between Castle Road and Peel Street.
(f) The 2″ main from Plunkett's Road to Mountain View was relaid for a length of 250 feet in 3″ W.I. Pipe.
Estimates $15,000.00. Expenditure $12,033.62
122. Port Works.—Borings were taken on the site in front of the Fire Station at Jubilee Street, to ascertain the nature of the foundations for the Vehicular Ferry Pier Scheme. Boulders causing an obstruction to navigation were removed from the Praya Reclamation frontage, and minor works of a miscellaneous nature such as investigations in respect of dumping of material on the foreshores, fixing of sign boards, &c. were carried out during the year.
Estimates, $5,000.00 Expenditure, $3,357.00
123. Road from Causeway Bay to Quarry Bay section 70 feet wide, opposite M.L.s. 430 and 431.—This work was referred to in paragraph 181 of last year's Report and was satisfactorily completed by the end of October, 1930.
Estimates $15,000.00 Supplementary Vote $6,200.00 Expenditure $21,200.00 $20,705.26
124. Tai Hang Development Road Construction including strengthening Conduit.—This work was referred to in paragraph 132 of last year's Report and was practically completed by the end of the year.
Estimates $60,000.00 Expenditure $41,793.96
125. Barker Road Improvement from Stubbs Road to Victoria Hospital.—This work was referred in paragraph 133 of last year's Report and was completed by the end of the year.
Estimates $19,000.00 Expenditure $17,811.64
69
P.W.E. Hong Kong.
(d) 216 feet of the supply main from Elliot Filters to
Kennedy Town Tank were relaid in 6" C.I. Pipe. (e) 386 feet of 3′′ main were laid in Caine Road between
Castle Road and Peel Street.
(f) The 2′′ main from Plunkett's Road to Mountain View was relaid for a length of 250 feet in 3′′ W.I. Pipe.
Estimates Expenditure
$15,000.00. $12,033.62
122. Port Works.-Borings were taken on the site in front of the Fire Station at Jubilee Street, to ascertain the nature of the foundations for the Vehicular Ferry Pier Scheme. Boulders causing an obstruction to navigation were removed from the Praya Reclamation frontage, and minor works of a miscellaneous nature such as investigations in respect of dumping of material on the foreshores, fixing of sign boards, &c. were carried out during the year.
Estimates,
Expenditure,
Communications:
$5,000.00 $3,357.00
123. Road from Causeway Bay to Quarry Bay section 70 feet wide, opposite M.L.s. 430 and 431.—This work was referred to in paragraph 181 of last year's Report and was satisfactorily completed by the end of October, 1930.
Estimates
Supplementary Vote
Expenditure
$15,000.00 $ 6,200.00
$21,200.00
$20,705.26
124. Tai Hang Development Road Construction including strengthening Conduit.—This work was referred to in paragraph 132 of last year's Report and was practically completed by the end of the year.
Estimates Expenditure
$60,000.00 $41,793.96
125. Barker Road Improvement from Stubbs Road to Victoria Hospital.—This work was referred in paragraph 133 of last year's Report and was completed by the end of the year.
Estimates
$19,000.00
Expenditure
$17,811.64