26
RAILWAY.
The new Carpenter's Shop mentioned in last year's Annual Report was completed early in the year, and a siding from the yard laid into it.
The steelwork for the Extension to the Workshops arrived in June and the building was proceeded with at once and good progress made.
Owing to extensive development in the neighbourhood, it was decided to complete Bridge No. 4 situated at the second mile. This bridge spans a 100-foot main road on the skew and was designed to give a 60 feet clear span and two sidespans to provide for causeways of 10 to 15 feet each. The steelwork was ordered for double track, but only that for the main span arrived in time for the opening of the Railway. The sidespans (comprising four 45 feet single line spans) which had been lying in store for twelve years, were reconditioned and two were erected by the end of the year, and the line diverted over them. The remaining spans will be erected and the bridge completed in 1925.
The building of the two blocks of quarters for the Traffic Staff at Blackhead's Point mentioned in last year's Report was proceeded with, but not quite completed by the end of the year. They were ready for occupation by March 1st this year.
The roof of one of the buildings taken over from the China Light & Power Company and used as a motor repair shop, was condemned and arrangements made for a new steel roof with northern lights to replace it. The old roof which leaked badly was unsafe in typhoon weather and was irreparable. This work was given to a local engineering firm and is expected to be completed early in 1925.
A siding was laid from Kowloon Station across the circulating area in front, to connect with the Hongkong and Kowloon Wharf and Godown Company's premises. The siding, which is 273 feet long to the Company's boundary, is laid on concrete with two guard rails. An agreement was entered into with the Company regarding its cost and use.
In connection with the Harbour Improvements, it became necessary to alter the position of the submarine cables crossing to Kowloon, and four cable houses were built in the Kowloon Station south verandah to receive the terminals of the cables belonging to the Eastern Extension Telegraph Company, the China and Japan Telephone & Electric Company, the Military Authorities, and the Government. Permission was granted the Eastern Extension Telegraph Company to connect their cable with aerial lines over Railway lands onto their existing poles to Canton which follow the Railway from Mile 14.
26
RAILWAY.
The new Carpenter's Shop mentioned in last year's Annual Report was completed early in the year, and a siding from the yard laid into it.
The steelwork for the Extension to the Workshops arrived in June and the building was proceeded with at once and good pro- gress made.
Owing to extensive devolpment in the neighbourhood, it was decided to complete Bridge No. 4 situated at the second mile. This bridge spans a 100-foot main road on the skew and was designed to give a 60 feet clear span and two sidespans to provide for cause- ways of 10 to 15 feet each. The steelwork was ordered for double track, but only that for the main span arrived in time for the opening of the Railway. The sidespans (comprising four 45 feet single line spans) which had been lying in store for twelve years, were reconditioned and two were erected by the end of the year, and the line diverted over them. The remaining spans will be erected and the bridge completed in 1925,
The building of the two blocks of quarters for the Traffic Staff at Blackhead's Point mentioned in last year's Report was proceeded with, but not quite completed by the end of the year. They were ready for occupation by March 1st this year.
The roof of one of the buildings taken over from the China Light & Power Company and used as a motor repair shop, was con- demned and arrangements made for a new steel roof with northern lights to replace it. The old roof which leaked badly was unsafe in typhoon weather and was irreparable. This work was given to a local engineering firm and is expected to be completed early in 1925.
A siding was laid from Kowloon Station across the circulating area in front, to connect with the Hongkong and Kowloon Wharf and Godown Company's premises. The siding, which is 273 feet long to the Company's boundary, is laid on concrete with two guard rails. An agreement was entered into with the Company regarding its cost and use.
In connection with the Harbour Improvements, it became necessary to alter the position of the submarine cables crossing to Kowloon, and four cable houses were built in the Kowloon Station south verandah to receive the terminals of the cables belonging to the Eastern Extension Telegraph Company, the China and Japan Telephone & Electric Company, the Military Authorities, and the Government. Permission was granted the Eastern Extension Telegraph Company to connect their cable with aerial lines over Railway lands onto their existing poles to Canton which follow the Railway from Mile 14.