18

Two Bridle Tracks 9 miles in length were constructed during the year:-

(1) on the South side of the Island, between Wanchai Gap and the road from Wongneichong Gap-Little Hong Kong.

(2) on the North side of the Island, between Wongneichong Gap and Mount Parker Road, completed.

Kowloon.-Argyle Street Extension to a width of 60 feet was completed. Chatham Road Extension and Boundary Street, (section from Nathan Road to No. 8 Railway Bridge) were in course of construction.

Portions of new roads, an aggregate of 1 mile, were macadamized, kerbed and channeled adjoining new buildings erected during the course of the year.

New Kowloon. In the widening of Castle Peak Road, half width of the roadway was completed. Extension of Roads in Kowloon Tong Development Area was in progress.

Kerbing, channelling and macadamising roads on the Kowloon Tong Estate was completed, the total length of new roads being 3 miles.

New Territories.-Patrol Path from Lin Ma Hang to Sha Tau Kok, Widening Path from Sheung Shui to Ta Ku Ling, Access and Patrol Path to Lo Wu Railway Station Block House, Widening road between Fanling and Sha Tau Kok were in progress.

DRAINAGE.

Hong Kong. The reconstruction of Wongneichong Nullah, Section No. 4 (in front of Jockey Club Stands) was completed in October.

New sewers and storm water drains, including sewers on the Praya East Reclamation, were constructed to a length of 18,064 feet. Existing drains in the Wanchai district were reconstructed to a length of 2,786 feet.

Stream-courses were trained to a length of 1,897 feet.

Kowloon.-New sewers and storm water drains were constructed to a length of 22,261 feet.

Trenches were cut in connection with the anti-malarial campaign.

New Kowloon.-New sewers and storm water drains were constructed to a length of 7,202 feet.

Anti-malarial work was continued.

Edit History

2026-05-09 01:07:16 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
18 Two Bridle Tracks 9 miles in length were constructed during the year:- (1) on the South side of the Island, between Wanchai Gap and the road from Wongneichong Gap-Little Hong Kong. (2) on the North side of the Island, between Wongneichong Gap and Mount Parker Road, completed. Kowloon.-Argyle Street Extension to a width of 60 feet was completed. Chatham Road Extension and Boundary Street, (section from Nathan Road to No. 8 Railway Bridge) were in course of construction. Portions of new roads, an aggregate of 1 mile, were macadamized, kerbed and channeled adjoining new buildings erected during the course of the year. New Kowloon. In the widening of Castle Peak Road, half width of the roadway was completed. Extension of Roads in Kowloon Tong Development Area was in progress. Kerbing, channelling and macadamising roads on the Kowloon Tong Estate was completed, the total length of new roads being 3 miles. New Territories.-Patrol Path from Lin Ma Hang to Sha Tau Kok, Widening Path from Sheung Shui to Ta Ku Ling, Access and Patrol Path to Lo Wu Railway Station Block House, Widening road between Fanling and Sha Tau Kok were in progress. DRAINAGE. Hong Kong. The reconstruction of Wongneichong Nullah, Section No. 4 (in front of Jockey Club Stands) was completed in October. New sewers and storm water drains, including sewers on the Praya East Reclamation, were constructed to a length of 18,064 feet. Existing drains in the Wanchai district were reconstructed to a length of 2,786 feet. Stream-courses were trained to a length of 1,897 feet. Kowloon.-New sewers and storm water drains were constructed to a length of 22,261 feet. Trenches were cut in connection with the anti-malarial campaign. New Kowloon.-New sewers and storm water drains were constructed to a length of 7,202 feet. Anti-malarial work was continued.
Baseline (Original)
18 Two Bridle Tracks 9 miles in length were constructed during the year:- (1) on the South side of the Island, between Wanchai Gap and the road from Wongneichong Gap-Little Hong Kong. (2) on the North side of the Island, between Wongneichong Gap and Mount Parker Road. completed. Kowloon.-Argyle Street Extension to a width of 60 feet was Chatham Road Extension and Boundary Street, (section from Nathan Road to No. 8 Railway Bridge) were in course of construction. Portions of new roads, an aggregate of 1 mile, were macadamized, kerbed and channeled adjoining new buildings erected during the course of the year. New Kowloon. In the widening of Castle Peak Road, half width of the roadway was completed. Extension of Roads in Kowloon Tong Developinent Area was in progress. Kerbing, channelling and macadamising roads on the Kowloon Tong Estate was completed, the total length of new roads being 3 miles. New Territories.-Patrol Path from Lin Ma Hang to Sha Tau Kok, Widening Path from Sheung Shui to Ta Ku Ling, Access and Patrol Path to Lo Wu Railway Station Block House, Widening road between Fanling and Sha Tau Kok were in progress. DRAINAGE. Hong Kong. The reconstruction reconstruction of Wongneichong Nullah, Section No. 4 (in front of Jockey Club Stands) was completed in October. New sewers and storm water drains, including sewers on the Praya East Reclamation, were constructed to a length of 18,064 feet. Existing drains in the Wanchai district were reconstructed to a length of 2,786 feet. : Stream-courses were trained to a length of 1,897 feet. Kowloon.-New sewers and storm water drains were constructed to a length of 22,261 feet. Trenches were cut in connection with the anti-malarial campaign. New Kowloon.-New sewers and storm water drains were con- structed to a length of 7,202 feet. Anti-malarial work was continued.
2026-05-09 01:07:16 · Baseline
View content

18

Two Bridle Tracks 9 miles in length were constructed during the year:-

(1) on the South side of the Island, between Wanchai Gap and

the road from Wongneichong Gap-Little Hong Kong.

(2) on the North side of the Island, between Wongneichong

Gap and Mount Parker Road.

completed.

Kowloon.-Argyle Street Extension to a width of 60 feet was Chatham Road Extension and Boundary Street, (section from Nathan Road to No. 8 Railway Bridge) were in course of construction.

Portions of new roads, an aggregate of 1 mile, were macadamized, kerbed and channeled adjoining new buildings erected during the course of the year.

New Kowloon. In the widening of Castle Peak Road, half width of the roadway was completed. Extension of Roads in Kowloon Tong Developinent Area was in progress.

Kerbing, channelling and macadamising roads on the Kowloon Tong Estate was completed, the total length of new roads being 3 miles.

New Territories.-Patrol Path from Lin Ma Hang to Sha Tau Kok, Widening Path from Sheung Shui to Ta Ku Ling, Access and Patrol Path to Lo Wu Railway Station Block House, Widening road between Fanling and Sha Tau Kok were in progress.

DRAINAGE.

Hong Kong. The reconstruction

reconstruction of Wongneichong Nullah, Section No. 4 (in front of Jockey Club Stands) was completed in October.

New sewers and storm water drains, including sewers on the Praya East Reclamation, were constructed to a length of 18,064 feet. Existing drains in the Wanchai district were reconstructed to a length of 2,786 feet.

:

Stream-courses were trained to a length of 1,897 feet.

Kowloon.-New sewers and storm water drains were constructed to a length of 22,261 feet.

Trenches were cut in connection with the anti-malarial campaign.

New Kowloon.-New sewers and storm water drains were con- structed to a length of 7,202 feet.

Anti-malarial work was continued.