Q 61
P.W.E. Kowloon.
egg-shaped storm-water drain in Ivy Street from Canton Road to Portland Street: 24" and 21" storm-water drain North-West of K.I.L. 1358.
The number of drain connections made was 136.
1920 Estimates, $30,000.00
1920 Supplementary Vote. 3,500.00
$33,500.00
1920 Expenditure (from Government funds), $30,183.14
1920 Expenditure (contributions by various lessees, &c.), 295.34
$30,478.48
138. Extensions of Lighting.-16 lamps were erected during year in the Kowloon District-8 are gas and 8 electric.
1920 Estimates, $1,500.00
1920 Expenditure, $885.22
139. Filling in Tidal Flat and cutting down hill between Taikoktsui and Fuk Tsun Heung.—This work comprises the removal of the ragged and rocky ridge of hills which divide Taikoktsui and Shamshuipo, filling in approximately 1,868,500 square feet (42.9 acres) of the Tidal Flat East of Taipo Road, protecting the reclamation area on the Southern boundary by a granite rubble-faced Sea Wall approximately 735 feet long, the construction of a nullah on the South-Eastern boundary approximately 1,200 feet long and the construction of a reinforced concrete bridge approximately 171 feet long over the nullah where it passes under Taipo Road.
The Contract for these works was awarded to Mr. Lam Woo, whose tender amounted to $325,173.60, the Contract Documents being signed on the 13th November.
Temporary offices and workshops were erected but, as the necessary wagons, rails, etc., have to be imported, active operations on the Contract works had not commenced by the end of the year.
1920 Estimates, $30,000.00 Total Estimates, $303,000.00
1920 Expenditure, Nil Expenditure to 31/12/20, Nil
140. Filling in low-lying area East of Shanghai Street.-No expenditure was incurred as the necessary filling was provided by the excavation obtained from the construction of the Taikoktsui to Kowloon City Road which is being carried out under 52 (a.), P.W.E., Main Roads, Kowloon.
1920 Estimates, $30,000.00
1920 Expenditure, Nil
Q 61
P.W.E. Kowloon.
egg-shaped storm-water drain in Ivy Street from Canton Road to Portland Street: 24" and 21" storm-water drain North-West of K.I.L. 1358.
The number of drain connections made was 136.
1920 Estimates,.
$30,000.00
1920 Supplementary Vote. 3,500.00
$33,500.00
1920 Expenditure (from Govern-
ment funds),..
$30,183.14
1920 Expenditure (contributions
the
by various lessees,' &c.), 295.34
-$30,478.48
138. Extensions of Lighting.-16 lamps were erected during year in the Kowloon District-8 are gas and 8 electric.
1920 Estimates,
1920 Expenditure,
$1,500.00 885.22
139. Filling in Tidal Flat and cutting down hill between Taikoktsui and Fuk Tsun Heung.—This work comprises the remov- al of the ragged and rocky ridge of hills which divide Taikoktsui and Shamshuipo, filling in approximately 1,868,500 square feet (42.9 acres) of the Tidal Flat East of Taipo Road, protecting the reclamation area on the Southern boundary by a granite rubble- faced Sea Wall approximately 735 feet long, the construction of a nullah on the South-Eastern boundary approximately 1,200 feet long and the construction of a re-inforced concrete bridge appro- ximately 171 feet long over the nullah where it passes under Taipo Road.
The Contract for these works was awarded to Mr. Lam Woo. whose tender amounted to $325,173.60. the Contract Documents being signed on the 13th November.
Temporary offices aud workshops were erected but, as the necessary wagons, rails, etc., have to be imported, active operations on the Contract works had not commenced by the end of the
1920 Estimates, $30,000.00 Total Estimates,
1920 Expenditure....
Vil.
year.
Expenditure to
31/12/20,
.$303,000.00
Nil.
140. Filling in low-lying area East of Shanghai Street.-No expenditure was incurred as the necessary filling was provided by the excavation obtained from the construction of the Taikoktsui to Kowloon City Road which is being carried out under 52 (a.), P.W.E., Main Roads, Kowloon.
1920 Estimates,.. 1920 Expenditure,
$30,000.00 Nil.