P.W.E. Hongkong.

(c) Trough closet, (4 seats and 1 trough urinal), at Peak Road on site of old latrine.

(d) Trough closet, underground, (2 seats and 1 trough urinal), at junction of Bonham Road with Eastern Street.

(e) The conversion to a trough closet, (42 seats and 2 trough urinals), of the latrine at Wing Fung Street.

These conveniences are all of the standard improved type. By the end of the year the work was well in hand with the exception of (e) which was delayed, owing to the necessity of having to demolish the existing brickwork which was found to be in poor condition.

1921 Estimates, $20,000.00 Total Estimates,

1921 Expenditure,

Expenditure to 31/12/21 $5,685.12 $5,685.12

101. Roads :--

(a) Lugard Road Extension. This work referred to and described in detail in paragraph 100 (a) of last year's Report was completed in March.

1921 Estimates, $30,000.00 Total Estimates, $90,000.00 Expenditure to 31/12/21 $88,165.42 1921 Expenditure, $22,383.79

(1) Road contouring hillside in Wongneichong and Tai Hang Valleys, Extension to Jardine's Lookout Hill. This road referred to in paragraph 100 (d) of last year's Report forms part of the project commenced in 1918 for the purpose of developing building sites in the two valleys above mentioned. A Contract was let in September to Mr. Ng Wah for a length of about a mile of a 20 foot road from the Tunnel outlet to Broadwood ridge, and substantial progress had been made by the close of the year. In connection with this undertaking a trace was cut from Broadwood ridge to a point near Taitam Gap, where it is proposed that this road should terminate, and a branch trace, to join Shaukiwan Road at Quarry Bay, was also cut.

1921 Estimates, $60,000.00 Total Estimates, $154,029.00 Expenditure to 31/12/21 $29,889.42 1921 Expenditure,

(c) Wanchai Road,--Widening to 42 ft.-Terms were agreed for the resumption of certain other properties, particulars of which are given in paragraph 41 of this Report. A small amount of raising and levelling was also effected.

1921 Estimates, $30,000.00 Total Estimates, $80,000.00 1921 Expenditure, $13.44 Expenditure to 31/12/21, $42,148.07

Page 525

Page 526

Edit History

2026-05-07 00:57:38 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Q 49 P.W.E. Hongkong. (c) Trough closet, (4 seats and 1 trough urinal), at Peak Road on site of old latrine. (d) Trough closet, underground, (2 seats and 1 trough urinal), at junction of Bonham Road with Eastern Street. (e) The conversion to a trough closet, (42 seats and 2 trough urinals), of the latrine at Wing Fung Street. These conveniences are all of the standard improved type. By the end of the year the work was well in hand with the exception of (e) which was delayed, owing to the necessity of having to demolish the existing brickwork which was found to be in poor condition. 1921 Estimates, $20,000.00 Total Estimates, 1921 Expenditure, Expenditure to 31/12/21 $5,685.12 $5,685.12 101. Roads :-- (a) Lugard Road Extension. This work referred to and described in detail in paragraph 100 (a) of last year's Report was completed in March. 1921 Estimates, $30,000.00 Total Estimates, $90,000.00 Expenditure to 31/12/21 $88,165.42 1921 Expenditure, $22,383.79 (1) Road contouring hillside in Wongneichong and Tai Hang Valleys, Extension to Jardine's Lookout Hill. This road referred to in paragraph 100 (d) of last year's Report forms part of the project commenced in 1918 for the purpose of developing building sites in the two valleys above mentioned. A Contract was let in September to Mr. Ng Wah for a length of about a mile of a 20 foot road from the Tunnel outlet to Broadwood ridge, and substantial progress had been made by the close of the year. In connection with this undertaking a trace was cut from Broadwood ridge to a point near Taitam Gap, where it is proposed that this road should terminate, and a branch trace, to join Shaukiwan Road at Quarry Bay, was also cut. 1921 Estimates, $60,000.00 Total Estimates, $154,029.00 Expenditure to 31/12/21 $29,889.42 1921 Expenditure, (c) Wanchai Road,--Widening to 42 ft.-Terms were agreed for the resumption of certain other properties, particulars of which are given in paragraph 41 of this Report. A small amount of raising and levelling was also effected. 1921 Estimates, $30,000.00 Total Estimates, $80,000.00 1921 Expenditure, $13.44 Expenditure to 31/12/21, $42,148.07 Page 525 Page 526
Baseline (Original)
Q 49 P.W.E. Hongkong. (c) Trough closet, (4 seats and 1 trough urinal), at Peak Road on site of old latrine. (d) Trough closet, underground, (2 seats and 1 trough urinal), at junction of Bonham Road with Eastern Street. (e) The conversion to a trough closet, (42 seats and 2 trough urinals), of the latrine at Wing Fung Street. These conveniences are all of the standard improved type. By the end of the year the work was well in hand with the exception of (e) which was delayed, owing to the necessity of having to demolish the existing brickwork which was found to be in poor condition. 1921 Estimates,... $20,000.00 Total Estimates,. 1921 Expenditure,... | Expenditure to 5,685.12 31/12/21 $5,685.12 101. Roads :-- (a) Lugard Road Extension. This work referred to and described in detail in paragraph 100 () of last year's Report was completed in March. 1921 Estimates,... $30,000.00 | Total Estimates,...... $90,000.00 Expenditure to 1921 Expenditure,... 22,383.79 31/12/21 88,165.42 (1) Road contouring hillside in Wongneichong and Tai Hang Valleys, Extension to Jardine's Lookout Hill. This road referred to in paragraph 100 (d) of last year's Report forms part of the project commenced in 1918 for the purpose of developing buildings ŝites in the two valleys above mentioned. A Contract was let in September to Mr. Ng Wah for a length of about a mile of a 20 foot road from the Tunnel outlet to Broadwood ridge, and substantial progress had been made by the close of the year. In connection with this undertaking a trace was cut from Broadwood ridge to a point near Taitam Gap, where it is proposed that this road should terminate, and a branch trace, to join Shaukiwan Road at Quarry Bay, was also cut. 1921 Estimates,...... $60,000.00 | Total Estimates,... Expenditure to 1921 Expenditure,... 29,889.42 31/12/21, $154,029.00 (c) Wanchai Road,--Widening to 42 ft.-Terms were agreed for the resumption of certain other properties, particulars of which are given in paragraph 41 of this Report. A small amount of raising and levelling was also effected. 1921 Estimates, $30,000.00 | Total Estimates,...... $80,000.00 1921 Expenditure,... 13.44 Expenditure to 31/12/21,.... 42,148,07 Page 525Page 526
2026-05-07 00:57:38 · Baseline
View content

Q 49

P.W.E. Hongkong.

(c) Trough closet, (4 seats and 1 trough urinal), at Peak

Road on site of old latrine.

(d) Trough closet, underground, (2 seats and 1 trough urinal),

at junction of Bonham Road with Eastern Street.

(e) The conversion to a trough closet, (42 seats and 2 trough

urinals), of the latrine at Wing Fung Street.

These conveniences are all of the standard improved type. By the end of the year the work was well in hand with the exception of (e) which was delayed, owing to the necessity of having to demolish the existing brickwork which was found to be in poor

condition.

1921 Estimates,... $20,000.00 Total Estimates,.

1921 Expenditure,...

|

Expenditure to

5,685.12

31/12/21

$5,685.12

101. Roads :--

(a) Lugard Road Extension. This work referred to and described in detail in paragraph 100 () of last year's Report was completed in March.

1921 Estimates,... $30,000.00 | Total Estimates,...... $90,000.00

Expenditure to

1921 Expenditure,... 22,383.79 31/12/21

88,165.42

(1) Road contouring hillside in Wongneichong and Tai Hang Valleys, Extension to Jardine's Lookout Hill. This road referred to in paragraph 100 (d) of last year's Report forms part of the project commenced in 1918 for the purpose of developing buildings ŝites in the two valleys above mentioned. A Contract was let in September to Mr. Ng Wah for a length of about a mile of a 20 foot road from the Tunnel outlet to Broadwood ridge, and substantial progress had been made by the close of the year. In connection with this undertaking a trace was cut from Broadwood ridge to a point near Taitam Gap, where it is proposed that this road should terminate, and a branch trace, to join Shaukiwan Road at Quarry Bay, was also cut.

1921 Estimates,...... $60,000.00 | Total Estimates,...

Expenditure to

1921 Expenditure,... 29,889.42 31/12/21,

$154,029.00

(c) Wanchai Road,--Widening to 42 ft.-Terms were agreed for the resumption of certain other properties, particulars of which are given in paragraph 41 of this Report. A small amount of raising and levelling was also effected.

1921 Estimates, $30,000.00 | Total Estimates,...... $80,000.00

1921 Expenditure,...

13.44

Expenditure to 31/12/21,....

42,148,07

Page 525Page 526

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.