AnnualReport-1922 — Page 620

Administrative Reports 行政報告書 All AI Reviewed

P.W.E. Kowloon.

Q 92

The number of drain connections was 109.

1922 Estimates 1922 Expenditure (from Government funds) 1922 Expenditure (contributions by various lessees) $30,000.00 $22,718.69 $2,392.64 $25,111.33

In conjunction with the Roads Office, a considerable number of new gullies were constructed and connected to the storm-water drainage system.

161. Extension of Lighting.---40 lamps were erected during the year in the Kowloon and Shamshuipo Districts, 31 Electric and 9 Gas.

1922 Estimates 1922 Expenditure $1,500.00 $1,238.29

162. Alterations of Electric Lighting,—New Standards.—This was referred to in paragraph 144 of last year's Report. The re-arrangement of the street lighting being still under consideration, this work was not proceeded with.

1922 Estimates 1922 Expenditure $10,000.00 Nil

163. Filling in Tidal Flat and cutting down hill between Taikoktsui and Fuk Tsun Heung,-Good progress was made with this work which was referred to in paragraph 145 of last year's Report.

The work of dredging trenches for the nullah rubble mound foundations was completed except for a length of 100 lineal yards; the nullah walls and invert were completed between Shanghai Street and Ivy Street; the re-inforced concrete bridge over nullah at Shanghai Street was well in hand at the end of the year.

The dredging of the sea-wall trench was completed, and 5,500 cubic yards of pell mell rubble deposited for foundations. 186,000 cubic yards of filling material were deposited on the reclamation area during the year, and the concrete blocks were cast for foundations to sea-wall.

1922 Estimates $60,000.00 Total Estimates $326,000.00 1922 Sup. Vote $8,000.00 Expenditure to 31/12/22 $102,942.26 1922 Expenditure $67,763.56 $68,000.00

164. Furniture for Government Offices and Quarters.—Six full sets of furniture were supplied and a quantity of small items to various Quarters and Police Stations.

1922 Estimates $10,000.00 1922 Expenditure $8,648.20

Edit History

2026-05-07 03:19:23 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P.W.E. Kowloon. Q 92 The number of drain connections was 109. 1922 Estimates 1922 Expenditure (from Government funds) 1922 Expenditure (contributions by various lessees) $30,000.00 $22,718.69 $2,392.64 $25,111.33 In conjunction with the Roads Office, a considerable number of new gullies were constructed and connected to the storm-water drainage system. 161. Extension of Lighting.---40 lamps were erected during the year in the Kowloon and Shamshuipo Districts, 31 Electric and 9 Gas. 1922 Estimates 1922 Expenditure $1,500.00 $1,238.29 162. Alterations of Electric Lighting,—New Standards.—This was referred to in paragraph 144 of last year's Report. The re-arrangement of the street lighting being still under consideration, this work was not proceeded with. 1922 Estimates 1922 Expenditure $10,000.00 Nil 163. Filling in Tidal Flat and cutting down hill between Taikoktsui and Fuk Tsun Heung,-Good progress was made with this work which was referred to in paragraph 145 of last year's Report. The work of dredging trenches for the nullah rubble mound foundations was completed except for a length of 100 lineal yards; the nullah walls and invert were completed between Shanghai Street and Ivy Street; the re-inforced concrete bridge over nullah at Shanghai Street was well in hand at the end of the year. The dredging of the sea-wall trench was completed, and 5,500 cubic yards of pell mell rubble deposited for foundations. 186,000 cubic yards of filling material were deposited on the reclamation area during the year, and the concrete blocks were cast for foundations to sea-wall. 1922 Estimates $60,000.00 Total Estimates $326,000.00 1922 Sup. Vote $8,000.00 Expenditure to 31/12/22 $102,942.26 1922 Expenditure $67,763.56 $68,000.00 164. Furniture for Government Offices and Quarters.—Six full sets of furniture were supplied and a quantity of small items to various Quarters and Police Stations. 1922 Estimates $10,000.00 1922 Expenditure $8,648.20
Baseline (Original)
P.W.E. Kowloon. Q 92 The number of drain connections was 109. 1922 Estimates, 1922 Expenditure (from Govern- 1922 Expenditure (contributions ment funds), by various lessees) $30.000.00 $22,718.69 2,392.64 $25,111.33 In conjunction with the Roads Office, a considerable number of new gullies were constructed and connected to the storm-water drainage system. 161. Ertension of Lighting.---40 lamps were erected during the year in the Kowloon and Shamshuipo Districts, 31 Electric and 9 Gas. 1922 Estimates, 1922 Expenditure, $1,500.00 1,238.29 162. Alterations of Electric Lighting,—New Standards.—This was referred to in paragraph 144 of last year's Report. The re-arrangement of the street lighting being still under considera- tion, this work was not proceeded with. 1922 Estimates, 1922 Expenditure,... $10,000.00 Nil. 163. Filling in Tidal Flat and cutting down hill between Taikoktsui aud Fuk Tsun Heung,-Good progress was made with this work which was referred to in paragraph 145 of last year's Report. The work of dredging trenches for the nullah rubble mound foundations was completed except for a length of 100 lineal yards; the nullah walls and invert were completed between Shang- hai Street and Ivy Street; the re-inforced concrete bridge over nullah at Shanghai Street was well in hand at the end of the year. The dredging of the sea-wall trench was completed, and 5,500 cubic yards of pell mell rubble deposited for foundations. 186,000 cubic yards of filling material were deposited on the reclamation area during the year, and the concrete blocks were cast for foundations to sea-wall. 1922 Estimates, $60,000.00 | Total Estimates, $326.000.00 1922 Sup. Vote, 8,000.00 1922 Expenditure, $68,000.00 | Expenditure to 67,763.56 31/12, 22,...... 102,942.26 184. Furniture for Government Offices and Quarters.—Six full sets of furniture were supplied and a quantity of small items to various Quarters and Police Stations. 1922 Estimates, ...... $10,000.00 8,648,20 1922 Expenditure,...................................
2026-05-07 03:19:23 · Baseline
View content

P.W.E. Kowloon.

Q 92

The number of drain connections was 109.

1922 Estimates,

1922 Expenditure (from Govern-

1922 Expenditure (contributions

ment funds),

by various lessees)

$30.000.00

$22,718.69

2,392.64

$25,111.33

In conjunction with the Roads Office, a considerable number of new gullies were constructed and connected to the storm-water drainage system.

161. Ertension of Lighting.---40 lamps were erected during the year in the Kowloon and Shamshuipo Districts, 31 Electric and 9 Gas.

1922 Estimates,

1922 Expenditure,

$1,500.00 1,238.29

162. Alterations of Electric Lighting,—New Standards.—This was referred to in paragraph 144 of last year's Report. The re-arrangement of the street lighting being still under considera- tion, this work was not proceeded with.

1922 Estimates,

1922 Expenditure,...

$10,000.00

Nil.

163. Filling in Tidal Flat and cutting down hill between Taikoktsui aud Fuk Tsun Heung,-Good progress was made with this work which was referred to in paragraph 145 of last year's Report.

The work of dredging trenches for the nullah rubble mound foundations was completed except for a length of 100 lineal yards; the nullah walls and invert were completed between Shang- hai Street and Ivy Street; the re-inforced concrete bridge over nullah at Shanghai Street was well in hand at the end of the year.

The dredging of the sea-wall trench was completed, and 5,500 cubic yards of pell mell rubble deposited for foundations. 186,000 cubic yards of filling material were deposited on the reclamation area during the year, and the concrete blocks were cast for foundations to sea-wall.

1922 Estimates, $60,000.00 | Total Estimates, $326.000.00 1922 Sup. Vote,

8,000.00

1922 Expenditure,

$68,000.00 | Expenditure to

67,763.56 31/12, 22,......

102,942.26

184. Furniture for Government Offices and Quarters.—Six full sets of furniture were supplied and a quantity of small items to various Quarters and Police Stations.

1922 Estimates,

......

$10,000.00 8,648,20

1922 Expenditure,...................................

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.