S 37
COST ASSIGNMENTS AND STATISTICS.
PART I-ASSIGNMENTS OF OPERATING EXPENSES.
Main Heads. Total amount for the year. Cost for mileage operated. Cost per train mile. Main Line $ General Expenses 73,140.52 112,118.71 5,152.28 .38 Traffic Expenses 76,270.90 77,824.23 3,576.48 .23 Running Expenses 229,029.97 279,956.19 12,865.65 .96 Maintenance of Equipment 221,902.07 231,755.80 10,659.59 .79 Maintenance of Way and Structures. 99,509.33 92,351.82 4,244.1 .32 Fanling Branch Line, Running Expenses 9,344.60 2,663.30 867.35 Maintenance of Equipment 3,032.53 489.81 67.56 Maintenance of Way and Structures. 3,539.49 3,797.98 523.86 715,769.41 800,954.17 37,447.38Previous year.
PART II-COST FOR RUNNING LOCOMOTIVES.
(Main Line Only).
Current year. Previous year. Current year. Previous year. 1 Total cost of coal $ $ 5 Total weight of coal Tons Tons 169,302.93 211,598.27 13,997.55 11,225.90 2 Average cost per ton $ $ 6 Weight per train mile lbs. lbs. 12.11 15.08 107.25 111.87 3 Cost per train mile 7 Weight per engine mile lbs. lbs. .723 .753 65.55 .441 4 Cost per engine mile .468 .468 69.47S 37
COST ASSIGNMENTS AND STATISTICS.
PART I-ASSIGNMENTS OF OPERATING EXPENSES.
Previous year,
Main Heads.
Total amount for the year.
Cost for mileage operated.
1
Cost per train mile.
5
333
0.
Main Line
$
6.
G.
c.
73.140.52
General Expenses
112.118.71
5 152.28
.38
76.270.90
Traffic Expenses -
77.824.23
3.576.48
.23
229.029.97
Running Expenses
279.956.19
12,865.65
.96
221,902.07
Maintenance of Equioment
231.755.80
10,659,59
.79
99,509.33
Maintenance of Way and Stra tures.
92.351.82
4.244.1:
32
Fanling Branch Line,
9,344 60
Running Expenses
2.663 30
867.35
:
3,032 53
Maintenance of Equipment
489.81
67.56
3,539.49
Maintenance of Way and Structures.
3 797.98
523 86
715,769 41
800,954,17
37.447.38
Previous year.
PART II-COST FOR RUNNING LOCOMOTIVES.
(Main Line Only).
Current
year.
Previous
year.
2
3
5
Current
year.
6
G.
169,302.93
1 Total cost of coal
7.
('.
G.
211 598.27
11.225.90
5 Total weight of coal
Tous
13,997.55
15.08
2 Average cost per ton -
1511
111.87
6 Weight per train mile
lbs.
107.25
-
753
3 Cost per train mile
.723
65,55
.441
Cost per engine, mile-
468
7 Weight per engine mile
Ibs.
69.47
No comments yet.
Private notes are available after approval.