P.W.E. Hongkong.

(v.) Road 20 feet wide, skirting North side of Hills from Wanchai Gap to Magazine Gap.—The connection to the Craigmin Road referred to in paragraph 101 (j) was made by the end of September, the corner below R.B.L. 37 being cut back and the approach path to Forebank East and West realigned and graded. A short section of it was surfaced with a coating of 4" Tar Macadam.

1922 Estimates, ... $12,000.00 Total Estimates, ... $76,000.00

1922 Sup. vote $12,000.00 1922 Expenditure $24,000.00 Expenditure to 31/12/22 $21,127.03 $85,916.91

(p.) Road connecting Broadwood Road with Wongneichong Gap Road.—This work was put in hand late in the year. Cutting was commenced at the junction of Wongneichong Gap Road, the excavated material being utilized to bring to formation level the proposed road on the West side of Wongneichong Village leading from the Wongneichong Road to the Jewish Cemetery.

1922 Estimates $10,000.00 1922 Expenditure $5,045.34

(4.) Queen's Road East, Widening to 60'.—This was referred to in paragraph 101 (d) of last year's Report.

Certain compensations and resumptions were completed during the year, particulars of which are given in the schedule on page 25 of this Report, but were not sufficiently advanced as a whole to admit of much progress being made with road widening.

1922 Estimates $10,000.00 Total Estimates $30,000.00 1922 Sup. Vote $20,000.00 Expenditure to 31/12/22 $22,938.87 $322,938.87 1922 Expenditure $30,000.00

(r.) Kennedy Road Improvements.—This was referred to in paragraph 101 (f) of last year's Report.

That portion of this road immediately West of the Magazine was diverted and formed to a minimum width of 25 feet.

The No. 1 Bridge, near the junction with Garden Road, was widened to 30 feet and the carriageway made up and surfaced with sand carpeting.

1922 Estimates $10,000.00 1922 Expenditure $9,926.46

• The cost of this was met from the Vote, P.W.E. 7.—“Improvements to Roads Clanside City."

Edit History

2026-05-07 03:15:39 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
P.W.E. Hongkong. (v.) Road 20 feet wide, skirting North side of Hills from Wanchai Gap to Magazine Gap.—The connection to the Craigmin Road referred to in paragraph 101 (j) was made by the end of September, the corner below R.B.L. 37 being cut back and the approach path to Forebank East and West realigned and graded. A short section of it was surfaced with a coating of 4" Tar Macadam. 1922 Estimates, ... $12,000.00 Total Estimates, ... $76,000.00 1922 Sup. vote $12,000.00 1922 Expenditure $24,000.00 Expenditure to 31/12/22 $21,127.03 $85,916.91 (p.) Road connecting Broadwood Road with Wongneichong Gap Road.—This work was put in hand late in the year. Cutting was commenced at the junction of Wongneichong Gap Road, the excavated material being utilized to bring to formation level the proposed road on the West side of Wongneichong Village leading from the Wongneichong Road to the Jewish Cemetery. 1922 Estimates $10,000.00 1922 Expenditure $5,045.34 (4.) Queen's Road East, Widening to 60'.—This was referred to in paragraph 101 (d) of last year's Report. Certain compensations and resumptions were completed during the year, particulars of which are given in the schedule on page 25 of this Report, but were not sufficiently advanced as a whole to admit of much progress being made with road widening. 1922 Estimates $10,000.00 Total Estimates $30,000.00 1922 Sup. Vote $20,000.00 Expenditure to 31/12/22 $22,938.87 $322,938.87 1922 Expenditure $30,000.00 (r.) Kennedy Road Improvements.—This was referred to in paragraph 101 (f) of last year's Report. That portion of this road immediately West of the Magazine was diverted and formed to a minimum width of 25 feet. The No. 1 Bridge, near the junction with Garden Road, was widened to 30 feet and the carriageway made up and surfaced with sand carpeting. 1922 Estimates $10,000.00 1922 Expenditure $9,926.46 The cost of this was met from the Vote, P.W.E. 7.—“Improvements to Roads Clanside City."
Baseline (Original)
65 P.W.E. Hongkong. (v.) Road 20 feet wide, skirting North side of Hills from Wanchai Gap to Magazine Gap.—The connection to the Craigmin Road referred to in paragraph 101 (j) was made by the end of September, the corner below R.B.L. 37 being cut back and the approach path to Forebank East and West realigned and graded. A short section of it was surfaced with a coating of 4" Tar Macadam. * 1922 Estimates, ... 12,000.00 Total Estimates, ...$ 76,000.00 .$ | 1922 Sup, vote, 12,000.00 1922 Expenditure, $24,000.00 | Expenditure to 21,127.03 31/12/22, 85,916.91 (p.) Road connecting Broadwood Road with Wongneichong Gap Road-This work was put in hand late in the year. Cutting was commenced at the junction of Wongneichong Gap Road, the excavated material being utilized to bring to formation level the proposed road on the West side of Wongueichong Village leading From the Wongneichong Road to the Jewish Cemetery. 1922 Estimates, 1922 Expenditure, $10,000.00 5,045.34 (4.) Queen's Road East, Widening to 60'.-This was referred to in paragraph 101 (d) of last year's Report. Certain compensations and resumptions were completed during the year, particulars of which are given in the schedule on page 25 of this Report, but were not sufficiently advanced as a whole to admit of much progress being made with road widening. 1922 Estimates, ...$ 10,000.00 | Total Estimates, 1922 Sup. Vote, 20,000.00 ... 1922 Expenditure, $30,000.00 Expenditure to 22.938.87 31/12/22, $322,938.87 (r.) Kennedy Road Improvements.-This was referred to in paragraph 101 (ƒ) of last year's Report. That portion of this road immediately West of the Magazine was diverted and formed to a minimum width of 25 feet. The No. 1 Bridge, near the junction with Garden Road, was widened to 30 feet and the carriageway made up and surfaced with sand carpeting. 1922 Estimates, 1922 Expenditure, $10,000.00 9,926.46 The cost of this was met from the Vote, P.W.E. 7.—“ Improvements to Roads Clanside City."
2026-05-07 03:15:39 · Baseline
View content

65

P.W.E. Hongkong.

(v.) Road 20 feet wide, skirting North side of Hills from Wanchai Gap to Magazine Gap.—The connection to the Craigmin Road referred to in paragraph 101 (j) was made by the end of September, the corner below R.B.L. 37 being cut back and the approach path to Forebank East and West realigned and graded. A short section of it was surfaced with a coating of 4" Tar Macadam.

*

1922 Estimates, ... 12,000.00 Total Estimates, ...$ 76,000.00

.$ | 1922 Sup, vote, 12,000.00

1922 Expenditure,

$24,000.00 | Expenditure to

21,127.03

31/12/22,

85,916.91

(p.) Road connecting Broadwood Road with Wongneichong Gap Road-This work was put in hand late in the year. Cutting was commenced at the junction of Wongneichong Gap Road, the excavated material being utilized to bring to formation level the proposed road on the West side of Wongueichong Village leading From the Wongneichong Road to the Jewish Cemetery.

1922 Estimates,

1922 Expenditure,

$10,000.00 5,045.34

(4.) Queen's Road East, Widening to 60'.-This was referred to in paragraph 101 (d) of last year's Report.

Certain compensations and resumptions were completed during the year, particulars of which are given in the schedule on page 25 of this Report, but were not sufficiently advanced as a whole to admit of much progress being made with road widening.

1922 Estimates, ...$ 10,000.00 | Total Estimates,

1922 Sup. Vote, 20,000.00

...

1922 Expenditure,

$30,000.00 Expenditure to

22.938.87 31/12/22,

$322,938.87

(r.) Kennedy Road Improvements.-This was referred to in paragraph 101 (ƒ) of last year's Report.

That portion of this road immediately West of the Magazine was diverted and formed to a minimum width of 25 feet.

The No. 1 Bridge, near the junction with Garden Road, was widened to 30 feet and the carriageway made up and surfaced with sand carpeting.

1922 Estimates,

1922 Expenditure,

$10,000.00 9,926.46

• The cost of this was met from the Vote, P.W.E. 7.—“ Improvements to Roads Clanside City."