P.W.E. Hongkong.
86
1923 Estimates, $10,000.00
1923 Expenditure (from Government funds) $10,258.94
1923 Expenditure (contributions by various lessees), $3,000.00 $13,258.94
122. Miscellaneous Drainage Works:-
(a). Extending existing outfall from below Wanchai Gap to the sea at a point near Aberdeen.—This work, referred to in paragraph 108 (a) of the 1922 Report, was practically completed at the end of the year.
1923 Estimates, $11,000.00
1923 Sup. Vote, $39,118.17 $50,118.17
$48,189.41 1923 Expenditure,
(b). Laying sewer in connection with Conduit & Hatton Roads Development Scheme.—This work was not proceeded with during the year; there was consequently no expenditure under this heading.
(c). Extending sewer from Bowen Road to Wanchai Gap.— This work was completed during the year.
1923 Estimates, $15,000.00
1923 Expenditure, $8,779.59
The total length laid was 4,737'6".
(d). Shaukiwan Road, Laying drain in connection with North Point Foreshore Development.—This work was commenced late in the year.
1923 Estimates, $6,000.00
1923 Expenditure, $1,155.15
P.W.E. Hongkong.
86
1923 Estimates,
$10,000.00
1923 Expenditure (from Government
funds)
$ 10,258.94
1923 Expenditure (contributions by
various lessees),
3,000.00
$13,258.94
122. Miscellaneous Drainage Works:-
(a). Extending existing outfall from below Wanchai Gap to the sea at a point near Aberdeen.—This work, referred to in paragraph 108 (a) of the 1922 Report, was practically completed at the end of the year.
1923 Estimates,
$11,000.00
1923 Sup. Vote,
39,118.17
$50,118.17
$48,189.41
1923 Expenditure,
(b). Laying sewer in connection with Conduit & Hatton Roads Developmeni Scheme.—This work was not proceeded with during the year; there was consequently no expenditure under this heading.
(e). Extending sewer from Bowen Road to Wanchai Gap.— This work was completed during the year.
1923 Estimates,
1923 Expenditure,
The total length laid was 4,737'6".
$15,000.00
$ 8,779.59
(d). Shaukiwan Road, Laying drain in connection with North Point Foreshore Development.—This work was commenced late in
the year.
1923 Estimates,
$6,000.00
1923 Expenditure,
$1,155.15