P.W.R. Hong Kong.

A total quantity of 12,023 cubic yards of which 6,434 cubic yards were made into tar macadam, 1,365 cubic yards into Sand Carpeting and 4,224 cubic yards were delivered to various works as the material came from the crushers. Further 21,274 granolithic paving slabs were provided for use on footways; 36 reinforced concrete standards for railings and 52 rubber squeegees were made.

The following are particulars of the additional areas laid with improved surfacing during the year:—

1. Tarring and sanding Square Yards. Estimates $105,000.00 Expenditure $100,725.74 2. 2½" granolithic paving slabs laid on footways 5,512 20,000.00 19,077.62 3. Substitution of 2" asphaltum laid on cement concrete bed for macadam 15,833 4. Substitution of tar macadam for ordinary macadam 500 = $125,000.00 = $119,803.36

47. Maintenance of Roads and Bridges Outside City. Improvements to Roads and Bridges Outside City. Approximately 78 miles of roads.—The road surfaces were maintained in a satisfactory condition.

Additional parapet walls were erected at dangerous points on the road around the Island and the hair-pin bend at the junction of Island Road and road to Stanley Beach was widened.

A large amount of concrete channelling and surfacing of lanes etc. was carried out at Tai Hang, Shaukiwan, Stanley, Aberdeen and Ap Liu Chau.

The following are particulars of the improved surfacing introduced on a number of roads in addition to those mentioned in previous reports:-

1. Tarring and sanding Square yards. 58,050 Estimates $130,000.00 Expenditure $111,432.06 2. Substitution of tar macadam for ordinary macadam 32,590 6,000.00 = $136,000.00 3,513.54 = $114,945.60

Edit History

2026-05-09 03:24:56 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 29 P.W.R. Hong Kong. A total quantity of 12,023 cubic yards of which 6,434 cubic yards were made into tar macadam, 1,365 cubic yards into Sand Carpeting and 4,224 cubic yards were delivered to various works as the material came from the crushers. Further 21,274 granolithic paving slabs were provided for use on footways; 36 reinforced concrete standards for railings and 52 rubber squeegees were made. The following are particulars of the additional areas laid with improved surfacing during the year:— 1. Tarring and sanding Square Yards. Estimates $105,000.00 Expenditure $100,725.74 2. 2½" granolithic paving slabs laid on footways 5,512 20,000.00 19,077.62 3. Substitution of 2" asphaltum laid on cement concrete bed for macadam 15,833 4. Substitution of tar macadam for ordinary macadam 500 = $125,000.00 = $119,803.36 47. Maintenance of Roads and Bridges Outside City. Improvements to Roads and Bridges Outside City. Approximately 78 miles of roads.—The road surfaces were maintained in a satisfactory condition. Additional parapet walls were erected at dangerous points on the road around the Island and the hair-pin bend at the junction of Island Road and road to Stanley Beach was widened. A large amount of concrete channelling and surfacing of lanes etc. was carried out at Tai Hang, Shaukiwan, Stanley, Aberdeen and Ap Liu Chau. The following are particulars of the improved surfacing introduced on a number of roads in addition to those mentioned in previous reports:- 1. Tarring and sanding Square yards. 58,050 Estimates $130,000.00 Expenditure $111,432.06 2. Substitution of tar macadam for ordinary macadam 32,590 6,000.00 = $136,000.00 3,513.54 = $114,945.60
Baseline (Original)
Q 29 P.W.R. Hong Kong. A total quantity of 12,023 cubic yards of which 6,434 cubic yards were made into tar macadam, 1365 cubic yards into Sand Carpeting and 4224 cubic yards were delivered to various works as the material came from the crushers. Further 21,274 grano- lithic paving slabs were provided for use on footways; 36 rein- forced concrete standards for railings and 52 rubber squeegees were made. The following are particulars of the additional areas laid with improved surfacing during the year:— 1. Tarring and sanding 2. 21" granolithic paving slabs laid on footways 3. Substitution of 2" asphaltum laid on cement concrete bed for macadam 4. Substitution of tar macadam for ordin- ary macadam Estimates Square Yards. 60,747 5,512 15,833 A 500 $105,000.00) 20,000.00ƒ = $125,000.00 = - $119,803.36 Expenditure $100,725.741 19,077.62ƒ 47. Maintenance of Roads and Bridges Outside City. Improvements to Roads and Bridges Outside City. Approximately 78 miles of roads.—The road surfaces were main- tained in a satisfactory condition. Additional parapet walls were erected at dangerous points on the road around the Island and the hair-pin bend at the junction of Island Road and road to Stanley Beach was widened. A large amount of concrete channelling and surfacing of lanes etc. was carried out at Tai Hang, Shaukiwan, Stanley, Aberdeen and Aplichau. The following are particulars of the improved surfacing in- troduced on a number of roads in addition of those mentioned in previous reports:- 1. Tarring and sanding 2. Substitution of tar macadam for ord- inary macadam Estimates Square yards. 58,050 32,590 $130,000.001 6,000.00 = $136,000.00 Expenditure $111,432.061 3,513.54ƒ = $114,945.60
2026-05-09 03:24:56 · Baseline
View content

Q 29

P.W.R. Hong Kong.

A total quantity of 12,023 cubic yards of which 6,434 cubic yards were made into tar macadam, 1365 cubic yards into Sand Carpeting and 4224 cubic yards were delivered to various works as the material came from the crushers. Further 21,274 grano- lithic paving slabs were provided for use on footways; 36 rein- forced concrete standards for railings and 52 rubber squeegees were made.

The following are particulars of the additional areas laid with improved surfacing during the year:—

1. Tarring and sanding

2. 21" granolithic paving slabs laid on

footways

3. Substitution of 2" asphaltum laid on

cement concrete bed for macadam

4. Substitution of tar macadam for ordin-

ary macadam

Estimates

Square Yards.

60,747

5,512

15,833

A

500

$105,000.00) 20,000.00ƒ

= $125,000.00

= - $119,803.36

Expenditure

$100,725.741

19,077.62ƒ

47. Maintenance of Roads and Bridges Outside City. Improvements to Roads and Bridges Outside City. Approximately 78 miles of roads.—The road surfaces were main- tained in a satisfactory condition.

Additional parapet walls were erected at dangerous points on the road around the Island and the hair-pin bend at the junction of Island Road and road to Stanley Beach was widened.

A large amount of concrete channelling and surfacing of lanes etc. was carried out at Tai Hang, Shaukiwan, Stanley, Aberdeen and Aplichau.

The following are particulars of the improved surfacing in- troduced on a number of roads in addition of those mentioned in previous reports:-

1. Tarring and sanding

2. Substitution of tar macadam for ord-

inary macadam

Estimates

Square yards.

58,050

32,590

$130,000.001

6,000.00

=

$136,000.00

Expenditure

$111,432.061 3,513.54ƒ

= $114,945.60