P.W.E. Hong Kong.
58
(h.) Overseers Quarters. It was decided not to erect these for the present.
The following quantities were used in the work:--
Soft Excavation 82,762 cubic yards.
Rock Excavation 16,832 "
Filling (Earth) 12,750 "
Cement Concrete 1:2:4 5,564 "
"" 1:3:5 7,161 "
1:2:4 R.C. 1,806 "
Lime and Cement Concrete 1,061 "
Lime Concrete 71 "
Lime & Cement Concrete surfacing of Paths and Access Road 237 "
Ashlar Masonry 17 "
Reinforcement (Steel) 93 Tons.
Turfing 1,928 squares.
3" Drain Pipes 1,965 Lineal yds.
4" Drain Pipes 286 "
6" Drain Pipes 513 "
Drainage Channels 2,889 "
The following are the lengths of Permanent C.I. Water Mains laid-
18" 5,360 lineal feet
15′′ 90 "
12" 600 "
10′′ 79 "
8" 360 "
6" 23 "
45 "
31 "
720 "
17 "
39 "
11 "
1928 Estimates, $25,000.00 Total Estimates, $575,000.00
1928 Sup. Vote, 15,000.00
Expenditure up to 31.12.28, $537,861.85
1928 Expenditure, $39,521.05
128. Water Supply to Aplichau.-This work was referred to in paragraph 127 of last year's Report.
The work comprised the laying of a 2" Steel flanged main on the bed of Aberdeen Harbour to convey water from the 3′′ main on the Island Road at Aberdeen to Aplichau Island.
Special flanged W.I. Pipes of 2" internal diameter in lengths of 20 feet were joined up on shore into sections 140 feet long, at one end of which a special ball and socket joint was fixed to take up the inequalities of the harbour bottom. These 140 feet sections were floated out into position attached to sampans, joined up on the surface, and lowered to the bottom, section by section, an examination of the pipe when laid being made by a diver. The length of this section was 540 feet.
P.W.E. Hong Kong.
58
(h.) Overseers Quarters. It was decided not to erect these for the present.
The following quantities were used in the work:--
Soft Excavation
Rock
12
Filling (Earth)
Cement Concrete 1:2:4
""
""
82,762 cubic yards.
16,832 12,750
"
37
""
5,564
"
""
1:3:5
7,161
1:2:4 R.C........
1,806
10
1,061
71
237 **
17
Lime and Cement Concrete
Lime Concrete
Lime & Cement Concrete surfacing
of Paths and Access Road
Ashlar Masonry
Reinforcement (Steel)
Turfing
3" Drain Pipes
2,112 square yds.
3,002 cubic feet.
93 Tons.
1,928 squares.
1,965 Lineal yds.
4"
??
>>
6"
"}
Drainage Channels
286
513
"
2,889
1
21
The following are the lengths of Permanent C.I. Water Mains laid-
18"
15′′
10′′
எதகம்
12"
8"
6"
5,360 lineal feet
•
90 600
79
360
23
45 31 720 17
39
11
1928 Estimates,
1928 Sup. Vote,
$25,000.00 Total Estimates, . $575,000.00
15,000.00
Expenditure up
$40,000.00
to 31.12.28, $537,861.85
·
1928 Expenditure, . $39,521.05
128. Water Supply to Aplichau.-This work was referred to in paragraph 127 of last year's Report.
The work comprised the laying of a 2" Steel flanged main on the bed of Aberdeen Harbour to convey water from the 3′′ main on the Island Road at Aberdeen to Aplichau Island.
Special flanged W.I. Pipes of 2" internal diameter in lengths of 20 feet were joined up on shore into sections 140 feet long, at one end of which a special ball and socket joint was fixed to take up the inequalities of the harbour bottom. These 140 feet sections were floated out into position attached to sampans, joined up on the surface, and lowered to the bottom, section by section, an examination of the pipe when laid being made by a diver. The length of this section was 540 feet.