Size. Description. Length (in feet). Locality. Position. Remarks. 6" 381 Taikoktsui. In Tung Chan Street from Prince Edward Road to opposite Jane K.I.L. 1724 and in scavenging lane of K.I.L. 1724. Completed. 6" 131 Mongkok. In scavenging lane of 17 K.I.L. 1725 from Prince Edward Road. 6" 348 Taikoktsui. In scavenging lane behind K.J.L. 1749. "" 156 "" In Prince Edward Road and up scavenging lane of K.I.L. 1928. 6" 154 Mongkok. In scavenging lane behind K.I.Ls. 2159 and 2160 Fife Street. "" P. W. E. Kowloon. A

The number of drain connections was 317.

Many new gullies with flat gully gratings were constructed and connected to the stormwater drainage system.

Estimates, Supplementary Vote, $ 75,000.00 87,640.00 Expenditure, $162,640.00 $145,958.55

183. Miscellaneous.-The following is a brief description of the principal works carried out under this heading:-

Police Training School-Supplying and fixing geysers. Royal Observatory-Provision of an auxiliary water tank. Tsim Sha Tsui Police Station-Reconstruction of an existing footpath. Fire Extinguishers were supplied to the following buildings:-Kowloon Junior School and Kowloon British School.

A reinforced concrete bridge, for pedestrians and rickshas, was constructed over Argyle Street nullah opposite Fa Yuen Street.

Edit History

2026-05-09 03:35:27 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 87 I Size. Description. Length (in feet). Locality. Position. Remarks. 6" 381 Taikoktsui. In Tung Chan Street from Prince Edward Road to opposite Jane K.I.L. 1724 and in scavenging lane of K.I.L. 1724. Completed. 6" 131 Mongkok. In scavenging lane of 17 K.I.L. 1725 from Prince Edward Road. 6" 348 Taikoktsui. In scavenging lane behind K.J.L. 1749. "" 156 "" In Prince Edward Road and up scavenging lane of K.I.L. 1928. 6" 154 Mongkok. In scavenging lane behind K.I.Ls. 2159 and 2160 Fife Street. "" P. W. E. Kowloon. A The number of drain connections was 317. Many new gullies with flat gully gratings were constructed and connected to the stormwater drainage system. Estimates, Supplementary Vote, $ 75,000.00 87,640.00 Expenditure, $162,640.00 $145,958.55 183. Miscellaneous.-The following is a brief description of the principal works carried out under this heading:- Police Training School-Supplying and fixing geysers. Royal Observatory-Provision of an auxiliary water tank. Tsim Sha Tsui Police Station-Reconstruction of an existing footpath. Fire Extinguishers were supplied to the following buildings:-Kowloon Junior School and Kowloon British School. A reinforced concrete bridge, for pedestrians and rickshas, was constructed over Argyle Street nullah opposite Fa Yuen Street.
Baseline (Original)
Q 87 I Size. Description. Length (in feet). Locality. 6" Sewer 381 Taikoktsni. 6" 6" 6" 131 Mongkok. 348 Taikokisui. "" 156 "" 6" "" 154 Mongkok. P. W. E. Kowloon. Position. Remarks. In Tung Chan Street from Completed. Prince Edward Road to opposite scavenging Jane K.I.L. 1724 and in scavenging lane of KI.L. 1724. In scavenging lane of 17 K.I.L. 1725 from Prince Edward Road. In scavenging lane behind K.J.L. 1749. In Prince Edward Roal and up scavenging lane of K.I.L. 1928. In scavenging lane behind K.I.Ls. 2159 and 2160 Fife Street. "" A รา The number of drain connections was 317. Many new gullies with flat gully gratings were constructed and connected to the stormwater drainage system. Estimates, Supplementary Vote, $ 75.000.00 87,640.00 Expenditure, $162,640.00 $145,958.55 183. Miscellaneous.-The following is a brief description of the principal works carried out under this heading:- Police Training School-Supplying and fixing geysers. Royal Observatory-Provision of an auxiliary water tank. Tsim Sha Tsui Police Station-Reconstruc- tion of an existing footpath. Fire Extincteurs were supplied to the following buildings:-Kowloon Junior School and Kowloon British School. A reinforced concrete bridge, for pedestrians and rickshas, was constructed over Argyle Street nullah opposite Fa Yuen Street.
2026-05-09 03:35:27 · Baseline
View content

Q 87

I

Size. Description.

Length (in feet).

Locality.

6"

Sewer

381

Taikoktsni.

6"

6"

6"

131 Mongkok.

348

Taikokisui.

""

156

""

6"

""

154

Mongkok.

P. W. E. Kowloon.

Position.

Remarks.

In Tung Chan Street from Completed.

Prince Edward Road to opposite scavenging Jane K.I.L. 1724 and in scavenging lane of KI.L. 1724.

In scavenging lane

of

17

K.I.L. 1725 from Prince Edward Road.

In scavenging lane behind

K.J.L. 1749.

In Prince Edward Roal and up scavenging lane of K.I.L. 1928.

In scavenging lane behind K.I.Ls. 2159 and 2160 Fife Street.

""

A

รา

The number of drain connections was 317.

Many new gullies with flat gully gratings were constructed and connected to the stormwater drainage system.

Estimates, Supplementary Vote,

$ 75.000.00

87,640.00

Expenditure,

$162,640.00

$145,958.55

183. Miscellaneous.-The following is a brief description of the principal works carried out under this heading:-

Police Training School-Supplying and fixing geysers. Royal Observatory-Provision of an auxiliary water tank. Tsim Sha Tsui Police Station-Reconstruc- tion of an existing footpath. Fire Extincteurs were supplied to the following buildings:-Kowloon Junior School and Kowloon British School.

A reinforced concrete bridge, for pedestrians and rickshas, was constructed over Argyle Street nullah opposite Fa Yuen Street.