P.W.E. Hongkong.
56
sewer in scavenging lane of S.I.L's. 452 and 458; 6" sewer in scavenging lane of S.I.L. 451; 6" sewer in scavenging lane of S.I.L. 454; 9" sewer to new lots east of Repulse Bay (incomplete): 9" sewer to L.L. 2293, Wongneichong; 6" sewer from May Road Station to I.L's. 2308, 2309 and 2310, Magazine Gap Road (incomplete); 6" sewer in scavenging lane of S.I.L. 450; 6" sewer in scavenging lane of S.I.L. 444; 9" sewer to I.L's. 1619 and 1620, Shaukiwau Road; 6" sewer from R.B.L. 163 in the direction of Deep Water Bay; 6" sewer from Sands Street to M.L. 239, Kennedy Town; 6" sewer to I.L. 2280, Wanchai Gap Road; 6" sewer in Eastern Street to New Government Latrine; 12" storm-water drains from Smithfield to M.L. 245; 9" storm-water drain to I.L. 1619, Shaukiwan Road; 12" storm-water drain from Hospital Road to Pound Lane; and the extension of the existing Infectious Diseases Hospital sewer at Kennedy Town from Victoria Road to low water.
The number of drain connections made was 91.
1921 Estimates,
1921 Expenditure (From Government funds),... $24,136.51
1921 Expenditure (contributions by various lessees), $5,817.81
$25,000.00
$29,954.32
In conjunction with the Roads Office, a considerable number of new gullies with flat gully gratings were constructed and connected to the storm-water drainage system.
105. Extensions of Lighting.—25 lamps were erected during year-16 electric and 9 gas,
1921 Estimates.. $1,500.00
1921 Expenditure, $1,290.00
106. Shaukiwan Village Improvements.—It was not found possible to proceed with this work; there was consequently no expenditure under this heading.
107. Reconstruction of Ferry Piers:
Pier opposite Queen Victoria Street.-The Contract for the supply of iron and steel work referred to in paragraph 106 of last year's Report was awarded to Messrs. Kuen Hung whose tender amounted to $4,377.60. The Contract documents were signed on the 26th January and the materials were delivered within the Contract time of 3 months, the actual cost amounting to $4,195.10.
The work of construction which should have been completed on the 20th March, was actually completed on the 2nd October, 1921. Unfortunately,
P.W.E. Hongkong.
56
sewer in scavenging lane of S.I.L's. 452 and 458; 6" sewer in scavenging lane of S.I.L. 451; 6" sewer in scavenging lane of S.I.L. 454; 9" sewer to new lots east of Repulse Bay (incomplete): 9" sewer to L.L. 2293, Wongneichong; 6" sewer from May Road Station to I.'s. 2308, 2309 and 2310, Magazine Gap Road (incomplete); 6" sewer in scavenging lane of S.I.L. 450; 6 sewer in scavenging lane of S.I.L. 444; 9" sewer to I.L's. 1619 and 1620, Shaukiwau Road; 67 sewer from R.B.L. 163 in the direction of Deep Water Bay; 6" sewer from Sands Street to M.L. 239, Kennedy Town; 67 sewer to I.L. 2280, Wanchai Gap Road 6" sewer in Eastern Street to New Government Latrine; 12′′ storm-water drains from Smithfield to M.L. 245; 9" storm-water drain to I.L. 1619, Shaukiwan Road; 12" storm-water drain from Hospital Road to Pound Lane; and the extension of the existing Infectious Diseases Hospital sewer at Kennedy Town from Victoria Road to low water.
The number of drain connections made was 91.
1921 Estimates,
1921 Expenditure (From
Government funds),... $24,136.51
1921 Expenditure (contri-
butions by various
lesseos),
$25,000.00
5,817.81
$29.954.32
In conjunction with the Roads Office, a considerable number of new gullies with flat gully gratings were constructed and connected to the storm-water drainage system.
the
105. Extensions of Lighting.—25 lamps were erected during year-16 electric and 9 gas,
1921 Estimates..
1921 Expenditure,
$1,500.00 1,290.00
106. Shankiwan Village Improvements.—It was not found possible to proceed with this work; there was consequently no expenditure under this heading.
107. Reconstruction of Ferry Piers :~-
Pier opposite Queen Victoria Street.-The Contract for the supply of iron and steel work referred to in paragraph 106 of last year's Report was awarded to Messrs. Kuen Hung whose tender amounted to $4,377.60. The Contract documents were signed on the 26th January and the materials were deliver- ed within the Contract time of 3 months, the actual cost amounting to $4,195.10.
The work of construction which should have been com- pleted on the 20th March, was actually com- pleted on the 2nd October, 1921. Unfortunately.