AnnualReport-1930 — Page 584

Administrative Reports 行政報告書 All AI Reviewed

P.W.R. Hong Kong.

Q 30

The following are particulars of the additional areas laid with improved surfacing during the year:-

1. Tarring and sanding Square Yards. 36,420 2. 21″ granolithic paving slabs laid on footways 7,436 3. Substitution of granite setts for macadam or concrete 58 4. Substitution of asphaltic sand-carpeting laid on concrete for ordinary macadam 43,150 5. Substitution of tar macadam for ordinary macadam 2,130

Estimates $125,000.00

Expenditure $124,148.03

42. Maintenance of Roads and Bridges Outside City. Improvements to Roads and Bridges Outside City. Approximately 90 miles of roads.-The road surfaces were maintained in a satisfactory condition.

Additional parapet walls were erected at dangerous points on Pokfulam Road. A portion of Coombe Road was widened to admit of motor traffic.

A large amount of concrete channelling, surfacing scavenging lanes and reconditioning of road-surfacing were carried out at Tai Hang, Sai Wan Ho, Shaukiwan and Barker Road.

The following are particulars of the improved surfacing introduced on a number of roads in addition to those mentioned in previous reports:

(1). Tarring and sanding Square yards. 15,211 (2). 21″ granolithic paving slabs laid on footways 764 (3). Substitution of tar macadam for ordinary macadam 7,200

Estimates $136,000.00

Expenditure $116,016.70

Edit History

2026-05-09 05:57:33 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P.W.R. Hong Kong. Q 30 The following are particulars of the additional areas laid with improved surfacing during the year:- 1. Tarring and sanding Square Yards. 36,420 2. 21″ granolithic paving slabs laid on footways 7,436 3. Substitution of granite setts for macadam or concrete 58 4. Substitution of asphaltic sand-carpeting laid on concrete for ordinary macadam 43,150 5. Substitution of tar macadam for ordinary macadam 2,130 Estimates $125,000.00 Expenditure $124,148.03 42. Maintenance of Roads and Bridges Outside City. Improvements to Roads and Bridges Outside City. Approximately 90 miles of roads.-The road surfaces were maintained in a satisfactory condition. Additional parapet walls were erected at dangerous points on Pokfulam Road. A portion of Coombe Road was widened to admit of motor traffic. A large amount of concrete channelling, surfacing scavenging lanes and reconditioning of road-surfacing were carried out at Tai Hang, Sai Wan Ho, Shaukiwan and Barker Road. The following are particulars of the improved surfacing introduced on a number of roads in addition to those mentioned in previous reports: (1). Tarring and sanding Square yards. 15,211 (2). 21″ granolithic paving slabs laid on footways 764 (3). Substitution of tar macadam for ordinary macadam 7,200 Estimates $136,000.00 Expenditure $116,016.70
Baseline (Original)
P.W.R. Hong Kong. Q 30 The following are particulars of the additional areas laid with improved surfacing during the year:- 1. Tarring and sanding 2. 21" granolithic paving slabs laid on footways 3. Substitution of granite setts for macadam or concrete Square Yards. 36,420 7,436 58 4. Substitution of asphaltic sand- carpeting laid on concrete for ordinary macadam 43,150 5. Substitution of tar macadam for ordinary macudurn 2,130 Estimates $125,000.00 Expenditure $124,148.03 42. Maintenance of Roads and Bridges Outside City. Improvements to Roads and Bridges Outside City. Approximately 90 miles of roads.-The road surfaces were main- tained in a satisfactory condition. Additional parapet walls were erected at dangerous points on Pokulam Road. A portion of Coombe Road was widened to admit of motor traffic. A large amount of concrete channelling, surfacing scavenging lanes and reconditioning of road-surfacing were carried out at Tai Hang, Sai Wan Ho, Shaukiwan and Barker Road. The following are particulars of the improved surfacing in- troduced on a number of roads in addition to those mentioned in previous reports: Square yards. (1). Tarring and sanding 15,211 (2). 21′′ granolithic paving slabs laid on footways 764 (3). Substitution of tar macadam for ordinary macadam 7,200 Estimates $136,000.00 Expenditure $116,016.70
2026-05-09 05:57:33 · Baseline
View content

P.W.R. Hong Kong.

Q 30

The following are particulars of the additional areas laid with improved surfacing during the year:-

1.

Tarring and sanding

2. 21" granolithic paving slabs laid

on footways

3.

Substitution of granite setts for macadam or concrete

Square Yards.

36,420

7,436

58

4.

Substitution of asphaltic sand-

carpeting laid on concrete for ordinary macadam

43,150

5. Substitution of tar macadam for

ordinary macudurn

2,130

Estimates

$125,000.00

Expenditure

$124,148.03

42. Maintenance of Roads and Bridges Outside City. Improvements to Roads and Bridges Outside City. Approximately 90 miles of roads.-The road surfaces were main- tained in a satisfactory condition.

Additional parapet walls were erected at dangerous points on Pokulam Road. A portion of Coombe Road was widened to admit of motor traffic.

A large amount of concrete channelling, surfacing scavenging lanes and reconditioning of road-surfacing were carried out at Tai Hang, Sai Wan Ho, Shaukiwan and Barker Road.

The following are particulars of the improved surfacing in- troduced on a number of roads in addition to those mentioned in previous reports:

Square yards.

(1). Tarring and sanding

15,211

(2). 21′′ granolithic paving slabs

laid on footways

764

(3). Substitution of tar macadam

for ordinary macadam

7,200

Estimates

$136,000.00

Expenditure

$116,016.70