Q 71

P.W.E. Hong Kong.

The work was commenced in October and good progress was made by the end of the year.

Estimates, Expenditure,

$70,000.00 $30,381.70

150. Provision of traffic protection by means of white lines and/or studs. A considerable number of white lines were painted and aluminium studs were also fixed at various points in the City and Outside City Districts.

Estimates, Expenditure,

$6,000.00 $5,044.00

151. Government Pavilions, Peak (Water carriage system). -The work consisted of the installation of a water carriage system to these two houses in place of the existing dry latrines. Commenced in July, the installation was completed in September.

Estimates, Expenditure,

$1,400.00 $1,367.31

152. Mountain Lodge-Improvements.—This work, which consisted of the erection of a Tennis Pavilion and a Laundry, was deferred. No expenditure was incurred under this heading.

Estimates, Expenditure,

$5,500.00 Nil.

153. Waglan Lighthouse New Electrical Installation.-A 3 K.W. 110V. kerosine electric set together with a suitable 120 A.H. secondary battery was installed.

Estimates, Expenditure,

$6,850.00 $5,587.65

154. Central Police Station, Chief Detective Inspector's Office, Alterations to Building and constructing Offices.—The work consisted of minor alterations and the conversion of three large barrack rooms on the first floor of the Main Building into offices by the erection of glazed partitions to provide accommodation for the Criminal Investigation Department in a more concentrated manner.

The offices vacated by the transfer were fitted up for use as barrack rooms.

Edit History

2026-05-09 03:31:42 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 71 P.W.E. Hong Kong. The work was commenced in October and good progress was made by the end of the year. Estimates, Expenditure, $70,000.00 $30,381.70 150. Provision of traffic protection by means of white lines and/or studs. A considerable number of white lines were painted and aluminium studs were also fixed at various points in the City and Outside City Districts. Estimates, Expenditure, $6,000.00 $5,044.00 151. Government Pavilions, Peak (Water carriage system). -The work consisted of the installation of a water carriage system to these two houses in place of the existing dry latrines. Commenced in July, the installation was completed in September. Estimates, Expenditure, $1,400.00 $1,367.31 152. Mountain Lodge-Improvements.—This work, which consisted of the erection of a Tennis Pavilion and a Laundry, was deferred. No expenditure was incurred under this heading. Estimates, Expenditure, $5,500.00 Nil. 153. Waglan Lighthouse New Electrical Installation.-A 3 K.W. 110V. kerosine electric set together with a suitable 120 A.H. secondary battery was installed. Estimates, Expenditure, $6,850.00 $5,587.65 154. Central Police Station, Chief Detective Inspector's Office, Alterations to Building and constructing Offices.—The work consisted of minor alterations and the conversion of three large barrack rooms on the first floor of the Main Building into offices by the erection of glazed partitions to provide accommodation for the Criminal Investigation Department in a more concentrated manner. The offices vacated by the transfer were fitted up for use as barrack rooms.
Baseline (Original)
Q 71 P.W.E. Hong Kong. The work was commenced in October and good progress was made by the end of the year. Estimates, Expenditure, $70,000.00 $30,381.70 150. Provision of traffic protection by means of white lines and/or studs. A considerable number of white lines were painted and aluminium studs were also fixed at various points in the City and Outside City Districts. Estimates, Expenditure, $6,000.00 $5,044.00 151. Government Pavilions, Peak (Water carriage system). -The work consisted of the installation of a water carriage system to these two houses in place of the existing dry latrines. Commenced in July the installation was completed in September. Estimates, Expenditure, $1,400.00 $1,367.31 152. Mountain Lodge-Improvements.—This work, which consisted of the erection of a Tennis Pavilion and a Laundry, was deferred. No expenditure was incurred under this heading. Estimates, Expenditure, $5,500.00 Nil. 153. Waglan Lighthouse New Electrical Installation.-A 3 K.W. 110V. kerosine electric set together with a suitable 120 A.H. secondary battery was installed. Estimates, Expenditure, $6,850.00 $5,587.65 154. Central Police Station, Chief Detective Inspector's Office, Alterations to Building and constructing Offices.—The work consisted of minor alterations and the conversion of three large barrack rooms on the first floor of the Main Building into offices by the erection of glazed partitions to provide accommoda- tion for the Criminal Investigation Department in a more con- centrated manner. The offices vacated by the transfer were fitted up for use as barrack rooms.
2026-05-09 03:31:42 · Baseline
View content

Q 71

P.W.E. Hong Kong.

The work was commenced in October and good progress was made by the end of the year.

Estimates, Expenditure,

$70,000.00 $30,381.70

150. Provision of traffic protection by means of white lines and/or studs. A considerable number of white lines were painted and aluminium studs were also fixed at various points in the City and Outside City Districts.

Estimates, Expenditure,

$6,000.00 $5,044.00

151. Government Pavilions, Peak (Water carriage system). -The work consisted of the installation of a water carriage system to these two houses in place of the existing dry latrines. Commenced in July the installation was completed in September.

Estimates, Expenditure,

$1,400.00 $1,367.31

152. Mountain Lodge-Improvements.—This work, which consisted of the erection of a Tennis Pavilion and a Laundry, was deferred. No expenditure was incurred under this heading.

Estimates, Expenditure,

$5,500.00

Nil.

153. Waglan Lighthouse New Electrical Installation.-A 3 K.W. 110V. kerosine electric set together with a suitable 120 A.H. secondary battery was installed.

Estimates, Expenditure,

$6,850.00 $5,587.65

154. Central Police Station, Chief Detective Inspector's Office, Alterations to Building and constructing Offices.—The work consisted of minor alterations and the conversion of three large barrack rooms on the first floor of the Main Building into offices by the erection of glazed partitions to provide accommoda- tion for the Criminal Investigation Department in a more con- centrated manner.

The offices vacated by the transfer were fitted up for use as barrack rooms.