P.W.E. Kowloon,
68
The number of drain connections was 163.
Many new gullies with flat gully gratings were constructed and connected to the stormwater drainage system.
Estimates,
$50,000.00
Supplementary Vote,
4,600.00
$54,600.00
Expenditure, (from Government Funds),
$43,946.64
Expenditure, (contributions by various lessees),
613.60
$44,560.24
144. Miscellaneous.-The following is a brief description of the principal work carried out under this heading :-
1. The erection of a temporary timber Examination Shed and office for the examination of dutiable goods at Kowloon Point.
2. The conversion of an old Stable at the Kowloon Disinfecting Station into Quarters for Scavenging Coolies together with the erection of a detached Kitchen for use with the Quarters.
Five heating points installed.
Estimates, Sup. Vote,
Expenditure,
145. Waterworks :—
$5,000.00 10,000.00
$15,000.00
$12,360.74
(a.) Pedestal Hydrants-14 new Pedestal Hydrants were fixed including 4 in Kowloon Tong Estate.
(b.) Minor Extensions to Mains-The following mains were laid-
800 feet of 6″ main in Mong Kok Road.
400 feet of 4" main in Sai Yueng Choi Street.
300 feet of 4" main in Portland Street.
260 feet of 4" main in Reclamation Street.
(c.) Purchase of Lighting Set-The old set having become worn out, a new Electric Lighting Set for the Kowloon Reservoir Bungalow was purchased at a cost of $280.00.
Estimates, Expenditure,
$8,000.00 $5,565.56
P.W.E. Kowloon,
68
The number of drain connections was 163.
Many new gullies with flat gully gratings were constructed and connected to the stormwater drainage system.
Estimates,
$50,000.00
Supplementary Vote,
4,600.00
$54,600.00
Expenditure, (from Gov-
ernment Funds),
$43,946.64
Expenditure, (contributions
by various lessees),
613.60
$44,560.24
144. Miscellaneous.-The following is a brief description of the principal work carried out under this heading :-
1. The erection of a temporary timber Examination Shed and office for the examination of dutiable goods at Kowloon Point.
2. The conversion of an old Stable at the Kowloon Disinfecting Station into Quarters for Scaveng- ing Coolies together with the erection of a detached Kitchen for use with the Quarters.
Five heating points installed.
Estimates, Sup. Vote,
Expenditure,
145. Waterworks :—
$ 5,000.00 10,000.00
$15,000.00
$12,360.74
(a.) Pedestal Hydrants-14 new Pedestal Hydrants
were fixed including 4 in Kowloon Tong Estate. (b.) Minor Extensions to Mains-The following mains
were laid-
800 feet of 6′′ main in Mong Kok Road.
400 feet of 4" main in Sai Yueng Choi Street. 300 feet of 4" main in Portland Street.
260 feet of 4" main in Reclamation Street.
(c.) Purchase of Lighting Set-The old set having be- come worn out, a new Electric Lighting Set for the Kowloon Reservoir Bungalow was purchased at a cost of $280.00.
Estimates, Expenditure,
$8,000.00 $5,565.56